Skip to content
TerraElm

Fence and deck takeoff

A takeoff counts parts from dimensions. Pick fence or deck, enter your plan's numbers, and use the counts to check a quote.

From the maker's panel or your plan.

2 to 4.

Your choice. Applied to pickets and deck boards.

Posts
—
Sections
—
Rails
—
Pickets
—
Post length
—

How it works

Fence. Sections are the run divided by the post spacing, rounded up. A straight run has one more post than sections; each corner or end adds a post and each gate adds one. Rails are sections times rails per section. Pickets are the run in inches divided by picket width plus gap, plus waste. For post length, at least a third of a post goes into the ground and never less than 2 feet, so a post is the larger of 1.5 times the height and the height plus 2 feet. Your code may require more where the ground freezes.

Deck. Joists are the length in inches divided by the joist spacing, rounded up, plus one. Board rows are the width in inches divided by board width plus gap, rounded up; board length is rows times the deck length, plus waste. Posts under one beam are the length divided by the post spacing, rounded up, plus one. Joist and beam sizes depend on span, wood and load, so they come from your plan, the building department or a designer, not from this tool.

Worked examples

A 96 foot, 6 foot tall fence with 8 foot spacing, 3 rails, 1 gate and 2 corners has 12 sections, 16 posts, 36 rails and 210 pickets 5.5 inches wide. Each post is 9 feet long with 3 feet buried. A 16 by 12 foot deck with joists at 16 inches has 13 joists and needs about 458 linear feet of 5.5 inch boards with 10% waste.

Use the counts to compare bids: see fence installation, deck building and decking materials and compare bids side by side. Call 811 before any post hole.