Patios
A paver patio is mostly what you cannot see
The soil, base, sand and edge that decide whether pavers stay flat, the slope that keeps water off the house, and what to ask before you sign.
By TerraElm Editorial Team Updated 8 min read
- Base depth
- 3 to 6 in, sources differ
- Bedding sand
- About 1 in, screeded
- Slope from the house
- 1 in per 4 ft
- Priced by
- Square foot
The short answer
A paver patio is layers: compacted soil, a compacted gravel base, about 1 inch of bedding sand, the pavers, an edge restraint and joint sand. Two extension sources give different base depths, 3 inches and 4 to 6 inches, and both slope the surface 1 inch per 4 feet away from the house. Permit rules for patios on the ground vary by city, so ask your building or planning office before you hire.
What a patio job includes
A crew marks the shape, removes sod and soil to a set depth, compacts the soil, spreads and compacts the base, screeds a thin sand bed, lays the pavers, cuts the edges and sweeps in joint sand. Hauling away the spoil, drainage pipe, steps, walls, lighting and sealer are often separate lines. The first question is which of those are in the price.
- Excavation. Depth equals the base, plus the sand bed, plus the paver thickness.
- Base. Crushed stone, spread and compacted in layers.
- Pavers and edge. The surface and the border that holds it in.
- Joints. Sand swept into the gaps, which locks the pavers together.
Check the rules and the ground first
A patio on the ground often needs less approval than a deck or a roofed structure, but not everywhere. The examples below show how much the answers differ.
| Place | What the page says | Source |
|---|---|---|
| Seattle, Washington | Patios and concrete slabs on grade usually do not need a permit, and the exemption does not apply in environmentally critical areas. | Seattle SDCI, do you need a permit |
| Portland, Oregon | A patio on grade on private property needs you to contact Planning and Zoning to see whether a zoning permit applies. | Portland Permitting and Development, outside work permits |
| Denver, Colorado | Covered patios need both zoning and building permits. The page does not say whether an uncovered ground-level patio needs one. A drainage permit may apply within two feet of a sewer line or in a floodplain. | Denver Community Planning and Development |
Check your setbacks, easements and any HOA rules too: setbacks, easements and rights of way and HOA rules and your lot. Then request the underground marks. The Common Ground Alliance says to contact 811 a few business days before digging and to wait until every utility has responded; see utility locates and the 811 color code.
The layers under the pavers
Extension publications describe the same stack, with different numbers. Both are general guidance, so treat them as examples and check what your paver maker and local installers specify for your soil and climate.
| Layer | LSU AgCenter (2022) | Oregon State Extension (undated) |
|---|---|---|
| Base | About 3 inches of gravel such as crushed limestone with fines; soil roughly 6 inches below the finished surface | 4 to 6 inches of crushed rock, thicker for soft clay or driven-on areas; spread and compact in three layers |
| Compaction | Vibratory plate compactor; lightly moisten the fines | Plate compactor, several passes; slightly moist gravel compacts more easily |
| Bedding sand | 1 inch of washed, coarse sand, screeded between two 1 inch pipes | 1 inch, screeded with 1 inch pipe guides and a 2 by 4 |
| Edge restraint | Plastic edging around the perimeter | Plastic, pre-cast concrete, metal or wood |
| Joint sand | Polymer sand swept in, then lightly sprayed with water | Fine paver sand swept in when dry |
The two sources disagree on base depth, 3 inches against 4 to 6. That gap is a good question for a bidder: what base depth do you use on my soil, and why? Soft clay, poor drainage and any driven-on use are the cases where Oregon State asks for more.
Slope: send water away from the house
Both extension sources slope the surface down and away from the building by 1 inch for every 4 feet. LSU puts that at about 2 percent. Here is the arithmetic on a 12 by 15 foot patio that drains along its 15 foot side. Rise over run: 15 feet divided by 4 is 3.75 inches of drop across the patio.
The same patio is 180 square feet. If the pavers are 2.5 inches thick (check the product sheet), the dig depth with a 4 inch base and a 1 inch sand bed is 4 + 1 + 2.5 = 7.5 inches. The compacted base alone is 180 square feet times 4/12 foot, or 60 cubic feet, about 2.2 cubic yards. Sand is 180 times 1/12, or 15 cubic feet. Loose stone compacts, so the supplier will tell you how much to order. The material order tool does the volume math.
