Skip to content
TerraElm

Decks

A deck is a structure first and a floor second

What goes into a deck, the rules that decide whether you need a permit, how wood and composite boards differ, and what to write on the quote.

By TerraElm Editorial Team Updated 9 min read

Footing depth (DCA 6)
12 in or below frost
Guards required (DCA 6)
Over 30 in above grade
Denver building permit
30 in or more off ground
Priced by
Square foot of deck
Illustration: a lot plan with a deck drawn against the back of the house, footing circles marked beneath it and a pink flag at the corner of the deck

The short answer

A deck is footings, a frame, boards, a guard and stairs, and the frame matters most. The American Wood Council's deck guide puts footings at least 12 inches below grade or below the frost line, whichever is deeper, and asks for guards on decks more than 30 inches above grade. Permit rules differ by city: Denver, for one, requires a building permit at 30 inches or more. Decking boards, whether treated wood or composite, come after the frame, the ledger and the local rules.

What a deck job includes

A deck crew lays out the footprint, digs and pours footings, sets posts and a beam, and attaches a ledger to the house or builds a freestanding frame. Then it installs joists, decking, a guard and stairs. Flashing where the deck meets the house is part of the structure, not a trim detail. Stain, lighting, a roof, hauling off an old deck and the permit fee are often separate lines, so ask for each.

  • Footings and posts. They carry the load to the soil.
  • Ledger and flashing. The connection to the house, which the guide treats with the most care.
  • Frame. Beam and joists, sized for the span.
  • Decking. The boards you see; see the comparison below.
  • Guard and stairs. The parts people lean on and fall from.

What the American Wood Council guide says

The American Wood Council publishes DCA 6, a prescriptive guide for residential wood decks. It is based on the 2015 International Residential Code, and it says the code controls where the two differ. It also says the local authority must approve the construction, so it cannot promise that a plan passes in your city. Your jurisdiction may use a newer code edition, so treat the numbers as a starting point for the conversation with your building office.

Selected points from DCA 6 (2015 IRC basis, 2018 copyright)
TopicWhat the guide saysWhy it matters
FootingsBear on undisturbed soil at least 12 inches below grade or below the frost line, whichever is deeper; ask the local authority for the frost lineFrost heave moves shallow footings
LedgerAttach with 1/2 inch lag screws or bolts and washers; lead anchors are prohibited; use corrosion-resistant flashingThe ledger carries load into the house
Where not to attachNot to brick or other veneers, hollow masonry, or cantilevered floor overhangs such as bay windows; build a freestanding deck insteadSome walls cannot hold a ledger
GuardsRequired on decks more than 30 inches above grade; the guide sizes hold-down anchors for guards up to 36 inches highYour local height rule may differ
Decking boardsUse 2 inch nominal lumber or span-rated decking, spaced about 1/8 inch apartGaps let water drain and wood move

The guide has limits. It covers single-level decks attached to the house, and it excludes decks with large concentrated loads such as hot tubs. It also excludes decks that take heavy snow loads. Post height tops out at 14 feet under its tables. If your deck is tall, freestanding, multi-level or carries a hot tub, ask the building office whether you need an engineer's drawing.

Do you need a permit?

Permit thresholds are local. The three examples below use different tests: height, size, and whether the deck is attached. Read your own city's page, not another city's.

Three cities, three answers (pages checked November 20, 2026)
PlaceWhat the page saysSource
Denver, ColoradoUncovered decks 12 inches or more off the ground need a zoning permit. At 30 inches or more they also need a building permit. Plans show footing size and depth.Denver Community Planning and Development, residential decks page
Austin, TexasA deck is exempt only if it is 200 square feet or less, no more than 30 inches above grade, not attached to a dwelling, not used for egress and not in a flood hazard area.City of Austin, work exempt from building permits
Portland, OregonA deck more than 30 inches high needs a building permit; a deck not more than 30 inches above grade needs none.Portland Permitting and Development, outside work permits

Notice that a deck attached to the house is not exempt in Austin even when it is low. Denver adds a zoning permit at a lower height, so a deck can need two approvals. A homeowners association may add rules on size and materials: see HOA rules and your lot. For the whole process, read permits for outdoor projects.

