Yard, lot and outdoor work
Measure the lot first. Then ask for bids.
TerraElm explains how to plan, measure and budget lawn, tree, fence, patio and pool work on a US lot, so every bidder prices the same yard.
— of yard on — (driveway 500 ft² and patio 300 ft² assumed). Open the full lot plan.
Four sheets for one lot
-
10 guides
The lot
Size, lines, records, setbacks, utilities and drainage: what the property is before anyone prices work on it.
-
28 guides
Outdoor work
Lawn, landscape, trees, pests, fences, decks, patios and pools: what each job includes and how it is sold.
-
9 guides
Quotes and bids
Units, line items, licenses, contracts and the offers that arrive uninvited.
-
4 guides
Seasons
Four resets a year by climate zone, each task linked to the guide behind it.
Six kinds of outdoor work
Each guide covers what the job includes, the unit it is priced in and what it needs from your lot.
-
Lawn care
Mowing, feeding, aeration and water: what each lawn service is and how it is sold.
-
Landscape and planting
Design, beds, turf replacement and retaining walls.
-
Tree care
Pruning, removal, tree health and storm damage.
-
Pest control
Termites, mosquitoes, stinging insects and lawn insects, plus the contract fine print.
-
Fences, decks and patios
Fencing, decking, shade structures and paved surfaces.
-
Pools
Building a pool, the safety rules around it and the yearly routine.
Lot math
Five tools that run in your browser and keep nothing.
-
Lot plan
Enter the lot, the house and the hard surfaces. Get the yard area, the share under roof and paving, and the buildable box inside the setbacks.
-
Job budget
List the jobs with the unit prices you were quoted or found, adjust national prices to your state, and add a contingency.
-
Material order
Turn an area and a depth into cubic yards, sod pallets, paver counts or a slab pour, with a waste allowance.
-
Fence and deck
Posts, rails, pickets and post length for a fence run; joists, board length and posts for a deck.
-
Pool volume
Gallons for rectangular, round and oval pools from the dimensions and the average depth, plus fill time from your flow rate.
Lot Lines, once a week
The season's yard-care calendar, a do-it-yourself tip, and how to get the lot ready for winter or summer. Free, with a one-click unsubscribe.
Start with one of these
-
Lot guide
Read your plat and surveyThe parts of a plat and a survey, where to get them and what to read first.
-
Job
Fence installationLayout, permits, post depth and how a fence quote is built by the linear foot.
-
Quote guide
Compare bids side by sideA fence bid $700 lower by the foot ends up $640 higher once removal, gate and permit are added.
On the record
-
· Data
State price levels loaded from BEA's 2024 dataBudget estimates reflect broad state price differences, not local bids.
-
· Reference
Glossary and questions and answers addedYou can look up a term from a quote or a survey without leaving the site.
-
· Email
The Lot Lines weekly email opens for sign-upYou can follow the site by email each week.