Skip to content
TerraElm

Trees

Every cut changes the tree, so start with the reason

What trimming and pruning include, when the cuts do least harm, what to check on your lot first, and how a crew's bid is put together.

By TerraElm Editorial Team Updated 8 min read

Best general timing
Before spring growth
Topping
Avoid it
Priced by
Tree, job or hour
Near power lines
Call the utility
Illustration: a lot plan with a house, two canopy circles overlapping a side line, and a dashed utility line crossing one canopy

The short answer

Pruning is the removal of chosen branches for a stated reason: dead wood, clearance, structure or light. The International Society of Arboriculture (ISA) says every cut can change how a tree grows, and that growth and wound closure are best if pruning comes before the spring growth flush. Avoid topping. Check city permit rules, oak wilt timing and the utility lines overhead before anyone cuts, and compare bids that name the trees, the cuts and the cleanup.

Trimming, pruning and what a job includes

People use "trimming" and "pruning" for the same work. A crew removes selected branches to take out dead or weak wood, lift the canopy off a roof or walkway, thin dense growth, or shape a young tree so it holds up later. ISA lists these common reasons: removing dead branches for safety, letting light and air reach plants below, and corrective or preventive work. It also says young trees benefit from structural pruning, because it reduces corrective work later.

  • Cleaning. Taking out dead, diseased or broken branches.
  • Raising. Removing low limbs for clearance over a driveway, roof or sidewalk.
  • Thinning. Reducing foliage density at the edge of the crown so light and wind pass through.
  • Reduction. Shortening a limb back to a side branch that is at least one-third the diameter of the cut stem, per ISA.
  • Not usually included. Stump grinding, tree removal, spraying, fertilizing, and hauling away wood. Each is its own line; see tree removal and stump grinding.

When to prune

ISA says light, routine removal of weak, dead or diseased limbs can happen at any time of year with little effect. For anything larger, growth and wound closure are best when pruning comes before the spring growth flush. ISA also advises against heavy pruning of live tissue just after that flush, especially on weak trees. A Penn State Extension page adds that winter is a good time to look over your trees and decide what needs pruning.

Why topping is the cut to refuse

Topping means cutting branches back to stubs, or to side branches too small to take over as the new leader. ISA calls it perhaps the most harmful pruning practice known. It stresses the tree, invites decay, costs more over time and ruins the natural shape. An Ohio State Extension fact sheet says an ISA-credentialed arborist would not recommend it, and that the main exception is meeting utility line clearance standards.

The same Ohio State sheet says a conscientious arborist will not use climbing spikes on a tree that is staying in the landscape, because spikes wound the bark. If a bid says "top," "hat-rack" or "reduce by half," ask what standard the cut follows and which branch each cut ends at.

Check the lot and the rules first

A tree is not always yours to cut at will. Local ordinances protect some trees, and many cities treat the tree in the strip beside the street as public. Two examples show how far the rules differ.

Two cities, two kinds of pruning rule
PlaceWhat the city saysSource
Austin, TexasA Tree Ordinance Review Application is required to remove a regulated tree, to prune 25% or more of its canopy, or to disturb its critical root zoneCity of Austin Development Services, residential trees page
Portland, OregonAny work on a heritage tree needs a permit, and so does pruning a street tree, apart from tiny suckers or self-sown trees under 1/2 inchPortland Permitting and Development

Your own city or county may have neither rule or a stricter one. Ask the planning or urban forestry office, then check your HOA covenants: HOA rules and your lot. If a limb crosses a property line or sits over an easement, start with your survey and setbacks, easements and rights of way. A dispute over a neighbor's overhanging branches is a legal question, so ask an attorney or your local office.

DIY or hire

A homeowner's reasonable limit is small work from the ground: snapping off a dead twig you can reach or trimming a shrub. Anything above head height, anything that needs a ladder, a rope, a lift or a chain saw, and anything near a roof or wire belongs to a trained crew. Tree work is hazardous, and ISA says it should be done only by people trained to work safely in trees.

Many people look for an ISA Certified Arborist. That is a voluntary credential from ISA, not a state license, and ISA itself says certification cannot guarantee quality work. Ask each bidder for a certificate of insurance sent by the insurance agent, and call the insurer to confirm it is current. See contractor licenses and insurance for how to check licenses where your state requires one.

How a pruning quote is built

Ohio State Extension says tree work is usually priced as a single price for the job or as an hourly rate plus materials. A North Carolina State Extension guide adds that a contract should state the total as a per-tree or whole-job price, and that an hourly bid should include a "not to exceed" cap. The drivers are the same on every bid.

Tree size and reach

Height, spread and how much of the crown is being cut decide the crew hours and the equipment.

Access

A gate, a fence or a tight side yard can mean hand-carrying wood or bringing a smaller machine.

Equipment

Climbing, a bucket lift or a crane are priced differently. Ask which one the crew plans to use.

Cleanup and wood

Chipping, hauling, and who keeps the logs and chips should be written down.

Number of trees

Several trees on one visit usually share the travel and setup, so ask how that shows on the bid.

Get two or three bids, as extension guides advise, with the same trees and the same cuts. Ask for the start and end dates, the standard the work follows (ISA's A300 pruning standard is the usual one; ask for it in writing), cleanup, and payment terms. Never pay in advance, and be wary of door-to-door offers after storms. Put them side by side using quote units by the foot, the visit and the tree and compare bids side by side. Add the line to your plan in the job budget.

Steps to a clean pruning job

  1. Write the reason for each cut: clearance, dead wood, structure or light.
  2. Check the rules. Ask the city about regulated, heritage and street trees, then your HOA.
  3. Look up. Note any wire, and call the utility if a tree touches or crowds it.
  4. Pick the window. Aim before spring growth, and ask your extension office about oak wilt or other local timing.
  5. Get two or three written bids that name trees, cuts, standard, equipment, cleanup and total.
  6. Confirm insurance by calling the insurer, then sign a contract with dates and a payment schedule.

Questions homeowners ask

How much of a tree can be pruned at once?

ISA gives no percentage for how much canopy to remove, and it says to prune only with a clear reason. A city may set its own limit: Austin, for example, requires an application to prune 25% or more of a regulated tree's canopy. Ask your arborist and your city.

What is the best month to prune?

ISA says light removal of dead or weak limbs works any time, and that growth and wound closure are best if pruning comes before the spring growth flush. Oaks in oak wilt areas have their own rules, such as the Texas February-through-June advice. Ask your county extension office.

Is topping ever acceptable?

ISA warns against it, and an Ohio State Extension sheet says its main exception is utility line clearance. For a tree that has outgrown its spot, ISA's alternatives include reducing limbs to a large enough side branch, or replacing the tree.

Do I need a certified arborist?

ISA Certified Arborist is a voluntary credential, not a license, and some extension guides recommend it without requiring it. Check insurance and written scope either way. See arborist assessments and tree health.

Sources

Checked on November 20, 2026. Tree permits, protected-tree lists, oak wilt timing and contractor licensing vary by city, county and state. Austin and Portland are examples, and the oak wilt dates are Texas advice, not a rule for your yard. Ask your city's planning or urban forestry office and your county extension office.