Contracts
A contract is the quote with the promises written down
What belongs in a contract for yard, fence or tree work, how deposit limits differ by state, and how to pay in steps that follow the work.
By TerraElm Editorial Team Updated 8 min read
- Deposit cap
- Set by each state
- Pay in steps
- Tie to finished work
- Federal cancel right
- 3 business days
- Contract wording
- Every promise in writing
The short answer
A written contract turns a quote into promises you can point to: the work, the materials, the dates, the price and the payment steps. Some states cap the deposit. California's CSLB says 10 percent or $1,000, whichever is less, while Maryland and Massachusetts say one third of the price. The FTC says some states cap deposits, so ask yours. The FTC's Cooling-Off Rule gives a three business day right to cancel for many sales made away from the seller's place of business. This is general information, not legal advice.
What a written contract should hold
The quote tells you the price. The contract tells you what happens if the job goes wrong. Before you sign, make sure the paper matches the bid you compared in compare bids side by side, including the unit the price is built on, such as feet, visits or trees. Then read it for the items below.
- Who. The contractor's name, address and license or registration number where your state requires one. Maryland's Home Improvement Commission lists these on its contract page.
- What. A detailed description of the work and the materials. Massachusetts requires this, and says the contractor must do the work as described.
- When. Start and completion dates. Massachusetts and Maryland both name them as required terms.
- How much and when you pay. The total price and a payment schedule, covered below.
- Promises. Anything said out loud. The FTC says to make sure every promise is in writing and not to sign with blank spaces.
- Warranty and cancellation notice. Massachusetts says any express warranty must be attached to the contract. See change orders, warranties and lien waivers.
California's Contractors State License Board says a written contract is needed for home improvement projects over $500. Rules on what counts as home improvement differ. Maryland's commission says the term includes improvements to land next to the home, such as patios and retaining walls. Ask your state board whether your job falls under its contract rules.
Deposits: some states cap them, some do not
A deposit pays for the contractor's start-up costs. Some states limit it. The FTC notes that some states cap how much a contractor can require as a down payment, and that your state consumer protection agency can tell you the rule where you live. Three official examples show how far the rules can differ.
| State | What the official page says | Source |
|---|---|---|
| California | Down payment of 10 percent of the price or $1,000, whichever is less. A contractor with a blanket performance and payment bond on file is an exception. | CSLB, Contracts and Binding Agreements |
| Maryland | A contractor cannot accept more than one third of the contract price as a deposit, and no payment until the contract is signed. | MHIC, Maryland Home Improvement Contracts |
| Massachusetts | An advance deposit cannot exceed one third of the total price, except for the cost of special-order materials. | Mass.gov, Home Improvement Contract Requirements |
Here is the arithmetic on a made-up price, not a typical cost. On a $6,000 job, 10 percent is $600, which is under $1,000, so the California cap is $600. One third is $2,000. On a $15,000 job, 10 percent is $1,500, so the $1,000 limit applies, while one third is $5,000. If your contract asks for more than your state's cap, ask the state licensing board or attorney general's office before you pay.
Payments that follow the work
A deposit cap is a ceiling, not a target. A good schedule pays for finished stages. The CSLB guide says a home improvement contract must include a payment schedule and that payments cannot exceed the value of the work performed. Massachusetts requires a payment schedule too, and says a contractor cannot demand final payment until the work is done to the satisfaction of all parties. Maryland's page says the state's law does not control the schedule beyond the deposit, so the terms are yours to negotiate.
Oregon's Construction Contractors Board advises paying only the minimum deposit and agreeing on a schedule tied to completed work. For a fence, stages might be layout and posts set, rails and boards hung, gates hung and final walk-through. For a tree job, the stage may be the work itself. Hold the last payment until you have walked the lot and the cleanup is done.
Your right to cancel
The FTC's Cooling-Off Rule covers door-to-door sales, which the rule defines as sales where the seller personally solicits and you agree somewhere other than the seller's place of business. That includes your home. Its coverage starts at $25 for a sale at your residence and $130 elsewhere, according to the FTC's 2015 announcement. You have until midnight of the third business day after the sale to cancel. The seller has to give you a receipt or contract and a cancellation notice form, and must refund you within 10 business days after a valid notice.
The rule has exclusions. One covers a visit that you asked for to repair or maintain your personal property. Anything else sold to you during that visit is not excluded. Another covers real property. Whether a yard job fits an exclusion is a legal question for your attorney general's office or an attorney.
States add their own rules. Maryland's page says its Door-to-Door Sales Act gives until midnight of the fifth business day to cancel, or the seventh day if you are 65 or older. Massachusetts requires a three-day cancellation notice when you sign away from the contractor's office. The state rule that gives you the longer or fuller protection is the one to read. For offers that arrive at your door, see unsolicited offers and yard work scams.
Before you sign
- Match the paper to the bid. Same scope, units, materials and extras you compared.
- Check the license. Use your state board's lookup; see contractor licenses and insurance.
- Read the payment schedule. Compare the deposit with your state's limit, if it has one.
- Set the dates. Start, finish and what happens if weather or access delays the job.
- Settle permits and 811. Name who applies for the permit and who requests the utility marks.
- Fill every blank. Never sign with empty lines, and keep a signed copy before work begins.
Put the total in your plan too. The job budget tool adds the contract, permit fees and the extras you may add later.
Questions homeowners ask
How much deposit can an outdoor contractor ask for?
It depends on your state. California's CSLB says 10 percent of the price or $1,000, whichever is less. Maryland and Massachusetts say one third. The FTC says some states set a cap, so ask your state licensing board or attorney general.
Do I need a written contract for yard work?
Some states require one for home improvement work above a set amount, and CSLB cites $500 in California. Even where none is required, the FTC says to get one. Read how outdoor quotes are built first.
Can I cancel a contract I signed at home?
Often, for a short period. The FTC rule gives three business days for covered sales made away from the seller's business, and some states give longer. Exclusions apply, so check with your attorney general or an attorney.
Should I ever pay in full before the work starts?
The FTC says scammers often ask for payment of the entire job before any work begins. Pay in steps tied to finished work, and hold the last payment until you are satisfied.
Sources
- FTC: Cooling-off Period for Sales Made at Home or Other Locations (rule page)
- FTC: FTC Approves Changes to Cooling-Off Rule (January 2015)
- FTC Consumer Advice: How to Avoid Scams After Weather Emergencies and Natural Disasters
- California CSLB: Contracts and Binding Agreements
- California CSLB: Terms of Agreement, home improvement contracts consumer guide
- Maryland Home Improvement Commission: Maryland Home Improvement Contracts
- Maryland Home Improvement Commission: FAQ on what counts as home improvement
- Mass.gov: Home Improvement Contract Requirements, Details, and Sample Language
- Oregon Construction Contractors Board: Disaster Scams Prevention Booklet
- 16 CFR Part 429, full text of the Cooling-Off Rule (Cornell Legal Information Institute, not an official copy)
Checked on November 20, 2026. Deposit limits, contract rules, licensing and cancellation periods vary by state and sometimes by city. The three states are examples, not a rule for your address, and the FTC rule details come from the rule text and the FTC's 2015 announcement. Ask your state licensing board or attorney general's office what applies to your job. This page is general information, not legal advice.
Next on the lot
-
Quote guide
Contractor licenses and insurance
How licensing differs by state and trade, and how to verify a certificate of insurance.
-
Quote guide
Change orders, warranties and lien waivers
Sign each change in writing, attach the warranty and learn how liens and lien waivers work.
-
Quote guide
Compare bids side by side
A fence bid $700 lower by the foot ends up $640 higher once removal, gate and permit are added.