Skip to content
TerraElm

Privacy policy

TerraElm keeps its data collection small on purpose. This policy lists what reaches us when you write, join Lot Lines or open an email link, who handles it, and what you can ask us to do.

Last updated

The short version

  • We collect your name and email address only if you write to us or join Lot Lines.
  • We do not sell or share your personal information, and no business receives your details from us.
  • We set no analytics or advertising cookies.
  • Links in Lot Lines can report that you opened a page, and that report goes to our email service.
  • You can leave the list, or ask to see, fix or delete what we hold, by emailing [email protected].

The rest of this page gives the detail.

Who runs the site and what this policy covers

TerraElm is an independent educational site about planning, measuring and budgeting outdoor work on a US residential lot, at terraelm.com. The operator of the site is TerraElm, 24 Greenway Plaza, Suite 1900, Houston, TX 77046, United States. Where this policy says “we,” it means that operator.

This policy applies to the site’s pages, its five calculators, the contact form, the Lot Lines sign-up and the Lot Lines email. It does not apply to other companies’ sites or emails, even when we link to them or a sponsor appears in an issue. Each of those has its own privacy notice.

TerraElm has no lead form. We do not hand your details to contractors, landscapers, arborists, pest-control firms, pool builders or lenders, and we send no text messages. The site is written for adults in the United States.

What we collect

If you We receive
Use the contact form Your name, email address, chosen topic and message, plus your confirmation that you understand we cannot advise on your own lot or project
Join Lot Lines Your first name and email address, and a record of your agreement together with the version of the sign-up wording on the page (version 2026-11-20)
Open a page from a Lot Lines link A visit note, described under “Visits from our emails” below
Read the site without doing either Nothing that identifies you to us; Cloudflare, which delivers the pages, sees ordinary connection details

Technical details that travel with every form

Each form goes to our own server, which checks it and stores it in our own database. Along with what you type, a submission carries the time it arrived, your IP address, your browser type, language, country and network, and the address of the page it came from, as your browser reports that page. We keep these to show when consent was given, to catch abuse, and to find faults.

Bot check

The contact and sign-up forms ask Cloudflare Turnstile to confirm that a person is typing. Turnstile reads signals from your browser and connection, including your IP address and browser type. According to Cloudflare, it uses them to block bots and refine that blocking, not to identify or profile visitors. See the Turnstile privacy addendum. Each form also has a hidden field that real visitors never fill. A submission with that field filled is quietly dropped.

Visits from our emails

Some links in Lot Lines end with a short code after a # character. The code stands for the email that was sent to you, so the visit can be matched to your subscription.

Opening such a link starts a short script on our page. It reads the code, takes it out of your address bar, and posts one small note to /collect on our own domain. The note holds the code and a few browser facts: your time zone, your language list, screen and window size, display pixel ratio, processor core count, whether the browser reports itself as automated, and the page that referred you. Our server adds your IP address, browser type, language header, country and network name, then passes the note on to the email service that sends Lot Lines. We do this to separate real readers from the automated scanners that fetch every link in a message, and to learn which issues get read. No cookie is involved. A page opened without a code sends nothing.

A second route exists for some email links, including unsubscribe links. They pass through our server on the way to the page. On that route the server gives the email service your IP address and browser details (browser type, language, country, network and referring page). The service logs the click or the unsubscribe and tells our server where to send you. This route sets no cookie.

What stays on your device

The calculators work inside your browser, and the figures you type are not sent to us. Closing the cookie notice stores one small entry on your device so the notice stays away. We never receive it. The cookies page lists all browser storage.

We run no analytics tools, advertising cookies, tracking pixels or session recording.

Why we use it

We use personal information to:

  • reply to your messages and look into problems you report;
  • send Lot Lines to people who signed up;
  • keep proof of when and how you agreed to receive it;
  • learn which issues are read, and filter out scanner traffic;
  • guard the forms and the site against spam and abuse;
  • comply with the law, respond to legal demands and enforce the terms of use.

We do not build advertising profiles, and we make no decisions about you from this information.

Who handles it

Companies that help us run the site

  • Cloudflare delivers the pages, runs the server code behind the forms and the visit note, and provides Turnstile.
  • Our email service sends Lot Lines, holds the subscriber list and receives the visit notes and click records above.
  • Our mailbox provider hosts the inbox at [email protected].

Each handles personal information to provide its service to us.

Sponsors and advertisers

Lot Lines may contain labeled sponsorships or ads. Sponsors and advertisers get no name, email address or other personal detail about you from us. A sponsor’s link takes you to that sponsor, whose own privacy notice then governs.

No sale, no sharing

TerraElm does not sell personal information. It does not share it for cross-context behavioral advertising either, which California’s law calls “sharing.” The Lot Lines list is neither sold nor shared. With no affiliate links at launch and no lead form, no business gets your request or details from us.

