Lot size
Your lot is not your yard, and bids need the second number
How to turn the lot area on your records into the yard and lawn area that fencing, sod, mulch and irrigation are actually measured on.
By TerraElm Editorial Team Updated 7 min read
- Lot area
- Length x width, sq ft
- Yard area
- Lot minus built areas
- One acre
- 43,560 sq ft
- Example lot
- 6,600 yard of 8,400 lot
The short answer
Lot size is the area inside your property lines. Yard size is the open ground left after the house, driveway and walks come out. For a lot of 70 by 120 feet, that is 8,400 square feet of lot and 6,600 square feet of yard once 1,800 square feet of buildings and paving are removed. Ask every bidder which of the two numbers their price uses.
Lot size is the whole parcel
Lot size is the area enclosed by your property lines. For a rectangle you multiply length by width, which is the method a Nebraska Extension pesticide-education handout uses for sizing an area, and the answer comes out in square feet. Land is also sold in acres, and the same handout gives 43,560 square feet per acre. Divide your square feet by that number to get acres.
Where does the lot number come from? Start with your deed, plat or survey, which are covered in read your plat and survey. Your county assessor's map is a second source, but a Washington county assessor says its parcel maps are not surveys and offers only estimated dimensions based on the legal description. Treat a map figure as an estimate and a recorded dimension as the number to use.
Yard size is what is left
Los Angeles City Planning describes a yard as the open area inside the property lines that remains once buildings and other structures are accounted for. In everyday terms, the yard is lot area minus the footprint of the house, the driveway, the walks and anything else paved or built. Use the ground the house covers, not the floor area printed in a sale listing.
Do not mix this up with a setback. The same city page says a setback is the required minimum distance between a building and a property line, and that a yard usually includes the setback areas. Setbacks limit where you may build. They do not shrink the area you can mow or plant. See setbacks, easements and rights of way.
A worked example, step by step
This is an invented lot used only to show the arithmetic. Swap in your own measurements, or enter them in the lot plan calculator. Every line is length times width, and the last lines subtract.
| Step | Formula | Result |
|---|---|---|
| Lot area | 70 ft x 120 ft | 8,400 sq ft |
| House footprint | 40 ft x 30 ft | 1,200 sq ft |
| Driveway | 12 ft x 40 ft | 480 sq ft |
| Front walk | 4 ft x 30 ft | 120 sq ft |
| Buildings and paving | 1,200 + 480 + 120 | 1,800 sq ft |
| Yard area | 8,400 - 1,800 | 6,600 sq ft |
The yard is 6,600 / 8,400 = 0.7857, or 78.6 percent of the lot. The lot is 8,400 / 43,560 = 0.193 acre. Now take it one step further. Say planting beds cover 450 square feet (15 ft x 30 ft) and a patio covers 280 square feet (14 ft x 20 ft). Then the lawn is 6,600 - 450 - 280 = 5,870 square feet. That is 2,530 square feet less than the lot.
Which number each job uses
Fences
Use the length of the run, taken from your lines, not area. See fence installation.
Sod, seed and mulch
Use the area of lawn or bed being covered. Add the pieces and subtract what the work does not touch.
Irrigation and fertilizer
Use the area being treated, which is the lawn and beds, not the whole lot.
Quotes
Ask the bidder to write the area the price covers, in square feet, so every bid uses the same base.
The takeoff tools turn the same measurements into materials: see the material order calculator.
Measure your own lot in five steps
- Get the lot area from a record. Use the deed, plat or survey. If you only have an assessor estimate, write down that it is an estimate.
- Sketch the lot. Draw the outline on paper and label each side with its recorded length.
- Measure each hard surface. Use a tape or measuring wheel on the house, driveway, walks, patio, shed and pool. Record length and width.
- Multiply, add and subtract. Compute each area, add the hard surfaces, then subtract the total from the lot area.
- Subtract beds, pools and trees if you need lawn. Measure planting beds and any area the job will not touch, and take those out too.
Keep the sketch. When a bidder asks for your lot size, hand over the lot, yard and lawn figures with their formulas. Three bidders using the same three numbers produce quotes you can compare. For the next step in budgeting, see the job budget calculator.
Pitfalls when you measure
- Irregular lots. Split the shape into rectangles and triangles, compute each (a triangle is half the base times the height), then add them.
- Strips you mow but may not own. Bellevue, Washington, notes that the edge of a street right of way can sit several feet from the curb or pavement. Part of the strip beside the road may lie outside your lot.
- Easements. Easement strips are inside your lot area, but you may not be free to build or plant there.
- Old numbers. A recorded area does not change when you add a shed or patio. Re-measure the extras.
Questions homeowners ask
Is my lot size the same as my yard size?
No. Lot size is the whole parcel inside the property lines. Yard size is the open area left after the house, driveway, walks and other structures are removed.
How many square feet are in an acre?
There are 43,560 square feet in an acre, according to a Nebraska Extension pesticide-education handout. Divide your lot's square feet by 43,560 to get acres.
Where do I find my lot size?
Your deed, plat or survey has the recorded dimensions. A county assessor map can give an estimate, but one county assessor says its maps are not surveys. See finding your property lines.
Should a lawn quote use lot size or lawn size?
Ask the bidder to state the area the price covers. In the example, lot area was 8,400 square feet and lawn area was 5,870. Compare bids only when they use the same number: compare bids side by side.
Sources
- Nebraska Extension, Pesticide Education: Why know the size of the area to be treated (area and acres)
- Los Angeles City Planning: What is the difference between setback and yard?
- Snohomish County, Washington, Assessor: Mapping FAQ
- City of Bellevue, Washington: Building setbacks
Checked on November 20, 2026. The 70 ft by 120 ft lot and its measurements are invented for the arithmetic. Yard and setback definitions vary by city and county, so ask your planning office how yours defines them.
Next on the lot
-
Lot guide
Read your plat and survey
The parts of a plat and a survey, where to get them and what to read first.
-
Lot guide
Find your property lines
Five places to look, why a county parcel map is not a survey, and when to hire a surveyor.
-
Lot guide
Setbacks, easements and rights of way
Three limits on where you can build or fence, with a worked 2,700 sq ft buildable-area example.