Licenses
Check the license and the coverage yourself, before you sign
How licensing differs by state and trade, three official state pages as examples, and how to verify a certificate of insurance with the insurer.
By TerraElm Editorial Team Updated 8 min read
- Who licenses
- Varies by state, trade
- Where to look up
- The state board's page
- Proof of coverage
- Certificate of insurance
- Confirm it with
- The insurer, by phone
The short answer
Whether a yard, tree, pest, fence or pool contractor needs a license depends on the state, the trade and the size of the job. Look the business up on the state board's own site, using the name and number on your contract. Ask for a certificate of insurance that comes from the insurance agent, then call the insurer to confirm the policy is in force. A website or a truck door saying a business is licensed is not proof.
Licensing differs by state and trade
There is no single national license for outdoor work. States license some trades, register others and leave some to cities and counties. Landscaping, tree work, pest control, pools and fencing are often handled differently, even inside one state. Dollar thresholds can matter too: California, for one, licenses work above a set size. So the first question is not "is this company licensed" but "which office, if any, licenses this trade here".
| Agency | What its page says | Page |
|---|---|---|
| California Contractors State License Board | A license is required for work of $1,000 or more in labor and materials combined, or any project that needs a permit or workers. Landscaping (C-27), tree service (D-49) and pool (C-53) work are named classifications. | Construction Checklist 2025; Fast Facts: Landscaping |
| Texas Department of Agriculture, Structural Pest Control Service | It licenses and regulates pest management professionals who apply pesticides in and around structures, through business and certified applicator licenses and apprentice registrations. | Structural Pest Control Service |
| Washington Department of Labor and Industries | It requires construction contractors to register, with a bond and general liability insurance. It offers an online lookup, and registered contractors must show their registration number in advertising and bids. | Register as a contractor |
The three differ in kind. California licenses by classification and job size. Texas licenses pest control applicators through the agriculture department. Washington registers contractors rather than licensing them. Your state may do none, some or all of these. Ask your state licensing board, or your city or county building office, which rules apply to your job.
What the California pages add
California shows how fine the lines can be. Its contractors board defines the tree service class as pruning trees and removing trees, limbs or stumps, including grinding. Its landscaping fact sheet says maintenance gardeners who work on a regular paid basis generally do not need the landscaping license, but that construction-related work does, and pools and spas need the pool classification or a subcontractor who holds it. The board also says active tree service contractors must carry workers' compensation insurance whether or not they have employees. That is one state's rule. Do not assume it holds elsewhere.
How to check a license
- Get the exact name and license or registration number from the bid or contract. The federal consumer agency says a contract should list the contractor's name, address, phone and license number.
- Find the right office. Search for your state's licensing board for that trade, or ask your city or county. For pest control, that is often the state agriculture department.
- Use the office's own lookup, such as California's license check or Washington's verify tool. Do not rely on a copy of a certificate the contractor sends.
- Read the status and class. Check that it is active, that the class matches your job, and note any discipline listed.
- If your state does not license the trade, ask the office what it does require, then lean harder on insurance, references and a written contract.
What a certificate of insurance shows
A certificate of insurance is the paper that says a business has coverage. Florida's chief financial officer advises homeowners to request one to verify general liability insurance. A consumer guide from the insurance regulators' association says the proof should show the company's name, phone number and policy number. Read it for the following.
- Named insured. It should match the business name on your contract and the license record.
- Type of coverage. General liability covers damage to your property and injury to others. Workers' compensation covers the contractor's workers. They are separate lines.
- Policy number and insurer. You need both to verify it.
- Effective and expiration dates. The policy must cover the dates of your job.
- Limits. Compare them to the size of the job and ask your own insurance agent whether they look adequate.
Verify it with the insurer
A certificate the contractor hands you is only as good as the policy behind it. A state university extension guide for hiring tree professionals says to have the certificate, with proof of liability for personal and property damage, sent directly from the insurance agent, then to call the insurer to confirm the policy is current. The insurance regulators' guide also says to call the insurance company to verify coverage. Look up the insurer's number yourself rather than using one printed on a form you were handed.
- Ask the contractor to have the agent send the certificate to you directly.
- Call the insurer and give the policy number and the business name.
- Ask whether the policy is in force on your job dates and what lines it covers.
- Ask about workers' compensation separately. Florida's guide points homeowners to the state workers' compensation division for coverage or exemption.
- Keep a copy with the contract, and repeat the check if the job runs past the expiration date.
Trade notes for yard work
Trees
Ask for proof of an arborist credential such as ISA Certified Arborist. Never climb or use a chain saw near power lines. Call a qualified arborist or the utility.
Pest control
Applicator rules vary by state, and the label governs how a product is used. Ask for the applicator license number and check it with your state agency.
Pools
Pool work can fall under its own class or rule. California, for one, names a separate pool classification. Barriers and covers are covered in pool barriers and safety rules.
Fences and landscaping
Rules differ by state and city. Your building office can tell you what is required. See fence installation.
Once credentials check out, compare the bids themselves in compare bids side by side, and review the contract in contracts, deposits and payment schedules.
Questions homeowners ask
Is a city business license the same as a trade license?
Not necessarily. A business registration or tax receipt can be a different record from a state trade license. Ask which office issues which, and look up the trade license on the state board's site.
Can I rely on the certificate the contractor gives me?
Treat it as a starting point. Ask for the agent to send it directly, then call the insurer to confirm the policy is in force for your dates.
What if my state does not license the trade?
Ask your state agency or your city or county what it requires. If nothing is required, insurance, references and a detailed written contract matter more.
Who is liable if a worker is hurt on my lot?
That is a legal and insurance question and the answer depends on your state and the contractor's coverage. Ask your own insurance agent and, if needed, an attorney, before work starts.
Sources
- California Contractors State License Board: Construction Checklist 2025
- California Contractors State License Board: Fast Facts, Landscaping
- California Contractors State License Board: D-49 Tree Service Contractor
- Texas Department of Agriculture: Structural Pest Control Service
- Washington Department of Labor and Industries: Register as a contractor
- NAIC: 10 things you can do to avoid contractor fraud and abuse
- Florida Chief Financial Officer: Don't be a victim, prevent contractor fraud and abuse
- NC State Extension: How to Hire a Tree Care Professional
- Federal Trade Commission: How to Avoid a Home Improvement Scam
Checked on November 20, 2026. California, Texas and Washington are examples of three different approaches, not rules for your address. Licensing, registration, dollar thresholds and insurance requirements vary by state, trade, city and county. Ask your state licensing board or your building office, and confirm any coverage with the insurer.
Next on the lot
-
Quote guide
Compare bids side by side
A fence bid $700 lower by the foot ends up $640 higher once removal, gate and permit are added.
-
Quote guide
Contracts, deposits and payment schedules
Deposit caps differ: 10% or $1,000 in CA, one third in MD and MA. Pay in steps and know your cancel right.
-
Job
Tree trimming and pruning
When to prune, why topping hurts, and how a crew prices the job by the tree or the hour.