Beds and mulch
A bed is measured in square feet, but mulch is bought by the yard
How to turn bed dimensions into cubic yards, how deep mulch should go (sources differ), and what a bed job does and does not include.
By TerraElm Editorial Team Updated 8 min read
- 1 cubic yard
- 27 cubic feet
- Mulch depth
- 1 to 4 in, by source
- Keep off trunks
- Leave a gap, no volcanoes
- Call 811
- Before digging beds
The short answer
Bed work has four parts: layout, bed prep, planting and mulch, with edging as a separate line. Mulch is sold by the cubic yard (27 cubic feet), so multiply area by depth in feet and divide by 27. Extension and EPA sources give different depths, from 1 to 4 inches, so ask your county extension office. Keep mulch off tree trunks, and call 811 before digging a new bed.
What a bed job includes
A new bed or a bed refresh is a short list of steps. Quotes often bundle them, so ask which ones the price covers.
- Layout. Marking the shape with a hose or paint, then cutting the edge.
- Bed prep. Removing grass or old plants, loosening soil, adding compost where the soil needs it.
- Planting. Plants are usually a separate line from labor.
- Edging. A spade-cut trench, or a border of steel, plastic, stone or brick. Priced by the linear foot.
- Mulch. Material, delivery and spreading, often three separate costs.
Not included unless written down: removing sod or old plants, hauling debris, soil testing, irrigation changes and any grading. Where the bed replaces lawn, read lawn removal and low-water landscaping.
Check the lot before you dig a bed
The Common Ground Alliance says any digging calls for 811, planting included, and notes that many utilities are buried just a few inches below ground. A small flower bed counts. Wait for every utility to respond, then dig. Details are in utility locates and the 811 color code.
Two other checks. Beds should not sit on top of a recorded easement without asking the holder first, which your survey and plat show; see setbacks, easements and rights of way. And water has to go somewhere. A bed that dams runoff against the house causes more trouble than it fixes, so read drainage and grading basics before reshaping the soil.
How deep mulch should go
Sources disagree, and the difference changes how much you buy. EPA WaterSense advises organic mulch three to four inches deep in landscape beds, kept a few inches from tree trunks. The University of Maryland Extension says to keep mulch shallow, one to three inches, for trees and shrubs, and about 3 inches clear of the trunk. Both agree on the gap at the trunk. Mulch piled against the bark, the so-called volcano, can cause decline.
| Topic | What the source says | Source |
|---|---|---|
| Depth in beds | Three to four inches of organic mulch | EPA WaterSense |
| Depth around trees and shrubs | One to three inches of wood chips | University of Maryland Extension |
| At the trunk | Leave a gap; mulch should not touch the bark | Both sources |
| Material | Bark and permeable fabric generally better than plastic; avoid bark on steep slopes and drainage paths | New Mexico State University |
| Rock mulch | Can hold heat and raise water loss in sunny spots | EPA WaterSense; New Mexico State University |
Soil, climate and plant type all matter, so ask your county extension office which depth it recommends for your area. Add mulch to bring it up to depth. Piling a new layer on top of an old one is how beds end up too deep.
How much mulch to order
A cubic yard is 27 cubic feet. The formula is area in square feet, times depth in feet, divided by 27. Convert inches to feet by dividing by 12.
| Depth | Calculation | Result |
|---|---|---|
| 2 inches | 400 x (2 / 12) = 66.7 cubic feet, divided by 27 | About 2.5 cubic yards |
| 3 inches | 400 x (3 / 12) = 100 cubic feet, divided by 27 | About 3.7 cubic yards |
| 4 inches | 400 x (4 / 12) = 133.3 cubic feet, divided by 27 | About 4.9 cubic yards |
Measure the bed in pieces if it is curved: split it into rectangles and circles, then add the areas. The material order calculator does the arithmetic. Bagged mulch states its volume on the label, so divide your cubic feet by that number.
Edging, fabric and bed prep
Edging
A cut trench needs only labor. A border of steel, plastic, stone or brick is a material cost. Ask for either by the linear foot.