Pavers compared with other surfaces
The Concrete Masonry and Hardscapes Association, a trade association, says in a December 2025 article that pavers can be lifted and reset for repairs, and that sand in the joints needs sweeping and weeds need pulling. It adds that sealer on pavers or concrete needs renewing every few years. That is a trade association making its case, so ask installers for local proof instead of taking it as a ranking. Poured concrete has its own jobs and its own joints: see concrete patios and walkways.
How a patio quote is built
Most patio quotes start with a price per square foot of finished surface and then add lines. Measure the shape yourself. The lot plan tool helps you sketch it to scale.
Area and shape
Square feet, curves and cuts. Curves and many cuts mean more labor and waste.
Excavation and base
Depth, base material and thickness, and who hauls away the soil.
Pavers and edge
Product name, thickness, pattern and edge restraint type.
Drainage and extras
Slope, pipe, steps, walls, lighting and sealer, each as its own line.
Permit
Who checks with the city and who pays any fee.
Line up bids using compare bids side by side. If one quote lacks a base depth or an edge, it is not a cheaper patio.
Questions to ask each bidder
- What base depth and material will you use on my soil, and how many layers do you compact?
- How deep is the dig, and who hauls away the soil and sod?
- Which edge restraint will you use, and where does it sit?
- How much slope does the plan give, and in which direction does water leave the patio?
- Do you follow the paver maker's installation instructions, and can I see them?
- Who calls 811, and who checks the permit question with the city?
Write the answers into the contract. A bid that cannot answer the first two questions has not yet looked at your yard.
DIY, hire and timing
A small patio is within reach of a careful DIYer, but the work is heavy and the base is where mistakes hide. Renting a plate compactor and moving tons of stone is real labor. Hiring moves that to a crew, so check license and insurance requirements first: contractor licenses and insurance. Ask when the ground is workable where you live.
Questions homeowners ask
How thick should the gravel base under pavers be?
Sources differ. LSU AgCenter describes about 3 inches of gravel, and Oregon State Extension describes 4 to 6 inches, thicker for soft clay or driven-on areas. Ask the installer what they use on your soil.
What slope should a patio have?
Both extension sources slope the surface away from the house by 1 inch for every 4 feet. LSU states this as at least 2 percent.
Do I need a permit for a patio on the ground?
It depends on the city. Seattle usually does not require one for a patio on grade, Portland sends you to Planning and Zoning, and Denver requires both permits for a covered patio. See permits for outdoor projects.
What is the sand between pavers for?
Sand swept into the joints fills the gaps between pavers. The extension sources describe sweeping in polymer sand or fine paver sand after the pavers are laid.
Sources
- LSU AgCenter (Abdi and Fields, November 3, 2022): Best practices for paver installation
- Oregon State University Extension Service: paver installation guidance (undated page)
- Concrete Masonry and Hardscapes Association: Pavers vs. concrete: myths, facts, and what homeowners need to know (December 1, 2025; trade association)
- Seattle Department of Construction and Inspections: Do you need a permit?
- City of Portland, Permitting and Development: Outside work permits
- City and County of Denver: Residential decks, porches, patios, pergolas and carports
- Common Ground Alliance: Before You Dig (811)
Checked on November 20, 2026. The two extension sources describe residential practice and disagree on base depth; paver makers and local installers set the specification for your soil and climate. The Interlocking Concrete Pavement Institute's own installation standards were not opened for this page. Patio permit rules vary by city, county and state; the examples are three cities, not a rule for your address. This page lists no prices because they depend on area, base depth, product and region.
Next on the lot
-
Lot guide
Drainage and grading basics
Read grade, size roof runoff (748 gallons per inch on 1,200 sq ft) and move water without harming a neighbor.
-
Job
Concrete patios and walkways
Joints at 24 to 36 times thickness, 3 to 7 days of curing, and why slabs still crack.
-
Quote guide
Compare bids side by side
A fence bid $700 lower by the foot ends up $640 higher once removal, gate and permit are added.