Cookies and browser storage
TerraElm sets no analytics or advertising cookies. Here is the short list of what can end up in your browser, who puts it there and why.
Last updated
The short answer
TerraElm uses no analytics cookies, no advertising cookies, no tracking pixels, no session recording and no social buttons that report on you. Since nothing optional exists, the cookie notice has no accept or reject choice. It states what is stored and closes with one button.
Two things can be stored. One is a small entry that remembers you closed the notice. The other is whatever Cloudflare’s bot check needs on pages that have a form.
The cookie notice entry
Pressing “OK, got it” on the notice writes one entry to your browser’s local storage:
- Name:
terraelm-cookie-notice - Value:
1 - Purpose: keeps the notice from reappearing on every page
- Lifetime: until you clear this site’s data
Local storage is a space that a site’s own scripts can read. Browsers do not send it to servers on their own, and TerraElm’s servers never receive this entry. If your browser blocks storage, you will see the notice on each visit.
Cloudflare’s bot check on form pages
The contact page and the Lot Lines sign-up page carry a Cloudflare Turnstile check. Its script is requested only on pages with a form. It loads once the page has finished loading, or earlier if you scroll, tap or type.
Turnstile looks at technical signals from your browser and connection, such as your IP address and browser type, to decide whether a person is there. Cloudflare may keep small technical entries in your browser while it does. Cloudflare says the signals serve to detect and block bots and to improve that detection, not to identify, profile or target you. Its Turnstile privacy addendum explains more.
The check guards the forms against spam, and TerraElm cannot turn it off. If your browser blocks it, a form may refuse to send. In that case, email [email protected].
Visits from Lot Lines links
Some Lot Lines links end with a short code after a # character. A page opened from such a link reads the code, strips it from the address bar and sends one report to TerraElm’s own /collect address. That report uses no cookie and no browser storage. A page opened without a code sends nothing, and a reload sends nothing, since the code is already gone. The privacy policy lists what the report holds and who receives it.
Some email links pass through TerraElm’s server before the page opens. That step sets no cookie either.
What we leave out
- analytics tools and cookies
- advertising cookies and retargeting
- cookies that follow you from site to site
- session recording
- sale or sharing of browsing data
The calculators under Lot math run in your browser and keep nothing you type.
Clearing or blocking storage
Open your browser’s settings and look for “Cookies and site data” or a similar name. Find terraelm.com there and remove it. That deletes the terraelm-cookie-notice entry, and the notice will return on your next visit.
You may also block cookies and storage for every site, or only this one. Pages will still read normally. The notice will keep coming back, and a form may fail its bot check.
Questions
Write to [email protected] or use the contact page. The privacy policy covers everything else about your information.