Plat and survey
Your plat and your survey are two different drawings
What each one is, how to find yours, and the six things to read on them before you pay for fencing, paving, planting or a pool.
By TerraElm Editorial Team Updated 8 min read
- A plat
- Recorded subdivision map
- A survey
- Measured drawing of a lot
- Survey notes
- State its allowed use
- Plat copies
- County clerk, often a fee
The short answer
A plat is a recorded map that legally divides land into lots. A survey measures and draws what is on one lot today. Outdoor work needs both: the plat for the lot lines and recorded easements, the survey for where the house, fence and corners actually sit. Read the title block, boundary lines, monuments, easements, improvements and notes first, and treat an old survey as a starting point, not proof.
Plat, survey and plot plan are not the same
A plat is a recorded map that legally subdivides land. A survey measures and depicts existing conditions and may reproduce parts of the recorded plat for clarity. That is how a surveyor-education article for real estate professionals separates them. In short, the plat says how the land was divided, and the survey says what is on your lot now.
A third name turns up when you buy a house or apply for a permit: the plot plan or site plan. Some are drawn by a licensed surveyor, some are a sketch for a permit. Guides for homeowners say a simple plot plan should not be relied on for permanent work, and a survey by a licensed local surveyor is the safer base for a fence, a wall or a pool.
| Drawing | What it shows | Use it for |
|---|---|---|
| Recorded plat | Lots, blocks, streets, recorded easements and dimensions of the whole subdivision | Finding your lot number, lot lines and platted easements |
| Boundary survey | One parcel's lines, corners and area, often with improvements | Placing a fence, wall or building; settling a line question |
| Title survey | A boundary survey plus recorded easements and visible improvements | Closing on a purchase or refinance |
| Plot or site plan | A simpler sketch of the lot and a planned project | A permit application; not a substitute for a survey |
Where to get yours
If you bought the house, your closing papers probably hold a survey, since a land title survey is required whenever a transaction needs a title policy, according to the Texas Real Estate Research Center. Ask your title company or lender for their copy. Your county clerk keeps recorded plats. One Texas county clerk, for example, lets you search plats online and order certified prints for $10 a copy, and says the online viewer shows only watermarked previews, with the certified print as the legally usable format.
A building or planning department that handles fence permits may also hold a plot plan or survey for your address, and one Connecticut town's building department says so in its fence permit FAQ. If none of these turns up a survey, a licensed land surveyor can make one. More places to look are in finding your property lines.
Six things to read first
- The title block. Usually in a corner. It lists the property address, the surveyor's name and license number, the date and the scale. Check that the address and lot match your deed.
- The legend. It decodes the symbols and abbreviations, such as "IPF" for an iron pin found.
- Boundary lines, bearings and distances. Each side of the lot is labeled with a direction and a length in feet and hundredths. Add up the sides to see how big the lot really is.
- Monuments. The markers at the corners. The survey says whether each was found or set, which tells you how firm the corner is.
- Easements. Usually dashed or dotted lines. They show strips others may use, such as utilities. See setbacks, easements and rights of way.
- Improvements and notes. Houses, driveways, fences and visible utilities with their distances to the lot lines, then the notes that state what the survey assumed and left out.
What a survey does not tell you
Surveys show recorded easements and those that are physically evident, but underground utilities are generally not shown unless the client asked for them to be located. For digging, request the marks through 811 each time: utility locates and the 811 color code.
A survey also does not verify that a planned structure meets setback rules unless it was specifically asked to or certified. The city or county sets those rules, and an HOA may add its own.
Types differ in what they include. The Texas Real Estate Research Center describes a standard boundary survey as one that normally does not locate improvements or easements inside the site unless the client asks for them. If you want to know where a fence or shed sits against a line, ask for that on the order.
Ask the right questions of the drawing
- Does the lot number and street address on the drawing match my deed?
- Were the corner pins found or set, and are they still in the ground?
- Which easements cross the lot, and who holds each one?
- How far is the house, and any fence or shed, from each line?
- What does the surveyor say the drawing may be used for?
Using the survey to plan outdoor work
Fences and walls
Mark the corner monuments on site before the layout. See fence installation.
Patios, decks and pools
Measure from the survey's house and line distances to check clearances before you ask for bids.
Trees and beds
Keep roots, canopies and irrigation out of recorded easements, or ask the easement holder first.
Quotes
Give every bidder the same lot dimensions so the numbers compare. See compare bids side by side.
A survey is a snapshot of one day. Fences, sheds, additions and removed trees change the lot, and the drawing does not update itself. A survey that is years old may not show a later fence, shed or addition. If the lot has changed or a line is in doubt, order a new one. The same Texas research center article says survey matters are standard exceptions in a title policy, which is one reason buyers want an accurate one.
Questions homeowners ask
Is a plat the same as a survey?
No. A plat is a recorded map that divides land into lots. A survey measures one parcel as it exists today and may copy parts of the plat.
Can I use my mortgage survey for a fence?
Often as a starting point, but read its notes first and check that it still matches the lot. A fence on the line is a good reason to order a current boundary survey.
Do I need a surveyor to find my corners?
If the corner pins are found and the survey is current, you may mark them yourself. If a corner is missing or a neighbor disagrees, a licensed surveyor can reset it.
Does a survey show where the gas or water line runs?
Usually not. Underground lines are generally shown only if someone asked for them to be located. Request 811 marks before digging.
Sources
- Texas Real Estate Research Center: Types of land surveys (Category 1A and 1B)
- Caldwell County Clerk, Texas: Plat records
- Town of Granby, Connecticut: Do I need a permit to construct a fence?
- McKissock Learning: How to help clients read a property survey (education provider)
Checked on November 20, 2026. Survey standards and recording practice vary by state and county. The plat fee and online-viewer details are from one Texas county clerk's page and may differ in your county.
Next on the lot
-
Lot guide
Find your property lines
Five places to look, why a county parcel map is not a survey, and when to hire a surveyor.
-
Lot guide
Setbacks, easements and rights of way
Three limits on where you can build or fence, with a worked 2,700 sq ft buildable-area example.
-
Job
Fence installation
Layout, permits, post depth and how a fence quote is built by the linear foot.