Setbacks and easements
Your lot lines are not the only lines that limit your project
A setback, an easement and a right of way each limit a different thing. Learn which is which before you place a fence, patio, shed or pool.
By TerraElm Editorial Team Updated 8 min read
- Setback
- City or county zoning
- Easement
- Use right held by others
- Right of way
- Public strip by the road
- Example buildable area
- 2,700 of 6,000 sq ft
The short answer
A setback is a zoning rule for how close a building may sit to a lot line. An easement lets someone else use a strip of your land. A right of way is the public strip beside the street. Setbacks come from your city or county. Easements are recorded on the plat or deed. In an example R-5 lot of 60 by 100 feet, setbacks leave 2,700 of 6,000 square feet to build on.
Three limits that are easy to mix up
Los Angeles City Planning describes a setback as the required minimum distance between a building and a property line, there to keep space for light, air and fire safety. An easement is different. A University of Arizona Extension publication says an easement gives a person the right to use another's land for a specific purpose, without giving possession, and that it stays with the property. A right of way is a strip that a government holds for the road and public use. The same publication lists governments among easement holders, for example for rights of way.
| Limit | Who sets or holds it | What it limits | Where to find it |
|---|---|---|---|
| Setback | City or county zoning code | How close a building sits to each lot line | Zoning office and code |
| Easement | A utility, neighbor or government, by recorded document | Building or fencing on the strip | Plat, deed or title report |
| Right of way | A public agency | Anything private on the public strip, such as a fence | Plat and the city or county |
Setbacks vary, so ask the zoning office
Setback distances are set by zone, and each zone sets its own. Bellevue, Washington, lists 20 feet front, 20 feet rear and a 5-foot minimum on one side for its R-5 zone, with the two side setbacks totaling 15 feet. Its Office zone is 30 feet front, 25 feet rear and 20 feet on each side. Another city will use other numbers, so use these as an example, not as your rule.
Setbacks also decide what may enter the strip. Bellevue lets decks and patios below 30 inches above grade extend anywhere into a setback, but one 30 inches or higher can extend only 18 inches or 20 percent of the setback, whichever is greater. Portland, Oregon, takes a different approach: an uncovered deck of 30 inches or less needs no permit, but it may not sit closer than 3 feet to a property line. The numbers differ because each city wrote its own code.
Fences follow their own rules. Los Angeles notes that fence height often depends on the type of yard, and gives a corner-lot example where the side street yard limits a fence to 3.5 feet for the first 15 feet from the building. Portland limits fences in front setbacks to 3.5 feet in many zones. See fence installation.
A worked example, the buildable area
Take an invented lot of 60 feet wide by 100 feet deep that sits in a zone with Bellevue's R-5 numbers. The lot area is 60 x 100 = 6,000 square feet. Subtract the side setbacks from the width and the front and rear setbacks from the depth, then multiply what is left.
| Step | Formula | Result |
|---|---|---|
| Lot area | 60 ft x 100 ft | 6,000 sq ft |
| Buildable width | 60 - 15 | 45 ft |
| Buildable depth | 100 - 20 - 20 | 60 ft |
| Buildable area | 45 ft x 60 ft | 2,700 sq ft |
| Share of lot | 2,700 / 6,000 | 45 percent |
Easements: who can use your strip
The Arizona publication describes two common kinds. A utility easement is a strip where a utility can build and maintain lines, above or below ground, while you keep title. An access easement lets a neighbor reach a road across your land. It says the owner may use the land in ways that do not interfere with the easement, and generally cannot build structures there or fence in a way that blocks access.
Bellevue says easements usually appear on the recorded plat or the title report, and that an access easement may not follow the property line, so a setback can be measured from its inner edge. A survey may show easements as dashed lines; see read your plat and survey. If you want to place anything on a strip, ask the easement holder first. For digging inside one, request marks through 811 first.
Rights of way: the public strip
The right of way along your street is usually wider than the pavement. Bellevue says the edge of the right of way can sit several feet from the curb or pavement, and it measures front setbacks from that inner edge. A Washington county assessor adds that road paint is often not centered in the right of way, so do not measure from a stripe.
Portland and San Francisco both say a fence belongs on private property, not in the public right of way. If you mow or plant that strip, you may be using public land. Ask the city or county public works office what it allows there.
Why the order of the lines matters
Think of the lines as layers on one drawing. The lot line is the outer edge. An easement is a strip that may run along or across it, and the setback is a second line drawn inside it. A project has to clear every layer at once. A patio can be legal under the setback and still sit on a utility strip, and a fence can respect the easement and still stand in the public right of way.
Bring all three layers to the first conversation with a contractor. Hand over the sketch, the recorded easements and the setback figures from the planning office. Then ask each bidder where their layout sits against each line, in feet. A bid that cannot answer that has not measured your lot.
Check this before you place anything
- Pull the plat or survey and mark the lines and easements. See find your property lines.
- Ask the zoning or planning office for the setbacks in your zone, for the specific project, and for any limit on height.
- Ask the easement holder before you put anything in the strip.
- Read your HOA rules. An association may add its own distances: HOA rules and your lot.
- Draw the envelope on the lot sketch before you ask for bids.
Questions homeowners ask
Is a setback the same as an easement?
No. A setback is a zoning rule about how close a building may sit to a line. An easement is a recorded right that lets someone else use a strip of your land.
Can I plant a tree or build a shed in a utility easement?
Ask the easement holder first. A University of Arizona Extension publication says owners generally cannot build structures in an easement. Local rules and the recorded terms decide what else is allowed.
Do setbacks apply to fences and patios?
Sometimes, and the rules differ. Bellevue lets low decks and patios extend into a setback, while Portland keeps uncovered decks 3 feet from a property line. Ask your planning office.
Who owns the grass between the sidewalk and the street?
It may be inside your lot or inside the public right of way. The plat or your public works office can tell you. Do not assume the pavement edge is your line.
Sources
- Los Angeles City Planning: What is the difference between setback and yard?
- City of Bellevue, Washington: Building setbacks
- University of Arizona Cooperative Extension: Easements (AZ1507e, reviewed 2016)
- City of Portland, Oregon: Residential fences, decks and outdoor projects (Brochure 3)
- City of Portland, Permitting and Development: Fence permits and requirements
- San Francisco Planning: Fences
- Snohomish County, Washington, Assessor: Mapping FAQ
Checked on November 20, 2026. Setback distances, what may enter a setback and who maintains the right of way differ by city, county and state. The R-5 figures are Bellevue's and the 60 ft by 100 ft lot is invented. Ask your building or planning office for your zone, your state 811 center for utilities and an attorney about easement rights.
Next on the lot
-
Lot guide
Read your plat and survey
The parts of a plat and a survey, where to get them and what to read first.
-
Lot guide
Utility locates and the 811 color code
How to request 811 marks, the eight APWA colors, and notice rules in three states.
-
Lot guide
HOA rules and your lot
Where HOA rules are recorded, how design review works and why approval differs from a permit.