Skip to content
TerraElm

Glossary

58 terms you will meet on a lot, in a quote or on a job, each linked to the guide that explains it in full.

#

811
The national number to call before you dig. It routes your request to your state's one-call center, which notifies utilities to mark buried lines. The request is free. More: Utility locates and the 811 color code

A

Aeration
Pulling small plugs of soil from a lawn, or perforating it, to relieve compaction so air, water and roots can move through. It is usually paired with overseeding. More: Aeration, overseeding and sod
Allowance
A set dollar amount in a contract for something not yet chosen, such as plants or pavers. If your choice costs more, the difference is usually added to the bill. More: How outdoor quotes are built

B

Bid
A contractor's written offer to do a defined job for a stated price. Bids are only comparable when they cover the same scope, units and materials. More: Compare bids side by side
Boundary survey
A drawing by a licensed surveyor that locates a parcel's lines and corners from the record and from measurements on the ground. It is the base drawing for placing a fence, wall or pool. More: Read your plat and survey

C

Caliper
The trunk diameter of a nursery tree, measured at a set height above the soil. Nurseries size and price young trees by caliper, not by height. More: Landscape design and plans
Certificate of insurance
A one-page summary from an insurer showing what coverage a contractor carries, the limits and the dates. Ask the insurer or agent to send it directly, and confirm the policy is current. More: Contractor licenses and insurance
Change order
A written amendment to a signed contract that changes the work, the price or the schedule. Agree to it in writing before the extra work starts. More: Change orders, warranties and lien waivers
Compaction
Soil or base material pressed so tightly that little air or water moves through it. It hurts lawn roots, and it is the goal under a patio or walkway. More: Patio and paver installation
Crown reduction
Shortening a tree's height or spread by cutting branches back to a side branch large enough to take over. It is different from topping, which leaves stubs. More: Tree trimming and pruning
Cubic yard
A volume of 3 feet by 3 feet by 3 feet, or 27 cubic feet. Mulch, soil and gravel are usually sold by the cubic yard. More: Garden beds, mulch and edging

D

DBH
Diameter at breast height: the width of a tree trunk measured 4.5 feet above the ground. Tree removal and permit rules often use it to define a protected tree. More: Tree removal and stump grinding
Deposit
Money paid before work starts. State law may cap it, so check your state's rule before you pay a large one. More: Contracts, deposits and payment schedules
Drip irrigation
Low-pressure tubing and emitters that put water at the root zone of beds, shrubs and trees instead of spraying it through the air. More: Sprinkler systems and irrigation service

E

Easement
A recorded right for someone else, such as a utility, to use a strip of your lot for a stated purpose. You keep ownership, but you may not be able to build on the strip. More: Setbacks, easements and rights of way
Encroachment
A fence, wall, roof edge or other structure that crosses a lot line or sits inside an easement or setback. A survey is how you find one. More: Find your property lines
ET (evapotranspiration)
The water a lawn or garden loses to evaporation from soil and transpiration from leaves. Weather-based sprinkler controllers use it to set watering times. More: Sprinkler systems and irrigation service

F

French drain
A trench with perforated pipe in gravel that collects water and carries it to a place where it can drain. Where it may discharge is a local rule. More: Drainage and grading basics
Frost depth
How deep the ground freezes in your area. Fence posts, deck footings and some walls are set below it, and the local building office sets the number. More: Deck building and decking materials

G

Grade
The slope of the ground, or the finished ground level. A slope is often written as a percent: rise divided by run, times 100. More: Drainage and grading basics
Grading
Reshaping the ground so water moves away from the house and toward a safe outlet. Large grading changes can need a permit. More: Drainage and grading basics

H

Hardiness zone
A USDA map zone based on the average coldest winter temperature, in 10-degree steps. It tells you whether a perennial or shrub is likely to survive your winters. More: Winter prep for the lot
Hazard tree
A tree with a defect that could make part or all of it fall onto something of value, such as a house or a play area. A qualified arborist assesses the risk. More: Storm damage and hazard trees
HOA covenants (CC&Rs)
Recorded rules of a homeowners association, covering fences, colors, trees and sheds. They bind the lot even when the city allows the project. More: HOA rules and your lot

I

Impervious surface
A surface water cannot soak through, such as a roof, driveway or concrete patio. Some cities cap it per lot or bill stormwater fees by it. More: Drainage and grading basics
IPM (integrated pest management)
An approach that starts with identifying the pest and checking its numbers, then uses habitat changes, barriers and other methods first. Pesticides are one tool, used when needed. More: Pest control contracts and safety
ISA Certified Arborist
A credential from the International Society of Arboriculture for a person who has passed its exam. It is not a state license; ask your state whether tree work needs one. More: Arborist assessments and tree health

