Skip to content
TerraElm

Property lines

Find your property lines in the records first, then on the ground

Five places to look, in order, and the point where a map stops being enough and a licensed surveyor has to mark the corners.

By TerraElm Editorial Team Updated 7 min read

Start with
Deed, plat, survey
County parcel maps
Not a survey
Settles a dispute
Licensed land surveyor
Before any digging
Request 811 marks
Illustration: a lot outline with a dashed line along each side, a pink flag at each corner pin and a magnifying glass over the back corner

The short answer

Your lines come from recorded documents: the deed, the plat and any survey. County parcel maps and aerial photos are drawn for tax and planning use, and county offices say so. They are not a survey. Check your closing papers, the county clerk, the building office and the assessor, in that order. If a fence, wall or pool will sit near a line, or a neighbor disagrees, hire a licensed land surveyor.

Five places to look, in order

  1. Your closing papers. A land title survey is required whenever a transaction needs a title policy, per the Texas Real Estate Research Center, so your title company or lender may hold a copy.
  2. The county clerk or recorder. It keeps recorded plats and deeds. One Texas county clerk lets you search plats online and says the certified print is the legally usable format. Your county may differ.
  3. The building or planning office. A Connecticut town's building department says it may hold a plot plan or survey for an address if it handled a past permit. Ask yours.
  4. The assessor's parcel map. Useful for the lot number and a rough shape. It is not the line itself, as the next section explains.
  5. A licensed land surveyor. If the first four turn up nothing current, a surveyor can make the drawing and set the corners.

Plats and surveys use different drawings and different words. Before you read them, see read your plat and survey.

What to ask each office

County clerk or recorder

Ask for the recorded plat and deed for your lot, and for the recording reference on your deed.

Assessor or appraisal district

Ask for the legal description and the lot dimensions on file, and note that they are estimates.

Building or planning office

Ask whether a plot plan, survey or permit file exists for your address, and which lines it uses.

Title company or lender

Ask for the survey from your closing. Read its date and notes before you reuse it.

Why a parcel map is not a survey

Most counties publish a GIS parcel viewer, and it looks precise. Three county offices say plainly that it is not. They draw it for assessment, and each one points you to a surveyor for the true line.

What three county offices say about their parcel maps
CountyWhat the page saysSource
Sacramento County, California, AssessorParcel maps are for assessment only, and parcel lines may not reflect legal descriptionsAssessor's data disclaimer
Douglas County, KansasViewer boundaries are not equivalent to a survey; hire a professional surveyor for the exact lineCounty GIS FAQ
Snohomish County, Washington, AssessorMaps are not surveys; aerial photos and consumer GPS are not accurate enough to show encroachment or cornersAssessor mapping FAQ

The Snohomish County page adds two details worth remembering. The county builds its parcel lines from recorded documents and does not shift them to match a fence. And road paint is often not centered in the public right of way, so measuring from a stripe may not give you the edge. The assessor also says it cannot define or locate a boundary or give legal advice.

What to look for on the ground

A survey notes whether each corner monument was found or set, which tells you how firm the corner is. If you have a recent survey, find the monuments it lists and flag them before any layout. If a corner is missing or your survey is old, do not guess. A guess that a fence crew builds on becomes a permanent line.

  • Do not trust a fence or hedge by itself. It may or may not sit on the recorded line. Only a survey can say.
  • Do not rely on an aerial photo or phone GPS. Snohomish County says neither is accurate enough for boundaries.
  • Measure from corners, not from the road. Pavement, stripes and sidewalks are not the lot line.

When to hire a surveyor

Order a boundary survey when a fence, wall, pool or addition will sit near a line, when you cannot find your corners, or when you and a neighbor do not agree. Snohomish County says accurate boundaries can be determined by a licensed professional land surveyor. A Kansas county names its state society of land surveyors as a place to find one. Ask your county or state licensing board how to confirm a license.

  • Say what the survey is for, so the drawing can be used for a permit or a fence.
  • Ask that the corners be set and marked with stakes or flags, not only drawn on paper.
  • Ask for improvements to be shown, such as the house, fence and shed, with distances to the lines. A standard boundary survey may not locate them unless you ask.
  • Get the scope, the deliverables and the price in writing. Do not assume a past survey covers it.

Using what you find

Put the confirmed lengths into the lot plan calculator, and see lot size vs yard size for the area math. Give every bidder the same lot dimensions. Our fence installation guide shows where the line enters the quote.

Write down what you learn and where it came from: the document, its date and the office that gave it to you. A short log of sources lets a contractor, a permit reviewer or a later buyer see how you reached the line. It also shows you at a glance which numbers are recorded and which are only estimates.

If a neighbor disagrees about the line, talk first and bring the survey. The assessor will not settle it. If talking fails, ask an attorney, since boundary disputes can be legal matters. We cannot advise on that.

Questions homeowners ask

Can I use my county's online parcel map to place a fence?

No. County offices describe those maps as assessment tools, not surveys. Use a recorded survey or order a new one, then confirm the local setback and permit rules.

Where can I get a copy of my plat?

Usually from your county clerk or recorder. Some let you search online, and a certified print is often the format you can legally rely on. Fees and hours vary by county.

Do I need a new survey if I have one from my closing?

Not always. Read its notes and check it still matches the lot. A fence, shed or addition built later will not appear on it. Order a new one if a line is in doubt. See read your plat and survey.

Who decides if my neighbor's fence is on my land?

A licensed surveyor can locate the line. Whether the fence must move is a legal question, so ask an attorney. The assessor's office does not decide boundaries.

Sources

Checked on November 20, 2026. Recording offices, online viewers and surveyor licensing differ by state and county, so the examples above show practice in a few places, not a rule for your address. Ask your county clerk or recorder, assessor, building or planning office, and your state's licensing board for land surveyors.