Concrete
Concrete will crack, so the joints choose where
How a poured patio or walkway is built, where the joints go, how curing and weather affect it, and what to ask before the truck arrives.
By TerraElm Editorial Team Updated 9 min read
- Joint depth
- One-quarter of the slab
- Joint spacing
- 24 to 36 x thickness
- Curing, typical
- 3 to 7 days
- Priced by
- Square foot
The short answer
Concrete shrinks as it dries, and a slab cracks somewhere unless a joint tells it where. The National Ready Mixed Concrete Association's guidance cuts contraction joints at least one-quarter of the slab thickness deep, spaced 24 to 36 times the thickness, and keeps the concrete damp or covered for 3 to 7 days. The same sources say all concrete tends to crack. Many cities exempt flatwork from a building permit, but zoning and right-of-way rules still apply.
What a concrete job includes
A crew sets forms, prepares and compacts the subgrade, places the concrete, strikes it level, finishes the surface, cuts or tools joints, and cures the slab. Demolition and hauling of an old slab, a gravel base, steel or fiber reinforcement, color, stamping and sealer are often separate lines. Ask which are in the price.
- Forms and subgrade. The shape and the ground under it. Weak subgrade preparation is one cause of cracking, according to the NRMCA.
- Placing and finishing. Timing matters. Too much water in the mix or poor finishing also shows up as cracks and scaling.
- Joints. Control joints in the field, isolation joints where the slab meets something fixed.
- Curing. Keeping the concrete damp or covered while it gains strength.
Where the joints go
The National Ready Mixed Concrete Association (NRMCA) says contraction joints should be cut or tooled to about one-quarter to one-third of the slab thickness, and never less than 1 inch. It sets spacing at 24 to 36 times the slab thickness, with a recommended maximum of 15 feet. For a 4 inch slab, that spacing works out to about 10 feet. Saw cuts are made 4 to 12 hours after finishing, once the surface is firm enough not to be torn. Panels should be nearly square, no longer than 1.5 times their width. The American Concrete Institute's slab guide gives the same 1.5 to 1 limit and asks for continuous joints that do not stagger.
Isolation joints are different. They separate the slab from a wall, a step, a post or a footing, so each can move on its own. The NRMCA names premolded filler such as asphalt-impregnated fiber sheeting or compressible foam. Ask where the contractor plans to put them against your house.
| Step | Math | Result |
|---|---|---|
| Thickness test | 24 x 4 in to 36 x 4 in | 8 to 12 feet between joints |
| Shape test | Width 4 ft x 1.5 | Panels no longer than 6 feet |
| Panels | 40 ft / 7 panels | 5.7 ft each, so 6 joints |
| Volume | 4 ft x 40 ft x (4/12) ft = 53.3 cu ft | About 2 cubic yards |
The narrow walk fails the shape test before the thickness test, so the joints sit closer than 8 feet. The material order tool converts the volume. Ask the supplier how much extra to order, since the sources opened for this page give no waste figure.
Curing, weather and the surface finish
Curing keeps moisture and temperature favorable so the concrete reaches its designed strength. The NRMCA says concrete that dries out early can lose as much as 50 percent of its potential strength compared with moist-cured concrete. It says curing should start right after finishing and typically lasts 3 to 7 days, and that a specification calling for longer wins. Methods include continuous sprinkling, wet burlap, plastic sheet at least 4 mils thick, and curing compounds. The NRMCA also says alternating wet and dry is not an acceptable practice.
Temperature rules matter in a patio season. The NRMCA says to keep placed concrete above 50 degrees F, and to protect it from freezing until it reaches at least 500 psi. In its decorative-finishing publication, the Portland Cement Association (PCA) warns that hot, dry or windy days can set the surface early and says to cover the slab quickly. For slabs that freeze, the PCA calls for air-entrained concrete with 5 to 8 percent total air and a water-cement ratio of no more than 0.45 where deicing salts are used. It also says repeated troweling damages the air near the surface, and that smooth troweled surfaces should be avoided outdoors. A broom finish is the common alternative; ask what finish the bid includes.
