About TerraElm
TerraElm helps US homeowners learn their lot before anyone bids on work for it. We explain the lot, the job, the quote and the seasons, and we sell and install nothing.
Last updated
Who we are
TerraElm is the name of this website, terraelm.com, and of its weekly email, Lot Lines. TerraElm is the operator of the site. We are based at 24 Greenway Plaza, Suite 1900, Houston, TX 77046, United States.
You can reach us through the contact page, at [email protected] or by mail at the address above.
What this site is and is not
TerraElm is an educational site about planning, measuring and budgeting outdoor work on a US residential lot: lawn, landscape, trees, pests, fences, decks, patios and pools. It is organized around one idea. Know the lot first, then the work, then the quote.
- The lot covers size, lines, records, rules, utilities and water.
- Outdoor work explains what each job is, how it is priced and sold, and what to check.
- Quotes shows how to read units, line items and contracts.
- Seasons gives a reset for each of the four seasons.
- Lot math holds five calculators for areas, budgets, materials, fences, decks and pool volume.
TerraElm is not a contractor, landscaper, arborist, pest-control company, pool builder or lender. It does not sell or install anything. It is not a law firm, an engineering firm or a government agency. It has no lead form, and it does not refer you to businesses or pass your details to them.
Nothing here replaces your city or county. Codes, permits and prices change by place, so each page tells you which local office to ask.
How we write and check the pages
Pages are written and published under the byline “TerraElm Editorial Team.” That byline names a team, not a person with credentials. We do not present ourselves as licensed professionals, and we do not give advice for your particular lot.
Every page starts from sources. We read official ones first, such as city and county codes, state agencies, federal agencies and standards bodies, and we use commercial pages only for rough rules of thumb. Every article shows the date it was updated and a Sources box with the date the facts were checked.
The editorial policy describes the process in full. The methodology page shows the formulas and the data behind the calculators.
How the site is paid for
Reading TerraElm costs nothing, and so do the calculators and the email. The site may earn money from labeled sponsorships or ads in the Lot Lines email. We do not sell or share the email list, and we have no affiliate links at launch. How we make money explains each point and what would change if we added affiliate links.
Contact and corrections
If a page looks wrong or out of date, or a calculator gives a result that does not add up, tell us through the contact page. Include the page address and, for a calculator, the numbers you entered. We check each report against the source and fix what we can confirm.
You can also read how we handle your information in the privacy policy, and the limits of what the site can tell you in the disclaimer.