L

Ledger board
The board bolted to the house that carries one edge of an attached deck. Its fasteners and flashing are a common inspection point. More: Deck building and decking materials
Lien
A legal claim on a property for an unpaid debt. In many states an unpaid contractor or supplier can file one on the home; the rules vary by state. More: Change orders, warranties and lien waivers
Lien waiver
A document in which a contractor or supplier gives up the right to file a lien for the amount paid. Many owners ask for one with each payment. More: Change orders, warranties and lien waivers
Linear foot
One foot measured along a line. Fences, edging and gutters are priced per linear foot. More: Quote units: foot, visit and tree
Lot
A parcel of land shown as a numbered unit on a recorded plat. Lot size is the whole parcel; yard size is only the part you can use. More: Lot size vs yard size
Lot coverage
The share of a lot covered by buildings and, in some codes, other hard surfaces. Zoning may set a maximum, so a new patio can count against it. More: Permits for outdoor projects

M

Monument
A physical marker of a lot corner, usually an iron pin or a concrete post. Do not move one; ask a surveyor if it is missing or out of place. More: Find your property lines
Mulch
A layer of bark, wood chips or similar material over bed soil that holds moisture and slows weeds. It is sold by the cubic yard or by the bag. More: Garden beds, mulch and edging

O

Overseeding
Spreading grass seed over an existing lawn to fill thin spots or switch grass types. It is often done right after aeration. More: Aeration, overseeding and sod

P

Paver base
The compacted layer of crushed stone under pavers, topped with a thin bed of sand. Its depth and compaction decide whether a patio stays flat. More: Patio and paver installation
Permit
Written approval from the city or county to do regulated work, such as building a fence, deck or pool. Rules and fees vary by place. More: Permits for outdoor projects
Plat
A recorded map that divides land into lots, blocks and streets. It is filed with the county and shows lot dimensions and recorded easements. More: Read your plat and survey
Pool barrier
A fence, wall or other enclosure that keeps children from reaching a pool unseen. Height, gate latches and gaps are set by local code, and a barrier does not replace supervision. More: Pool barriers and safety rules
Pool cover
A sheet or panel that covers pool water for the off-season or for safety. Safety covers are built to a standard; a plain winter tarp is not a safety cover. More: Pool opening, closing and seasonal care

R

Retainage
A part of each payment, or of the final payment, held back until the work is finished and accepted. It gives you leverage to get punch-list items fixed. More: Contracts, deposits and payment schedules
Retaining wall
A wall that holds soil at a change in level. Walls above a certain height often need a permit or engineered plans; the height varies by city. More: Retaining walls and terraces
Right of way
A strip of land set aside for a road, sidewalk or utilities. It often reaches past the pavement into your front yard. More: Setbacks, easements and rights of way

S

Scope of work
The written list of what a contractor will and will not do on a job. Two bids with different scopes cannot be compared by price alone. More: How outdoor quotes are built
Setback
The minimum distance a structure must sit from a lot line, set by local zoning. Fences, sheds and pools can have their own setbacks. More: Setbacks, easements and rights of way
Shock
A large, one-time dose of sanitizer added to pool water to clear chloramines or algae. Follow the product label and keep people out of the water until levels are safe. More: Pool water chemistry basics
Square foot
An area of 1 foot by 1 foot. Patios, sod and turf work are priced per square foot, which you can total with the material order calculator. More: Quote units: foot, visit and tree
Stump grinding
Cutting a stump into chips with a machine, usually below ground level. The roots stay in the ground, and the chips may be left or hauled off for a separate charge. More: Tree removal and stump grinding
Swale
A shallow, broad channel in the ground that carries runoff across a lot. Filling or blocking one can send water toward a neighbor or your house. More: Drainage and grading basics

T

Takeoff
A count of the materials a job needs, measured from a plan or lot drawing: linear feet of fence, square feet of paving. The fence and deck takeoff tool does a simple one. More: Fence installation
Termite bait station
A monitoring or baiting unit set in the soil around a house. Termites feed on it and carry the active ingredient back to the colony, which can take months. More: Termite inspection and treatment
Thatch
A layer of dead and living stems and roots between grass blades and soil. A thin layer is normal; a thick one blocks water and can call for dethatching. More: Aeration, overseeding and sod
Topping
Cutting main branches back to stubs, which leaves a tree with weak regrowth. Tree-care standards advise against it. More: Tree trimming and pruning

U

Utility locate
Paint or flags placed on the ground by utility locators to mark buried lines in the area you plan to dig. The color shows the type of line. More: Utility locates and the 811 color code

V

Variance
Permission from a local board to depart from a zoning rule, such as a setback, for a stated reason. It is a legal process; ask the planning office. More: Setbacks, easements and rights of way

Z

Zone (irrigation)
A group of sprinkler heads on one valve that run together. Lawn, beds and shaded areas usually sit on separate zones because they need different amounts of water. More: Sprinkler systems and irrigation service
Zoning
City or county rules that set how land may be used and built on, including setbacks and height limits. They differ by place and by neighborhood. More: Permits for outdoor projects