Skip to content
TerraElm

Trees

After a storm, make the area safe first and decide about the tree second

Who to call, what stays off limits, how extension guides judge whether a tree can be saved, and how to hire, document and compare storm work.

By TerraElm Editorial Team Updated 8 min read

Wire down or touching
Stay back, call utility
Save or remove
About half the crown
Hiring
Never pay in advance
Insurance
Depends on your policy
Illustration: a lot plan with a house, a fallen tree across the back fence, a utility line shown with a warning flag, and a clear zone drawn around it

The short answer

Treat every line as live and call the utility about any wire that is down or touched by a tree. Do not climb, and leave hanging limbs and chain saw work to a qualified arborist. Utah State Extension says a tree with half or more of its canopy undamaged should recover, and it suggests a professional opinion on removal when more is damaged. Photograph damage before cleanup, ask your insurer what your policy covers, and be wary of door-to-door crews.

First hour, first rule

Start with people and wires. If anyone is hurt, call 911. If a tree is touching a line or a line is down, stay back and report it to the power company. Utah State University Extension tells owners not to approach lines or guess which wires are dangerous or safe. FEMA's cleanup guidance says never to touch, cut, remove or pile debris on downed power lines. An Arkansas Forestry Commission factsheet, republished by the USDA Forest Service, says to treat all lines as live. Penn State Extension adds that you should avoid power lines even if the power is off.

Who to call first
SituationCall
Someone is injured or there is a fire911
Tree on or touching a power line, or a line is downYour electric utility, from a safe distance
Debris threatens public health or safetyYour local emergency manager, per FEMA
Tree on the house, fence or garageYour insurer, then a qualified arborist
Tree is damaged but nothing is touching a wireA qualified arborist for an assessment

Save it or remove it

Hasty cleanup can remove trees that would have survived, according to the Texas A&M Forest Service. Extension guides give rough tests you can use to decide whether to call a professional. They are not a verdict on any one tree.

Rules of thumb from extension and forestry guides
SourceWhat it says
Utah State University ExtensionWith 50% or more of the canopy undamaged, a tree should recover; with more than 50% damaged, consider calling a professional about removal
Arkansas Forestry Commission, via USDA Forest ServiceA tree can usually be saved if more than half its top remains; consider removal if the trunk is split, more than half the top is damaged, or the tree leans from root damage
Utah State University ExtensionCheck for large hanging branches, a broken top, a split trunk, a leaning or uprooted tree, and a broken leader

Older, slow-growing trees recover more slowly, Utah State adds. Penn State Extension says codominant stems are weakly attached and common storm failure points, and that if the tree is not an immediate hazard, patience in finding a qualified arborist is better than rushing into work. A second opinion before removal is also advised. Read arborist assessments and tree health for what the assessment should include, and tree removal and stump grinding for permits and scope.

Do not top a damaged tree. The Texas A&M Forest Service says topping leaves stubs that sprout weakly attached branches, cuts the foliage the tree needs to recover, and makes a topped, storm-damaged tree more likely to die. If the tree is an oak in Texas and cleanup cuts fall between February and June, the agency says to paint new wounds right away, because oak wilt spreads then. Wounds the storm made earlier do not need it. Elsewhere, ask your county extension office.

Check your lot and the rules

Before a removal, ask your city whether the tree is regulated. Cities such as Portland, Oregon, and Austin, Texas, have separate paths for dead, dying or hazardous trees, and Portland treats a tree blocking a public street as an emergency. Austin asks for photos of the whole tree and of the defect with its application for trees declining beyond treatment or an imminent hazard. Rules differ by city, so call your permitting or urban forestry office. More in permits for outdoor projects.

A tree that fell from a neighbor's lot, or one that straddles the line, raises questions of ownership and liability. Those are legal questions: ask your insurer, the city and an attorney. Your survey helps; see finding your property lines.

Documenting damage and calling the insurer

What a policy pays depends on the policy, so read yours or call your insurer or agent, and your state insurance department can answer general questions. The Maryland Insurance Administration offers these basics on its consumer page, which you should check against your own contract.

