Skip to content
TerraElm

Lot plan: how much yard do you have?

Enter the lot, the house and the hard surfaces. The plat redraws as you type, and the numbers under it are the ones to hand to a bidder.

The lot (a rectangle)
What is built on it
Setbacks from your city or county

The setbacks above are placeholders. Your zoning office has the real ones; see setbacks, easements and rights of way.

Schematic: shapes show proportions; the figures below are exact. Dashed line: the setback box. Pink diamonds: corner pins.
Yard (not built on)
—
Lot area
—
Under roof and paving
—
Buildable box inside setbacks
—

How it works

The tool treats the lot as a rectangle: width times depth gives the lot area. The house footprint, driveway, patio and other hard surfaces are added up, and the yard is the lot minus that total. One acre is 43,560 square feet, so a lot in square feet divides by that to give acres.

The buildable box is the rectangle left after the setbacks: the width minus the two side setbacks, times the depth minus the front and rear setbacks. It is a first look. Easements, corner-lot rules and an HOA can shrink it further.

Worked example

A 60 by 120 foot lot is 7,200 square feet, or 0.165 acres. With a 1,800 square foot house, 600 of driveway and walks, 300 of patio and 100 of shed, the hard surfaces total 2,800 square feet (38.9% of the lot) and the yard is 4,400 square feet. With setbacks of 25 feet front, 20 rear and 5 each side, the box is 50 by 75 feet, or 3,750 square feet.

Odd-shaped lots: split the lot into rectangles, add their areas, and enter the total as an equivalent width and depth. Measure the real numbers from your plat and survey. Give the yard figure to every bidder so the quotes cover the same area; see compare bids side by side.