Price drivers
Two lots of the same size can get two very different bids
The facts about your lot that move a quote, how to measure the ones you can, and what to tell every bidder so the numbers compare.
By TerraElm Editorial Team Updated 7 min read
- Lot vs work area
- Often quite different
- Slope formula
- Rise / run x 100
- Before digging
- Call 811, each job
- Give bidders
- The same lot facts
The short answer
A bid prices your lot, not an average lot. The facts that move it are work area, access, slope, ground, buried lines, rules, disposal and timing. In the illustration below, an 80 by 120 foot lot of 9,600 square feet has only 6,700 square feet of lawn to mow, about 70 percent. A 3 foot rise over 12 feet is a 25 percent slope. Measure these first and give every bidder the same numbers.
Work area is not lot area
A quote can be priced on a number that is not the one you would use. Lot area includes the house, the drive, the walks and the beds. Mowing prices the grass. Mulching prices the beds. Paving prices the surface. Start by finding the area the job really touches.
Here is an illustration with round numbers. A lot is 80 feet by 120 feet, so its area is 80 x 120 = 9,600 square feet. The house is 40 by 40, or 1,600 square feet. The driveway and walks add 800, and the beds add 500. The lawn is 9,600 - 1,600 - 800 - 500 = 6,700 square feet, which is 6,700 divided by 9,600, or about 70 percent of the lot.
If a bidder priced a mowing visit from the 9,600 figure, they priced 2,900 more square feet than you have (9,600 - 6,700). That is about 43 percent more area than the grass (2,900 divided by 6,700 is 0.43). Ask which area each bidder used. The lot plan tool works out the yard area and the share under roof and paving from your numbers.
Access decides how long the work takes
Crews price time. Anything that slows them shows up in the bid. Tell bidders about these before they ask.
- Gate and path width. A narrow gate can keep a mower, a skid steer or a wheelbarrow of stone out of the back yard. Measure the narrowest point.
- Distance from the truck. Material carried by hand over a long path costs labor that the same material dropped at the work area does not.
- Overhead limits. Wires, branches and a low pergola change which equipment fits and how a crew works.
- Storage and staging. Where stone, mulch or a dumpster can sit without blocking a drive or a neighbor.
Put the gate width and the carry distance in your scope. They are measurable, and they make the bids comparable. For long runs, the fence and deck takeoff gives counts you can check against a bidder's list.
Slope, soil and what is underground
Slope is rise over run. If the ground climbs 3 feet over 12 horizontal feet, the slope is 3 / 12 = 0.25, or 25 percent. Slopes slow equipment, change how posts, walls and paving are set, and affect how water moves across the lot. Ask each bidder how they would handle yours, and read drainage and grading basics before you finalize a plan that changes the grade.
Roots, rock and soft or wet soil are found as the work goes in, and bidders should say how they price them. The buried lines are the other unknown. The Common Ground Alliance says to contact 811 a few business days before digging, that fences and small plantings count as digging, and that you should call again for each new job because erosion and root growth can shift lines. If you hire a crew, confirm who calls. See utility locates and the 811 color code.
Rules, permits and paperwork
A permit, a survey or an HOA approval adds fees and days. Whether the work needs a permit depends on your city or county, so ask the building or planning office, and ask your HOA if you have one. Then ask each bidder whether the permit fee and the filing are in the price. Two bids that differ on this are not for the same job. More in permits for outdoor projects.
Disposal, cleanup and timing
Taking material away is work. Old fence, brush, sod, soil and stumps all have to go somewhere. California's contractors board says a contract should detail cleanup, debris removal and site security, and a state extension guide says tree contracts should say what cleanup is done and when. Put disposal in the scope for every job that makes waste.
Timing can change a bid too. Crews may be busy in one month and open in another, and some work, such as planting and paving, depends on the weather. Ask whether the price or the start date changes if the job moves. Off-season booking and asking for better terms covers how to ask without pushing for a promise nobody can make.
A one-page lot sheet for bidders
- Lot and work area. Lot area, then the grass, bed or paving area for this job, in square feet.
- Lines. Mark the property line, any easements and the run or area on a survey copy.
- Access. Narrowest gate width, carry distance and where a truck and a dumpster can sit.
- Slope and wet spots. Rise over run for the steepest part, and where water stands.
- Rules. Permit status, HOA approval and the date the 811 marks were requested.
- Waste. What must be hauled and what stays.
Hand the same sheet to every bidder, then put the answers side by side in compare bids side by side. Turn the chosen total into a plan in the job budget tool.
Questions homeowners ask
Why did the same job get different bids on my lot?
Common reasons are a different work area, different assumptions about access and ground, and different items in or out of the scope. Ask each bidder to list their assumptions and compare them.
Does a bigger lot always cost more?
Not always. The work area, access and slope matter as much as the lot area. A large lot with easy access can be quicker to work than a small one with a steep, narrow back yard.
Do I have to measure the slope?
A rough measure helps. Divide the rise by the run and multiply by 100. If the ground is steep or wet, say so in your scope and ask how the bidder would handle it.
Who should call 811 for my job?
Either you or the contractor can, but confirm it before work starts. The Common Ground Alliance advises homeowners to check. See the 811 guide.
Sources
- Common Ground Alliance: Before You Dig (811)
- California Contractors State License Board: Construction Checklist 2025
- NC State Extension: How to Hire a Tree Care Professional
- Federal Trade Commission: How to Avoid a Home Improvement Scam
Checked on November 20, 2026. The lot, area and slope figures are arithmetic illustrations, not measurements of any real lot or market prices. Permit rules, 811 wait times and HOA rules vary by city, county and state. Ask the building or planning office, the state 811 center and your HOA.
Next on the lot
-
Quote guide
Compare bids side by side
A fence bid $700 lower by the foot ends up $640 higher once removal, gate and permit are added.
-
Lot guide
Drainage and grading basics
Read grade, size roof runoff (748 gallons per inch on 1,200 sq ft) and move water without harming a neighbor.
-