Terms of use
These terms set out the deal between you and TerraElm when you use the site, its calculators, its forms and the Lot Lines email. The parts on advice and liability matter most.
Last updated
Accepting these terms
Using terraelm.com (the “site”) means you accept these terms and our privacy policy. If you do not accept them, please leave the site. Here, “TerraElm,” “we” and “us” refer to the operator of the site, and “you” refers to whoever uses it.
The site is for adults in the United States. Subscribing to Lot Lines requires you to be at least 18.
What TerraElm is
TerraElm publishes general information on planning, measuring and budgeting outdoor work on a US residential lot. It also offers five free calculators under Lot math, a contact form and a weekly email called Lot Lines.
What TerraElm is not
TerraElm is not a contractor, landscaper, arborist, pest-control company, pool builder or lender. It is not a law firm, an engineering firm, a surveyor or a government agency. We do not:
- sell, install, build or repair anything;
- give quotes, bids or estimates for work;
- refer you to businesses or pass your details to them (the site has no lead form and no partner referrals);
- speak or negotiate for you with a business, an association or a government office;
- give legal, engineering, safety or financial advice.
Information, not advice
Articles, glossary entries, calculators and emails are general education. They cannot account for your whole situation, and none of them tells you to hire, buy, build, remove or spend. Read the disclaimer first. Then check each rule with the office that enforces it, and consult a qualified local professional on anything legal, structural or safety-related.
We aim to keep every page accurate and dated, in line with the editorial policy. Codes, laws and prices still change by place and over time, so a page can fall out of date or contain a mistake. Confirm anything important with the official source before relying on it.
Calculators
Results come from the numbers you enter and the formulas set out in how the lot math tools work. They are not quotes, bids, business estimates or engineering calculations. The job budget calculator’s regional price index compares consumer prices in a state with the national level, and it is not a price for any job. Actual costs and quantities vary with site conditions, materials, suppliers, labor and local rules.
The contact form
The form delivers your message to the TerraElm site team, and we may answer by email. We cannot advise on your own lot or project, or say whether a given business is a good choice. Please leave passwords, account numbers, Social Security numbers and other sensitive details out of your message.
Lot Lines, the weekly email
Subscribers get Lot Lines about once a week at the address they entered. Each issue has an unsubscribe link, and you can also ask us by email. You do not need to subscribe to use the site.
An issue may carry labeled sponsorships or ads. These are not recommendations by TerraElm, and we do not vouch for the business, its work, its prices or its license. How we make money describes the arrangement.
We do not text
TerraElm sends no text messages, and its sign-up form asks for no mobile number. If we ever start a text program, it will have a separate sign-up with its own consent, and these terms will describe it before it begins.
Links to other sites
The site points to government agencies, universities, standards bodies and other websites that we do not run. A link is not an endorsement, and we answer for neither the content nor the privacy practices of the place it leads. Anything you arrange with a business reached through a link or a sponsorship is between you and that business.
Acceptable use
You agree not to:
- use the site for anything unlawful or deceptive;
- submit a message or sign-up that is false, automated, or made for another person without that person’s permission;
- evade Turnstile or any other protection, test the site for weaknesses, or disrupt how it runs;
- harvest pages in bulk with bots or scrapers, other than search engines that follow our robots.txt file;
- use the site to send spam or to gather other people’s email addresses.
We may block anyone who breaks these rules.
Our content and your use of it
The text, tables, calculators, illustrations, design and code of the site belong to TerraElm or its licensors and are covered by copyright and other laws. You may read the site, run the calculators, and print or save a page for your own non-commercial use. You may link to any page. For anything beyond that, ask us before you copy, republish or sell our content. Other companies’ names and marks belong to their owners.
A message you send stays yours. You let us use it to answer you, to check and correct our pages, and to keep the records the privacy policy describes.
No warranties
The site comes “as is” and “as available.” So far as the law permits, TerraElm does not promise, expressly or by implication, that the site or any page, calculator or email is accurate, complete, current, free of errors or fit for your purpose, or that the site will always be reachable. Some places restrict disclaimers of implied warranties, so part of this may not apply to you.
Limits on liability
So far as the law permits, TerraElm and the people who work on it are not responsible for indirect, incidental, special, consequential or punitive damages, or for lost money, profit or data, arising from your use of the site, the calculators or the emails or from relying on them, even if we were warned such loss could occur. That covers cost overruns, permit or code problems, property damage, injury, and disputes with businesses, neighbors or associations.
Some places do not permit these limits, so they may not apply to you. Nothing here restricts liability that the law forbids us to restrict.
Governing law
Texas law governs these terms and any dispute connected with the site, leaving aside its conflict-of-law rules. Consumer-protection rights of your own state that cannot be waived stay in place.
Changes
We may revise these terms. A revision brings a new “Last updated” date at the top of this page. Continuing to use the site afterward means you accept the revised terms.
Contact
Send questions about these terms to [email protected], use the contact page or write to TerraElm, 24 Greenway Plaza, Suite 1900, Houston, TX 77046, United States.