Skip to content
TerraElm

Material order: mulch, sod, pavers, concrete

Choose what you are ordering, enter the area and the details, and set the waste allowance. You get a quantity to put on the order.

Your choice. Cuts, spills and uneven ground use up material.

Order
—
Also
—

How it works

Bulk material in cubic yards is area times depth, converted to cubic feet (depth in inches divided by 12) and then to cubic yards (divide by 27), plus your waste allowance. Sod is the area plus waste, then divided by the square feet on one pallet and rounded up. Seed is the area in thousands of square feet times the label rate. Pavers are the area divided by one paver's area, plus waste, rounded up. A slab is length times width times thickness in feet, divided by 27, plus waste.

Worked examples

Mulch 400 square feet at 3 inches with 10% extra is 4.07 cubic yards. 1,000 square feet of sod with 5% extra is 1050 square feet, or 3 pallets at 450 square feet each. A 12 by 10 foot slab 4 inches thick with 10% extra is 1.63 cubic yards.

The allowances are planning habits, not rules. For a concrete pour or a paver base, ask the supplier and the installer for their numbers. Order from your measured yard area, and see patio and paver installation and garden beds, mulch and edging.