Skip to content
TerraElm

Outdoor work

Each job explained the same way: what it includes, what the quote is built from, and what to check on your lot.

Lawn care

Mowing, feeding, aeration and water: what each lawn service is and how it is sold.

Landscape and planting

Design, beds, turf replacement and retaining walls.

Tree care

Pruning, removal, tree health and storm damage.

Pest control

Termites, mosquitoes, stinging insects and lawn insects, plus the contract fine print.

Fences, decks and patios

Fencing, decking, shade structures and paved surfaces.

Pools

Building a pool, the safety rules around it and the yearly routine.