Weed fabric
New Mexico State University says permeable fabrics generally beat plastic, and plastic belongs only where soil must stay dry. Ask whether fabric is in the quote.
Compost and soil
Test the soil first. Compost helps where soil is poor, but more is not better. Ask for the depth and the area in the line.
Grass removal
Smothering with cardboard takes about 6 to 8 weeks, according to University of Maryland Extension. A rented sod cutter strips the sod instead, and the same guide says to reuse that sod, since it holds topsoil.
Size and shape the bed on the plan
Draw the bed on your scaled plan before you mark it on the ground. A hose or a line of paint shows the curve in real space, and it is cheap to move. Group plants with similar water needs together, which EPA WaterSense calls hydrozones, and keep turf and shrubs in separate zones because they need different amounts of water.
Around a tree, University of Maryland Extension says to spread mulch out as far as the branches reach, if possible. A wide ring also keeps mowers and string trimmers away from the bark. Bigger beds mean more mulch to buy and more edge to maintain, so size them to the plants you will actually put in. The landscape design and plans guide covers drawing the plan.
How a bed quote is priced
Bed work is priced by several units at once. Ask for each line to name its unit so you can add it up.
- Bed prep: per square foot of bed, or per hour of labor.
- Edging: per linear foot, with the material named.
- Mulch: per cubic yard, delivered, with the depth stated; spreading may be a separate line.
- Plants: per plant, with the species, size and count.
- Haul-away: per load or a flat line, if sod or old plants are being removed.
TerraElm does not publish prices for this work. They vary by region, material and access, and no honest number fits every lot. Put the quotes side by side with the same area and depth, then see compare bids side by side.
DIY or hire
Mulching, edging a straight bed and planting a few shrubs are reasonable weekend jobs. Wait for the 811 marks and avoid digging near flagged lines. Hire out large-scale grading, bed shaping near the foundation and any work around trees with surface roots, where an arborist should look first.
Timing through the year
Mulch is usually spread after planting. University of Maryland Extension notes that fall is the best season for smothering grass with cardboard, with early spring as a second choice. Planting windows depend on your hardiness zone, so ask your county extension office. The spring restart and fall closeout checklists place bed work on the calendar.
Questions homeowners ask
How many cubic yards of mulch do I need?
Multiply bed area in square feet by depth in feet, then divide by 27. For 400 square feet at 3 inches, that is about 3.7 cubic yards. The material order calculator does it for you.
How thick should mulch be?
EPA WaterSense advises three to four inches in beds. University of Maryland Extension advises one to three inches around trees and shrubs. Ask your county extension office.
Can I mulch up against a tree trunk?
No. Both EPA WaterSense and University of Maryland Extension say to leave a gap at the trunk. Mulch piled on the bark can cause problems for the tree.
Do I need weed fabric under mulch?
Not always. New Mexico State University says permeable fabrics generally work better than plastic. Ask your extension office whether fabric suits your soil and plants.
Sources
- EPA WaterSense: Landscaping tips
- University of Maryland Extension: Mulching trees and shrubs
- University of Maryland Extension: Start an in-ground garden by preparing the soil
- New Mexico State University: Landscape Water Conservation, Principles of Xeriscape (H-707)
- Common Ground Alliance: Before You Dig (811)
Checked on November 20, 2026. Mulch depth sources conflict: EPA WaterSense says three to four inches for beds and University of Maryland Extension says one to three inches for trees and shrubs. Local climate, plants and soil decide, so ask your county extension office.
Next on the lot
-
Job
Landscape design and plans
What a plan shows, the 1 in = 10 ft base plan, USDA zones and what to ask a designer.
-
Job
Lawn removal and low-water landscaping
Smothering takes 6 to 8 weeks; utilities may require approval before removal. Methods and quote lines.
-
Lot guide
Utility locates and the 811 color code
How to request 811 marks, the eight APWA colors, and notice rules in three states.