Skip to content
TerraElm

Landscape design

A landscape plan starts with a scaled drawing of your lot

What goes on a base plan, how plant zones and sun fit in, who draws the plan, and what to ask so a design quote means the same thing from every bidder.

By TerraElm Editorial Team Updated 8 min read

Base plan scale
1 in = 10 ft (small lot)
Start from
Your survey or plat
Plant zones
USDA map, by zip code
Priced by
Ask how it is charged
Illustration: a scaled lot plan with a house outline, a curved bed along the back line, a compass arrow and pink survey flags at the corners

The short answer

A landscape plan is a scaled drawing of your lot that shows what stays, what goes and what is added, in a sequence you can price. Good plans start from the survey, add utilities, slopes, sun and soil, and then place use areas before any plant is named. Check the USDA hardiness zone for your zip code, call 811 before digging, and ask how the designer charges, because design-only and design-build quotes are not the same product.

What a landscape design job includes

A design job produces drawings and a plant list. It is not the planting. Some firms draw plans only, some draw and install, and some install from a sketch on a napkin. The first question for any bidder is which of those you are buying.

  • Base plan. A scaled drawing of the lot as it is now, with lines, buildings and utilities.
  • Site analysis. Slopes, drainage, sun and shade, soil, existing plants and views.
  • Concept plan. Where the use areas go: seating, play space, paths, beds, screening.
  • Planting plan. Which plants go where, how many, and at what size.
  • Hardscape details. Walls, paths, patios and edging, shown with materials and dimensions.

What a plan does not include on its own: permits, utility marks, grading beyond a sketch, irrigation design and a maintenance schedule. Each can be added, and each should be named in writing if you expect it.

Start with a base plan drawn from your survey

Mississippi State University Extension lists six steps for a home landscape plan: draw a base plan, inventory and analyze the site, assess your family's needs, locate the use areas, develop them, then make the planting plan. For a property under an acre, it suggests a scale of 1 inch to 10 feet, and says to redraw your survey at that scale. Where you have no survey, it says to hire a surveyor, especially for fences or paving near a property line.

The scale is easy to check. At 1 inch to 10 feet, a lot 60 feet wide and 120 feet deep draws as 6 inches by 12 inches. Our guide to reading your plat and survey explains where the dimensions come from, and the lot plan tool turns them into areas you can use in a budget.

What the same extension guide puts on a base plan and on the overlay
LayerWhat goes on itWhere to get it
Boundary and structuresProperty lines, house, drives, walks, patios, fences, walls, downspouts, spigots, AC unitsYour survey, plus a tape measure
UtilitiesUtility boxes and poles, hydrants, septic tanks and field drains, off-site lines nearbySurvey notes, utility maps, then 811 marks
OrientationCompass directions and the scaleSurvey north arrow
Site inventory (overlay)Slopes and drainage, soils, existing plants, sun and shade, summer and winter windsYour own observation over a few weeks
Analysis (overlay)Tree health, erosion, drainage needs, lawn condition, invasive plants, good and poor viewsYour notes; an arborist for tree questions

Plant zones, sun and soil

The USDA Plant Hardiness Zone Map helps you judge which perennial plants are likely to survive winter at your address. It is based on winter minimum temperatures, in 10-degree zones with 5-degree half zones. The current map is the 2023 edition, an update of the 2012 map, and you find your zone by entering your zip code. The zone covers winter cold only. It does not account for summer heat, rainfall, wind or soil.

The EPA's WaterSense program says to plan around how you will use the space, your local climate, sun and shade, and how much maintenance you want. It also says to group plants with similar watering needs into hydrozones, and to test soil for nutrients, pH, composition and organic matter. A county extension office can tell you what soil tests are offered where you live.

Cold hardiness

Read the zone for your zip code, then check each plant tag against it. A tag that says zone 6 to 9 means the plant is rated for that winter range.

Sun and shade

Mark where shade falls in the morning, at noon and late afternoon on the base plan. Trees and the house move it by season.

Water

Put thirsty plants near the spigot and the patio, and drought-tolerant ones at the edges. This is the hydrozone idea.

Soil

Compacted or poorly draining soil shows up in the inventory. Fix it or choose plants that tolerate it before buying.

Who draws the plan, and what to ask

Garden centers, design-build landscape firms, independent landscape designers and landscape architects all draw plans. Their scope differs. Some states license landscape architects and limit who may use the title or stamp a drawing, and the rules vary by state, so ask your state licensing board if a stamped drawing matters for a permit. For the contractor side, see contractor licenses and insurance.

  • Is the plan a separate fee, or credited if you hire the firm to install it?
  • Do I own the drawings, and may I take them to other bidders?
  • Does the plan include a survey-based base plan, or will you work from my sketch?
  • How many concept revisions are included, and what does an extra one cost?
  • Does the planting plan list plant names, sizes and counts, so quotes can be compared?
  • Who checks for permits, HOA approval and the 811 marks?

How design and installation are priced

TerraElm does not quote prices for design. They depend on lot size, the number of drawings, whether the firm also installs and who is doing the work. Designers charge in different ways: a flat fee for a set of drawings, an hourly rate, or a share of the installation. Ask which one applies and put it in writing.

For installation, a good plan lets every bidder price the same plants, the same edging and the same hardscape. Give each of them the same drawing, then read compare bids side by side. The job budget tool adds the lines up, and planning the order of lot projects helps you decide what to do first.

Phasing a plan over several seasons

A plan does not have to be built in one season. Heavy work such as grading, walls and drainage goes first, because it disturbs everything near it. Paths and patios come next, then beds and trees, then the small plants. Planting windows depend on your climate. Ask your county extension office for local dates, and read the beds, mulch and edging guide for the bed side of the work.

DIY or hire

Drawing a base plan, noting sun and drainage over a few weeks, and sketching use areas are all reasonable homeowner tasks. They cost time, not much else, and they make every later quote better. Hire a designer when the lot has a slope, a drainage problem, a pool or a wall in the picture, or when the HOA or city wants a stamped drawing.

Steps to a usable landscape plan

  1. Pull your survey or plat and confirm the dimensions with a tape.
  2. Draw the base plan at a set scale, with north, buildings, utilities and the property lines.
  3. Note sun, slope and drainage on an overlay for a few weeks.
  4. Look up your hardiness zone by zip code and test the soil.
  5. Place use areas before you choose plants, then request 811 marks before any digging.
  6. Get written quotes against the same plan, with plants, sizes and counts listed.

Questions homeowners ask

Do I need a professional to draw a landscape plan?

No. A base plan drawn at scale from your survey, with an overlay for sun, slope and drainage, is a homeowner task. A designer helps most on slopes, drainage and large lots.

What scale should a plan use?

Mississippi State University Extension suggests 1 inch to 10 feet for a property under an acre. The lot plan tool gives areas for the same dimensions.

How do I find my USDA hardiness zone?

Enter your zip code on the USDA Plant Hardiness Zone Map. The 2023 map is based on winter minimum temperatures, so also check heat, rain and soil for the plants you pick.

Should I call 811 before I plant?

Yes, for most digging, even a shrub bed. The Common Ground Alliance says many lines are only inches deep. See the 811 guide.

Sources

Checked on November 20, 2026. Scale and plan contents follow one extension guide; other guides differ in detail. Rules on who may draw, stamp or sell a landscape plan, and on permits, vary by state, city and county.