Skip to content
TerraElm

Units

The unit on the quote tells you what you can check

Per foot, per square foot, per visit, per tree, per season and per hour: what each one means, and the arithmetic that turns it into a total.

By TerraElm Editorial Team Updated 7 min read

Fences and edging
Per linear foot
Paving and sod
Per square foot
Mowing
Per visit or season
Trees
Per tree or per job
Illustration: a lot plan with a measuring tape along a fence line, a shaded patio rectangle and a tree marked with a pink flag

The short answer

Every quote rests on a unit, and each unit has a different thing to check. A foot or square foot you can measure yourself. A visit or a season depends on how many visits happen. A tree price depends on the tree, its access and what is left behind. In the illustration below, a $55 mowing visit becomes $1,540 over 28 weekly visits, and $1,320 if 4 visits are skipped in a dry spell.

Why the unit comes before the price

A price means little until you know what it is a price of. Fifty dollars per foot and fifty dollars per visit are not the same kind of number. The unit tells you what to measure, what to count and what a bidder could leave out. Ask for the unit and the quantity in writing, and check the quantity yourself where you can.

Common units, the jobs that use them and what to check
UnitJobs that often use itWhat to check
Linear footFences, edging, retaining wall face, drain linesLength of the run you measured, gates counted apart
Square footSod, pavers, concrete, seeding, mulch bedsLength x width, minus anything not being worked
VisitMowing, pool service, yard cleanupsWhat one visit includes and how many happen
TreeTrimming, removal, stump grindingSize, access, cleanup and whether the stump is in
Season or monthMowing plans, lawn treatment programs, pest programsNumber of visits and what a skipped visit does
Hour or dayCleanups, small repairs, equipment timeA cap on hours and who sets the pace
Lump sumDesign work, whole projectsAn itemized list behind the one number

A visit price becomes a season cost

Mowing is quoted per visit, but you pay for a season. Here is the arithmetic. The figures are an illustration, not market prices. A bidder quotes $55 per visit for weekly mowing, trimming and blowing off the hard surfaces, for a season of 28 weekly visits.

  • Weekly, all weeks: 28 visits x $55 = $1,540.
  • Every other week: 14 visits x $55 = $770, with two weeks of growth between cuts.
  • Weekly, with 4 weeks skipped in a dry spell: 24 visits x $55 = $1,320.
  • Flat season plan at $1,540: you pay $1,540 whether 28 visits happen or 24 do, unless the contract says otherwise.

The last two lines are the point. A per-visit price follows the weather, and a flat plan does not. Neither is wrong, but you should know which one you are signing. Ask three things. What is in a visit? Do skipped visits come off the bill? What happens when a visit is missed by the crew? Put your own numbers in the job budget tool to see the season total.

One more check on any visit price: the lot itself. A visit price assumes a certain area and certain obstacles. If a bidder priced without walking the lot, ask which area was used, the whole lot or only the grass. The answer changes the visit price, and it is easy to settle with one phone call or a sketch. Your mowable area is the lot minus the house, drive, walks and beds, and what drives the price on your lot shows that subtraction. Tell every bidder the same area so the visit prices compare.

Square feet: do the area yourself

For paving, sod and mulch, you can check the quantity before anyone comes out. Say a patio is L-shaped. One part is 20 feet by 12 feet, which is 240 square feet. The other is 8 feet by 10 feet, which is 80 square feet. The total is 240 + 80 = 320 square feet. If a bid says 300, ask why. If it says 360, ask what the extra 40 square feet is for, such as a border or a path.

Also ask whether the quantity includes waste. Some bidders add an overage to the material and some price the waste inside the unit rate. The two can look different on paper and cost the same. The material order tool shows how much extra a material order may need.

Per foot, and where it gets tricky

Fences and edging are priced by the linear foot, so the length is the thing to confirm. Measure along the line, around corners, and apart from gates, because a gate is usually its own line. A fence and deck takeoff turns that length into posts and rails. Slope, rock and tight access can change the rate for the same length, which is why one run can carry two different per-foot prices on the same quote.

Per tree and per job

Trees do not repeat. Two oaks of similar height can differ in access, lean and what is under them, so tree work is usually priced per tree or per job. A land-grant extension guide for homeowners says the contract should give a clear statement of the work, what cleanup will be done and when, and the total dollar amount. It also says to clarify whether a removal includes grinding the stump and surface roots.

Five questions for every unit

  • What is the unit, and what is the quantity in that unit?
  • What is in one unit, and what is left out?
  • Does the rate change with slope, access, rock or roots?
  • If the quantity turns out different, how is the difference settled?
  • How does this unit convert to a total for the whole job?

Once every bid is in the same unit and has the same scope, you can set them next to each other. That is the next step: compare bids side by side. For where a quote begins, see how outdoor quotes are built.

Questions homeowners ask

Which unit is fairest for a lawn plan?

None is fairer on its own. Per visit follows the weather, and a flat season plan makes the cost predictable. Pick the one whose visit count and skipped-visit rule you understand.

Is hourly pricing a red flag?

Not by itself. Hourly can fit small jobs with unknowns. Ask for a cap on hours or a not-to-exceed number, and for how travel and cleanup time are counted.

Why does a bidder measure my fence run again?

Because the quantity drives the total. Measure your own run first and compare. The takeoff tool helps with the count of parts.

Do I need a per-tree price if I have several trees?

Yes, ask for each tree on its own line with its own scope. That lets you drop or delay one tree without re-bidding the rest.

Sources

Checked on November 20, 2026. The mowing and patio figures are arithmetic illustrations, not market prices. Which unit a trade uses, and what the law says about it, varies by city, county and state. Your state licensing board can tell you what a contract must state.