Job budget with a state price level

List each job with a quantity and a unit price you actually have. TerraElm supplies no prices: the tool adds, adjusts and pads them.

Used only to find your state.

Your choice. Hidden conditions and changes add cost.

—

Jobs, quantities and unit prices
Job and unit Quantity Unit price Where the price comes from Line total
—
—
—
—
—
—

The first rows hold example quantities only; enter the unit prices from your quotes. A quote for your area is used as is. A national figure is scaled to your state's price level.

Subtotal
—
Contingency
—
Budget
—

How it works

Each line is a quantity times a unit price. If the price is a quote for your area, it is used as it stands. If it is a national figure, such as an average from a guide, it is multiplied by your state's price level divided by 100. The lines are added, then the contingency percentage is added to the subtotal.

The state price level is the Bureau of Economic Analysis's Regional Price Parity for all items, 2024 data, released February 19, 2026 (the U.S. is 100). It measures what households pay for everything, rent included, not what a fence or a mowing visit costs. Use it as a rough signal for moving a national figure to a state, and prefer local quotes whenever you have them. BEA's next release is scheduled for December 10, 2026; the figures here will be updated then. Your ZIP code is matched to a state by its first three digits, which can misplace a few ZIP codes near a state line.

Worked example

In Texas the level is 97.1. A local quote of 200 units at $30 is $6,000.00. A national figure of $10 a unit for 100 units is $1,000.00 at the national level and $971.00 at the Texas level. The subtotal is $6,971.00; 10% contingency adds $697.10, so the budget is $7,668.10.

Where to get unit prices: written bids. Read how outdoor quotes are built and quote units, take the quantities from the lot plan, and see budget the whole lot.