Wood and composite decking compared

Decking material is a maintenance choice more than a structural one. The statements below come from an industry guide and one maker's installation sheet, so check the instructions for the exact product you are quoted.

What the sources say about each type
TypeWhat the source saysWhat you maintain
Pressure-treated woodThe Treated Wood Council guide says to use hot-dipped galvanized or stainless fasteners, brush preservative on cut ends, and let the wood dry before finishing, about 60 days in its example.Unstained boards turn gray, so plan to clean and refinish
Composite (one maker's guide, May 2020)Leave a 1/4 inch side gap, set end gaps by installation and hot-day temperature, and keep 2 inches clear between joists and grade. The maker says color can lighten over 60 to 90 days.Wash with soap and water; the maker says not to blast with a pressure washer
Other boards (cedar, tropical hardwood, PVC)This page did not open a maker's specification for these, so it gives no numbers.Ask for the maker's installation guide and warranty

The same industry guide says that wood treated for above-ground use belongs at least 6 inches off the soil. Where a deck sits low, ask whether the joists and posts are rated for ground contact. Fasteners are a separate item. DCA 6 calls for hot-dipped galvanized, stainless steel, silicon bronze or copper fasteners with preservative-treated wood. Within 300 feet of salt water it asks for stainless steel 304 or 316. It also says aluminum flashing should not touch copper-bearing treated lumber.

How a deck quote is built

Many deck quotes start from a price per square foot of deck, then add lines. Measure the footprint first. A 12 by 16 foot deck is 192 square feet. With 2 by 6 boards that are 5.5 inches wide and a 1/8 inch gap, each board takes up 5.625 inches, so 144 inches of width needs 25.6 boards. Round up to 26 runs of board. Use the fence and deck takeoff for the full list, and the material order tool to add waste.

Footprint and height

Square feet, height above grade, and whether it is attached or freestanding. Height drives guards, stairs and permits.

Footings and frame

Number and depth of footings, lumber size and the ledger fastener. A thin line here is a question to ask.

Decking and rail

Board type, fastener type, and the guard system as its own line.

Permit, inspection and removal

Who pulls the permit, who pays the fee, and who removes an old deck.

Compare bids with identical footprints and materials, as in compare bids side by side.

DIY, hire and timing

A low, freestanding platform on firm ground is a reasonable DIY job if your city allows it without a permit. A deck on a ledger, a tall deck, or one with a hot tub is different. The ledger is a structural connection to the house, and the guide limits where it may be used. Hiring shifts that risk to someone else, but check the license and insurance first: contractor licenses and insurance.

Request the underground marks before digging any footing. The Common Ground Alliance says to contact 811 a few business days before digging, and its page lists fences and gardens among the projects. See utility locates and the 811 color code. For timing, ask when the ground allows full-depth footings where you live.

Questions homeowners ask

How deep do deck footings go?

The American Wood Council guide says at least 12 inches below grade or below the frost line, whichever is deeper. Ask your building office for the local frost depth, because the local requirement controls.

Do I need a permit for a deck?

It depends on the city. Denver requires a building permit at 30 inches or more off the ground, and Austin exempts only small, low, detached decks. See permits for outdoor projects.

Can I attach a deck to brick veneer?

The wood deck guide says not to attach a ledger to brick or other veneers, hollow masonry, or cantilevered overhangs. A freestanding deck is the usual alternative. Ask your building office.

Is composite decking maintenance free?

No. The maker's guide cited here says to wash it with soap and water, avoid pressure-washer blasting and expect some color change in the first months.

Sources

Checked on November 20, 2026. Permit thresholds are examples from three cities, not a rule for your address; deck rules, frost depth and adopted code editions vary by city, county and state. DCA 6 is based on the 2015 IRC, and your jurisdiction may enforce a different edition. The composite figures come from one maker's 2020 sheet. This page lists no prices because they depend on size, height, material, access and region.