We may disclose information if the law requires it, to answer a court order or subpoena, to protect people or property, or to look into fraud. If the site changes hands, the information may go with it, and the new owner must treat it under this policy.

Email from TerraElm

Signing up for Lot Lines means you agree to receive a weekly email at the address you gave. The wording beside the sign-up box reads: “Send me Lot Lines, the weekly TerraElm email, at the address I entered. I can unsubscribe at any time.” Nothing on the site requires you to subscribe.

Every issue carries an unsubscribe link, and you may also ask us by email. We use your address to send Lot Lines and to answer you if you write. We send no text messages. If that ever changes, we will ask for separate consent and revise this policy first.

Your privacy choices

This section covers leaving the list, seeing what we hold, and having it fixed or deleted. Send any request to [email protected], use the contact page and choose “Something else,” or post it to the address in “Contact us about privacy” below. A request costs nothing, and using your rights will not change how we treat you.

Leave the email list

Use the unsubscribe link at the foot of any Lot Lines issue. Or write to us from the address you signed up with and put “Unsubscribe” in the subject line.

Opt out of sale, sharing or targeted advertising

We do none of these, so there is nothing to switch off today. If you would like that confirmed in writing, ask. If our practice were to change, we would tell you beforehand and give you an opt-out before it began.

Global Privacy Control

Global Privacy Control (GPC) is a browser setting that asks websites not to sell or share your personal information. Because TerraElm does neither, GPC alters nothing here. We read it as the opt-out it is, and would keep honoring it if our practice changed.

Access, correction and deletion

Depending on your state, you may be able to:

  • learn what personal information we hold about you, where it came from and who has received it, and obtain a copy;
  • have wrong information corrected;
  • have your information deleted;
  • opt out of sale, sharing, targeted advertising and profiling, none of which we do.

Write to us with “Privacy request” as the subject and tell us what you want. We match your request against our records using the email address you used, and may ask one follow-up question. An authorized agent can act for you with your signed permission, which we may check with you. We respond within the period your state’s law sets, usually 45 days, and say so if we need longer.

After a deletion we may keep a bare note that you asked, and anything the law requires us to keep. Our service providers’ backups and logs run on their own schedules, so deletion there is not instant.

If we decline a request, answer our reply with “Privacy appeal” as the subject and we will look again. If you are still not satisfied, your state’s attorney general can hear a complaint.

California

California’s Consumer Privacy Act, as amended by the California Privacy Rights Act, gives California residents the rights above and protection from being treated worse for using them. For the past 12 months, our practices were:

  • Collected: identifiers (name, email address, IP address); internet activity (the page a form came from and the browser type, language, country and network sent with it, and visits from our emails, with browser and device facts and country-level location); and the content of messages you send.
  • Sources: you, your browser and our service providers.
  • Purposes: the ones listed under “Why we use it.”
  • Sold or shared: nothing.
  • Disclosed for a business purpose: any of the above, to the service providers named in this policy.
  • Sensitive personal information: none collected.
  • Retention: see “How long we keep information.”

We do not knowingly sell or share the information of anyone under 16. California’s “Shine the Light” law lets residents ask which third parties received their information for direct marketing in the past year. For us the answer is none. Use the same email address to ask.

Texas and other states

The Texas Data Privacy and Security Act lets Texas residents confirm, access, correct, delete and obtain a copy of their personal data, and opt out of its sale, of targeted advertising and of certain profiling. Colorado, Connecticut, Virginia, Oregon and other states have comparable laws. Each law has its own scope, and whether it covers a given business depends on its terms. Wherever you live, send requests and appeals through the routes above and we will handle them under the rights your state gives you. A Texas resident unhappy with an appeal result may contact the Texas Attorney General.

Children

TerraElm and Lot Lines are written for adults and are not aimed at children. We do not knowingly gather information from anyone under 13, nor sell or share information about anyone under 16. If you think a child has sent us something, tell us and we will remove it.

How long we keep information

We hold information only while a purpose above needs it. Our usual periods:

  • Contact messages: two years after your last message.
  • Lot Lines subscribers: as long as you stay subscribed, followed by a note that you unsubscribed so we do not write to you again.

The law or a dispute may require us to hold something longer. Cloudflare and our other providers keep their own logs and copies under their own policies.

How we protect it

Pages reach you over encrypted HTTPS, and form data travels encrypted to our own server. We never ask for passwords, account numbers or Social Security numbers. No system is flawless, so we cannot promise information will never be exposed. If a breach touches your information, we will notify you as the law requires.

Contact us about privacy

Email [email protected] or write to TerraElm, 24 Greenway Plaza, Suite 1900, Houston, TX 77046, United States. Mark the subject line or envelope “Privacy.”

Changes to this policy

When this policy changes, the “Last updated” date at the top changes with it. Where a change alters how we use information you already gave us, we will ask for your consent if the law requires. A new source of income, such as affiliate links, will appear first on how we make money and here.