  • Photograph first. Take pictures of all damaged property before debris is removed, because the policy will likely require proof of loss.
  • Damage to structures. The agency says damage to a home or an insured structure such as a fence or detached garage is generally covered even when the tree was a neighbor's.
  • Tree removal. It says removal is typically covered only up to a limited amount, usually between $500 and $1,000, per event rather than per tree.
  • The trees themselves. It says wind, snow or ice damage to trees and shrubs is generally not covered, with small caps on the limited cases that are.
  • Before cutting. Check your policy first, as the Arkansas factsheet advises, since some cover tree work when structural repairs are needed.

After a large storm, local governments may organize debris pickup. The Maryland page says you may be asked to sign a "Right of Entry" form so crews can come onto your property. Watch for announcements from your city or county, and ask the emergency management office before hiring a contractor to move debris to the curb. That page states no date, so confirm current limits with your insurer.

Hiring after a storm

Be wary of workers who knock on the door without a uniform, vehicle sign or ID. NC State Extension says these door knockers are common after storms, and that you should never be rushed by bargains and never pay in advance. Penn State warns of uninsured "tree specialists" who appear after storms. Look for an ISA Certified Arborist, ask whether they will work to ANSI A300 pruning standards, and get proof of liability and workers' compensation insurance, confirmed by calling the insurer. ISA Certified Arborist is a voluntary credential, not a state license.

Written scope

Name the trees, the cuts, the cleanup, who keeps the wood and the start and end dates.

Unit and cap

A per-tree or whole-job total, or an hourly bid with a "not to exceed" amount, as NC State advises.

Insurance proof

A certificate sent by the agent and a call to confirm it is current.

Payment terms

No advance payment. Tie any deposit and final payment to the work.

Read unsolicited offers and yard work scams, contractor licenses and insurance and contracts, deposits and payment schedules before you sign. When many trees are down, one crew may be slow to arrive, so make the area safe and wait for a qualified firm rather than accepting the first offer.

Before the next storm

A healthy, well-pruned tree with sound structure is better set up for the next storm, and Penn State notes that topping and similar cuts weaken structure and raise future storm damage and cost. Walk your lot, look for the warning signs in arborist assessments and tree health, and have any tree over a house, driveway or play area looked at. Schedule pruning with tree trimming and pruning. If you replace a tree, Penn State advises checking the space and growing conditions first and favoring large-canopy trees where there is room.

Steps after a storm

  1. Make people safe. Keep everyone away from the tree, hanging limbs and any wire.
  2. Call the utility about any line that is down or touched, and your emergency manager if debris threatens public safety.
  3. Photograph the damage from a safe distance before anything is moved.
  4. Call your insurer and ask what your policy covers before work begins.
  5. Get an assessment from a qualified arborist and a second opinion if removal is proposed.
  6. Sign a written scope with unit, total, dates and cleanup, and do not pay in advance.

Questions homeowners ask

A tree is touching a power line. What do I do?

Stay away from the tree and the line and call your utility. Utah State Extension says not to guess which wires are safe, and Penn State says to avoid lines even if the power is off. Never cut anything near a line yourself.

Can a damaged tree be saved?

Sometimes. Utah State Extension says a tree with 50% or more of its canopy undamaged should recover, and the Arkansas factsheet says a split trunk or more than half the top damaged points toward removal. An arborist can judge your tree.

Will homeowners insurance pay to remove a fallen tree?

It depends on your policy. The Maryland Insurance Administration says removal is typically covered up to a limited amount, often $500 to $1,000, and that damage to your home is generally covered. Ask your insurer before work starts.

Should I hire the crew that knocks on my door after a storm?

Be wary. NC State Extension says door knockers are common after storms and advises never paying in advance. See unsolicited offers and yard work scams.

Sources

Checked on November 20, 2026. This is general information, not legal or insurance advice. Insurance coverage, debris programs, tree permits and contractor licensing vary by policy, city, county and state. The coverage figures come from one state insurance regulator's consumer page, which shows no date, so confirm them against your own policy. Power utilities and emergency managers set their own procedures.