Permits, right of way and the line
Flatwork often needs no building permit, but the details change by place.
| Place | What the page says | Source |
|---|---|---|
| Austin, Texas | Sidewalks, driveways and concrete flatwork are exempt from a building permit if they are not in the public right of way. The page sets no size limit. A floodplain can still require a permit. | City of Austin, work exempt from building permits |
| Seattle, Washington | Patios and concrete slabs on grade usually do not need a permit, except in environmentally critical areas. | Seattle SDCI, do you need a permit |
| Portland, Oregon | A patio on grade needs a check with Planning and Zoning for a zoning permit. Paving a driveway, even with an existing curb cut, requires a zoning permit. | Portland Permitting and Development, outside work permits |
The right-of-way line matters most for a walk to the street, because the strip near the curb may belong to the city. Confirm yours in setbacks, easements and rights of way, then read permits for outdoor projects. Request the underground marks before any digging: the Common Ground Alliance says to contact 811 a few business days ahead, and you can read more in utility locates and the 811 color code.
How a concrete quote is built
Concrete bids usually start with a price per square foot at a stated thickness, then add lines. A 12 by 12 foot patio at 4 inches is 144 square feet and 12 x 12 x (4/12) = 48 cubic feet, or about 1.8 cubic yards. Measure your own shape before you call anyone.
Area and thickness
Square feet and inches thick. A thicker slab uses more concrete per foot.
Base and forms
Gravel base depth, forms and any reinforcement, each stated on the quote.
Joints and finish
Joint layout, saw cut or tooled, broom or other finish, and isolation joints at the house.
Curing and weather
Curing method, and what the crew does in cold or hot weather.
Removal, permit and cracks
Old slab removal, who handles permits and what the contract says about cracking.
Compare bids that use the same thickness and the same joint plan, as in compare bids side by side. For pavers as the alternative, see patio and paver installation.
DIY, hire and timing
Concrete does not wait. Once the truck arrives, the crew has a limited window to place, strike off, finish and cut joints. A small walk is possible for an experienced DIYer with help, but a patio is a job for people who have done it. Plan the pour for a stretch of weather that fits the temperature limits above, and schedule joint cutting and curing before the day starts.
Questions homeowners ask
How deep should control joints be?
The NRMCA says at least one-quarter of the slab thickness and never less than 1 inch, so at least 1 inch in a 4 inch slab.
How far apart should joints be?
The NRMCA gives 24 to 36 times the slab thickness, up to a recommended maximum of 15 feet, and nearly square panels. That is about 10 feet for a 4 inch slab.
How long should new concrete be cured?
The NRMCA says curing should typically continue for 3 to 7 days, longer if the specification calls for it. Keep it above 50 degrees F and protect it from freezing.
Do I need a permit for a concrete patio or walk?
It depends on the city. Austin exempts flatwork outside the public right of way, Seattle usually does not require a permit for a slab on grade, and Portland asks you to check zoning. See permits for outdoor projects.
Sources
- National Ready Mixed Concrete Association: CIP 6, Joints in concrete slabs on grade
- National Ready Mixed Concrete Association: CIP 11, Curing in-place concrete
- National Ready Mixed Concrete Association: CIP 4, Cracking concrete surfaces
- Portland Cement Association: Finishing concrete with color and texture (PA124)
- American Concrete Institute: Guide to concrete floor and slab construction, 302.1R-15 (chapter 5)
- City of Austin: Work exempt from building permits
- Seattle Department of Construction and Inspections: Do you need a permit?
- City of Portland, Permitting and Development: Outside work permits
- Common Ground Alliance: Before You Dig (811)
Checked on November 20, 2026. The joint, curing and cracking figures come from industry and standards-body guidance for slabs on grade; your contractor and local code set the specification for your slab and climate. Permit rules, frost exposure and right-of-way lines vary by city, county and state. The PCA publication is about decorative finishing, and its air-content figure applies to concrete exposed to freezing and deicing salts. This page lists no prices because they depend on thickness, base, finish, access and region.
Next on the lot
-
Job
Patio and paver installation
Base depth, 1 inch of sand, 1 inch per 4 ft of slope and permits, with a worked 180 sq ft patio.
-
Lot guide
Permits for outdoor projects
Houston, Portland and San Francisco set different thresholds for fences, decks and sheds.
-
Quote guide
Contracts, deposits and payment schedules
Deposit caps differ: 10% or $1,000 in CA, one third in MD and MA. Pay in steps and know your cancel right.