Scams
When someone knocks and offers to do your yard work today
The patterns behind uninvited tree, paving and landscape offers, the checks the FTC and state offices recommend, and what the cancel rule says.
By TerraElm Editorial Team Updated 7 min read
- Federal cancel right
- 3 business days
- Door-to-door threshold
- $25 at your home
- Report fraud at
- reportfraud.ftc.gov
- First move
- Slow down, then check
The short answer
An uninvited offer is not always a scam, but the FTC and state attorneys general describe the same tactics again and again: pressure to start today, a low price from "leftover" materials, a "free" inspection that turns urgent, and a demand for cash or full payment up front. Check the license with your state, get written bids and a written contract, and pay by card or check. The FTC's Cooling-Off Rule gives three business days to cancel many sales made at your home.
Why uninvited offers get a second look
The FTC describes home repair scams this way: someone comes to your door or calls, offers a fix, often after a flood, windstorm or other disaster, then pushes you to act fast, asks for cash or offers to arrange financing. The result can be a company that takes your payment and does no work, poor repairs or a loan that puts your home at risk. Be careful with any offer to arrange financing at your door, because the loan is a separate contract with its own terms. Minnesota's attorney general says door-to-door scams increase in warm weather, and that some scammers move from town to town.
Yard and tree work fits the pattern, because the damage is visible from the street and the job seems small. The checks below take a few minutes and work for any uninvited offer.
Patterns that show up again and again
| What you hear or see | What to do | Who says so |
|---|---|---|
| "We're in the area" or "we noticed damage to your trees or yard" | Do not decide at the door. Ask for a registration or license number and references. | Massachusetts Attorney General |
| "We have supplies left over from another job in your neighborhood" | Treat a low price built on leftovers as a reason to slow down. Shop around. | Minnesota Attorney General |
| A "free inspection" that quickly becomes an "urgent" repair | Get a second opinion and written bids from other businesses. | Oregon Construction Contractors Board |
| Immediate clean-up or repairs after a storm | Be cautious. Unlicensed workers and scammers often show up in disaster areas. | FTC Consumer Advice |
| Cash only, or the whole price before work starts | Walk away from a demand for cash up front. Pay by card or check. | FTC; Massachusetts Attorney General |
| "You don't need a license for this" | Look up the license with your state or county government. | FTC Consumer Advice |
| A request to sign your insurance check over | Do not sign it over. Ask your bank about a certificate of completion. | FTC Consumer Advice |
The Oregon booklet adds two signs: out-of-state plates, and a crew that works from a parking lot or hotel. A single sign proves nothing. Several together are a reason to say no.
Tree work after a storm
Storms bring the most uninvited tree offers. Oregon's booklet notes that disasters often call for tree removal or other landscape work, and that landscape contractors there are licensed by the state's Landscape Contractors Board, not the construction board. The lesson for any state is to ask which agency licenses the work, and to look the business up there.
What to do at the door
- Do not let the person in, and do not agree to anything on the spot. Minnesota's attorney general advises keeping unknown salespeople out of your home.
- Ask for identification and a license or registration number. Minnesota says salespeople must show an ID card, and many municipalities require contractors or door-to-door salespeople to hold a permit or license.
- Look the business up with your state board, and search its name with words like "complaint." See contractor licenses and insurance.
- Get written bids. The FTC suggests three. Compare scope and units in compare bids side by side.
- Read the contract and do not sign with blanks. Terms are in contracts, deposits and payment schedules.
- Pay by card or check, in steps tied to finished work, and hold the last payment until you are satisfied.
What the Cooling-Off Rule says
The FTC's rule page says the Cooling-Off Rule applies to door-to-door sales and gives you a right to cancel "within three business days of the transaction." The FTC's 2015 announcement keeps the dollar threshold at $25 for a sale at your residence and raises it to $130 for sales at other locations away from the seller's place of business, effective March 13, 2015.
The rule text says the seller must give you a receipt or contract, a notice of cancellation form and an oral explanation of your right to cancel, and must honor a valid notice by refunding payments within 10 business days. It excludes some sales: for example, one where you invited the seller to your home specifically for repair or maintenance of personal property (anything else sold during that visit is not excluded), and sales related to real property.
States add their own rules. Minnesota's attorney general says its Right to Cancel law gives three days for certain door-to-door purchases. Maryland's commission says its Door-to-Door Sales Act runs to midnight of the fifth business day, or the seventh if you are 65 or older. Whether a yard or tree job is covered is a legal question for your attorney general's office or an attorney.
Use your lot as the test
A real bidder asks about the lot: where the line runs, what the gate width is, where the lawn meets the beds, and who will request the 811 marks. Someone who wants to start digging today without asking is skipping steps. Know your line first: finding your property lines, and utility locates and the 811 color code.
Then put these questions to anyone who knocks. A real bidder can answer them on the spot.
- Which state or county agency licenses this work, and what is your number?
- Can you send the bid in writing, with units and line items, so I can compare it?
- Who will request the 811 marks, and when?
- What is the payment schedule, and what does each payment cover?
- Can I read the contract before I sign it, and keep a copy?
If you think you were scammed, report it at reportfraud.ftc.gov or call 1-877-FTC-HELP, and tell your state attorney general's consumer office.
Questions homeowners ask
Is every door-to-door offer a scam?
No. But the tactics are common enough that the FTC and state offices tell you to check the license, get written bids and a contract, and avoid paying cash or the full price up front.
Can I cancel after agreeing to work at my door?
Often, within three business days under the FTC Cooling-Off Rule, and some states give more. Exclusions apply, including some visits that you asked for. Ask your attorney general's office or an attorney.
How do I check a tree or yard business?
Ask which agency licenses that work in your state, then look the business up there and read the complaint history. See contractor licenses and insurance.
A crew says it has leftover materials and a low price. What now?
Minnesota's attorney general lists this as a common pitch. Slow down, get written bids from other businesses and do not pay cash in advance.
Sources
- FTC: Cooling-off Period for Sales Made at Home or Other Locations (rule page)
- FTC: FTC Approves Changes to Cooling-Off Rule (January 2015)
- FTC Consumer Advice: Home Repair Scams
- FTC Consumer Advice: How to Avoid Scams After Weather Emergencies and Natural Disasters
- FTC: Winter Storm Elliott, how to avoid clean-up and repair scams
- Minnesota Attorney General: Home Improvement Scams
- Massachusetts: Avoiding Home Improvement and Contractor Scams
- Oregon Construction Contractors Board: Disaster Scams Prevention Booklet
- Maryland Home Improvement Commission: Maryland Home Improvement Contracts
- 16 CFR Part 429, text of the Cooling-Off Rule (Cornell Legal Information Institute, not an official copy)
Checked on November 20, 2026. Licensing, door-to-door selling permits and cancellation periods vary by state and by city; the states named are examples. The cancel-rule details come from the FTC rule page, its 2015 announcement and the rule text. This page is general information, not legal advice.
Next on the lot
-
Quote guide
Contractor licenses and insurance
How licensing differs by state and trade, and how to verify a certificate of insurance.
-
Quote guide
Contracts, deposits and payment schedules
Deposit caps differ: 10% or $1,000 in CA, one third in MD and MA. Pay in steps and know your cancel right.
-
Job
Tree removal and stump grinding
Permit triggers, how to measure trunk diameter, stump options, and how removal and grinding are priced.