Skip to content
TerraElm

Compare

A lower bid is often a shorter list of what is included

How to put two or three outdoor bids on one sheet, fill the gaps, and compare the totals instead of the headline rates.

By TerraElm Editorial Team Updated 7 min read

Compare
Totals, not rates
Bids to gather
At least three
First step
Same scope for all
Gaps to fill
Ask each bidder
Illustration: two bid sheets side by side over a lot plan, with a matching fence run highlighted and a gate symbol on each

The short answer

Consumer agencies advise getting several written bids, not choosing the lowest automatically, and asking about big differences. In the illustration below, Bidder B's fence is cheaper by the foot and $700 lower on paper. After old-fence removal, a gate and a permit are added, Bidder B is $640 higher. Build one sheet, give each bidder the same lot facts, and ask for the missing lines.

Make the bids describe the same job

You cannot compare numbers until the jobs match. Start with your own sheet: the run or area you measured, the height and material you want, the gates, what comes out and what goes in. Give that sheet to every bidder. The fence and deck takeoff and the lot plan tool give you measured numbers to hand over.

Several consumer agencies give the same advice on bids. Virginia's regulator suggests written estimates from at least three contractors, and says not to pick the lowest automatically and to ask about differences in price. California's contractors board also says to get estimates from at least three contractors and to call their references. A tree-care guide from a state university extension adds that skill and reputation can matter more than a low bid.

A worked example, fence against fence

This is an illustration with round numbers, not market prices. Both bidders see the same 140-foot run. Bidder A quotes an all-in rate of $32 per foot: $32 x 140 = $4,480, with old-fence removal, one walk gate and the permit included. Bidder B quotes $27 per foot: $27 x 140 = $3,780, and says nothing about the rest. Bidder B looks $700 cheaper ($4,480 - $3,780). Then you ask.

Illustration only: the same 140-foot run, before and after asking each bidder the same questions
LineBidder ABidder B, first quoteBidder B, after asking
Fence, 140 ft$4,480 at $32/ft, all-in$3,780 at $27/ft$3,780
Remove old fenceIncludedNot stated$840 ($6/ft x 140)
Walk gateIncludedNot stated$350
Permit and applicationIncludedNot stated$150
Total$4,480$3,780$5,120

Bidder B's total after asking is $3,780 + $840 + $350 + $150 = $5,120. That is $640 above Bidder A ($5,120 - $4,480). Per foot, B is $5,120 divided by 140, or $36.57, against A's $32.00. The headline order flipped. This does not mean Bidder A is the right choice. It means the first comparison was not a comparison.

Walk the lot with each bidder if you can. Show the line you marked, the gate locations, the slope and the spot where a truck would park. Bidders who see the same lot are more likely to write the same scope, and the written scope is the thing you are comparing. If you cannot meet on site, send the same measurements, a sketch and photos to everyone, and say so in the email so the record shows what each bidder was told.

Another gap, the stump

Tree bids hide gaps in the same way. Say Bidder A quotes $900 to remove a tree, stump grinding included. Bidder B quotes $750 to remove it. Bidder B's grinding is a separate $180 line. The totals are $900 and $750 + $180 = $930, so B is $30 higher, not $150 lower. A state extension guide tells homeowners to clarify whether a removal includes grinding the stump and surface roots, and what cleanup is done.

The lines to add to every sheet

  • Removal and haul-away of old fence, paving, brush, stumps or debris.
  • Gates and special parts, counted and priced one by one.
  • Permit, survey and HOA approval, with who pays and who files.
  • Utility marks. The Common Ground Alliance says to confirm your contractor will contact 811 or do it yourself.
  • Ground conditions. Rock, roots and slope, and what each adds if found.
  • Cleanup and restoration. What the yard looks like when the crew leaves.
  • Schedule and terms. Start date, deposit, payment steps and how changes are priced.

Many of these also appear in how outdoor quotes are built, and the units are explained in quote units explained. Costs that vary by lot are covered in what drives the price on your lot.

Beyond the price

Once the lines match, price is one of several things to weigh. Check that each bidder has the credentials your state or city asks for, and that insurance is current, as set out in contractor licenses and insurance. Ask for references and call them. The federal consumer agency also advises asking for a written contract, and not paying the full amount up front. If one bid is far from the others, ask the bidder to explain it.

Steps to a one-page comparison

  1. Measure and write your scope. Run or area, height, material, gates, what comes out.
  2. Send the same sheet to at least three bidders. Walk the lot with each one if you can.
  3. Fill a table with a row for each line above and a column for each bidder.
  4. Mark every blank as included, extra or unknown, then ask each bidder to fill the unknowns.
  5. Add up each column and compute the per-unit total so the bids line up.
  6. Check credentials and terms before you choose, then sign a written contract.

Questions homeowners ask

How many bids should I get?

Virginia's regulator and California's contractors board both suggest at least three written estimates. For a small job, two may be enough, but the same lines still apply.

Should I take the lowest bid?

Not automatically. The federal consumer agency and Virginia's regulator both say not to choose the lowest bidder by default. Ask why bids differ, and compare totals after the missing lines are added.

Can I tell a bidder what the others quoted?

Share your scope, which helps every bidder price the same job. You do not need to share another bidder's number. Ask each one to price your scope and to list what is excluded.

What if the bids are far apart even after I add the lines?

Ask each bidder to walk you through the difference. A gap in materials, crew size, ground assumptions or timing is a clear answer you can check against the scope.

Sources

Checked on November 20, 2026. The fence and stump figures are arithmetic illustrations, not market prices. Virginia and California are examples of agency advice, not rules for your address. Contractor rules, 811 wait times and permit duties vary by city, county and state; ask your state licensing board or building office.