Skip to content
TerraElm

Trees

A tree removal bid has two jobs in it: the tree and the stump

How to measure the trunk for local permit rules, what removal and grinding each include, and which lines to compare so two bids cover the same work.

By TerraElm Editorial Team Updated 8 min read

Permit trigger
Trunk size, set by city
Grinding depth
Typically 8 to 12 in.
Stump priced by
Widest point
Before grinding
Ask about 811 marks
Illustration: a lot plan with a house, one tree marked with an X, a circle around its stump, and a dashed underground line nearby

The short answer

Removal takes the tree down and out. Grinding is a separate job that chews the stump and large surface roots to about 8 to 12 inches down, according to Iowa State Extension, and the shavings usually stay in the hole. Many cities require a permit above a trunk diameter measured 4.5 feet up, and some also regulate dead trees. Hire a trained crew, never work near a power line yourself, and make every bid name the stump, the roots, the cleanup and the total.

Removal and grinding are two scopes

Taking down a tree means cutting it in sections or felling it, then hauling away the wood and brush. What is left is a stump with roots under it. Grinding is a second step, and many bids leave it out unless you ask. North Carolina State Extension says a removal contract should state whether stump and surface-root grinding, topsoil fill and seeding are included, and who keeps the firewood and chips.

  • Tree removal. Cutting the tree down, lowering the pieces and hauling the wood.
  • Stump grinding. Grinding the stump and large side roots below the surface.
  • Fill and finish. Removing shavings, adding soil, grading and reseeding. Often extra.
  • Wood. Whether logs and chips go with the crew or stay on your lot.
  • Not included. Replanting, fence or roof repair, and any permit fee unless the bid says so.

Measure the trunk for the permit rules

Local tree rules usually key on trunk diameter at 4.5 feet above the ground. Portland, Oregon, says a removal permit is needed for private trees 12 inches in diameter at that height and larger. Austin, Texas, tells owners to measure the circumference 4.5 feet above grade and divide by 3.14. Sloped, swollen, leaning and multi-stem trees have their own measuring notes on Austin's page.

Worked examples with the Austin method (diameter = circumference ÷ 3.14)
Tape reading at 4.5 ftDiameterAgainst Portland's 12-inch line
37.7 in. around37.7 ÷ 3.14 = 12.0 in.At the threshold
60 in. around60 ÷ 3.14 = 19.1 in.Above it
28 in. around28 ÷ 3.14 = 8.9 in.Below it

The arithmetic is simple, but the rules are not. Portland says private trees of any size can need a removal permit in certain overlay zones. Austin says trees under 19 inches are not regulated on residential property, but protected and heritage trees are. Both cities also have separate paths for trees that are dead or hazardous. Austin describes an application for trees declining beyond treatment or an imminent hazard, with a photo of the whole tree and a close-up of the defect. Portland lists a large dead or dying private tree as one that needs a permit. A tree that blocks a public street can count as an emergency there.

Your city may differ. Call the planning, permitting or urban forestry office before you sign, and read permits for outdoor projects. A tree near a property line or easement needs your survey first; see finding your property lines. Who owns a boundary tree is a legal question, so ask an attorney.

When removal is the right call

A tree is a candidate for removal when it is dead, structurally unsound near something it could hit, in the wrong place for its mature size, or damaged beyond recovery. Removal cannot be undone. Penn State Extension advises getting one before removal and having an ISA Certified Arborist evaluate the tree. See arborist assessments and tree health.

Timing matters for price. Ohio State Extension notes that removing a live tree is usually cheaper than removing a dead one, so a failing tree is best taken down before it dies. For storm-damaged trees, read storm damage and hazard trees first.

Stump options compared

Iowa State Extension lists the ways to deal with a stump. The right one depends on what you will build or plant there and how soon.

Stump options, as described by Iowa State Extension
OptionWhat it involvesTrade-off
Professional grindingGrinds the stump and large side roots, typically 8 to 12 inches downPriced from the stump's widest point; shavings stay in the hole and removing them costs extra
Natural decayLeave it, or drill holes and add slow-release fertilizer to speed rotCheapest, but can take 10 years or more
Chemical productsNitrate-based formulas, some with herbicide to stop resproutingHerbicides do not speed decay; follow the label
Digging outA trench, cut roots and leveragePractical mainly under about 12 inches across; chains and ropes can injure
Leave itStumps shelter insects, birds and small animalsCheck it often and remove it if it could fall on people or property

Burning a stump is not recommended: stump fires can burn for days, and many local governments prohibit burning. If you plan to replant on the spot, the same page says to clear the shavings before adding topsoil.

Safety and the lot

Grinding cuts into the soil, so underground lines matter. The Common Ground Alliance tells homeowners to contact 811 a few business days before any digging. Ask each bidder whether they request the marks, and ask your state 811 center if grinding at your depth is covered. Details: utility locates and the 811 color code. Also tell the crew where the septic tank, irrigation lines and any fence footings are.

Firewood from a removed tree can carry insects or disease to healthy trees, according to Utah State University Extension, so ask where the wood is going.

How the quote is built

Extension guides describe tree work as priced by the whole job or by the hour plus materials. A North Carolina State Extension guide adds that the contract should state a per-tree or whole-job total, and that an hourly bid should carry a "not to exceed" cap. Stump grinding is quoted differently: Iowa State says the price is based on the stump's widest point, so expect the stump line to scale with its size; ask whether the bid is per stump or by stump diameter.

Size and condition

Height, trunk diameter, lean and dead wood decide the crew size, the rigging and the risk.

Access

A fenced yard, a house in the way or a gate too narrow for a machine adds hand work.

Equipment

A bucket lift or crane is priced differently from a climbing crew. Ask which the bid assumes.

Stump and roots

Number of stumps, diameter, root flare, and whether shavings are hauled and the hole filled.

Cleanup and permit

Wood and brush hauling, who files the permit and who pays the fee.

Ask for the start and end dates, the specific trees, the cleanup and a total. Never pay in advance. Compare bids on one footing with quote units by the foot, the visit and the tree and check insurance in contractor licenses and insurance. Budget it in the job budget, and plan replacement trees where there is room to grow.

Steps to a clean removal

  1. Photograph the tree from the base to the crown and measure the trunk 4.5 feet up.
  2. Ask the city whether a removal permit, replacement tree or special application applies.
  3. Get a second opinion if the tree is large or the reason is health or structure.
  4. Check for lines overhead and underground, and ask who requests the 811 marks.
  5. Collect two or three written bids that separate the tree, the stump, the cleanup and the permit.
  6. Sign a contract with dates, scope, total, and what is left on site.

Questions homeowners ask

Do I need a permit to remove a tree on my own property?

It depends on the city. Portland, Oregon, requires a permit at 12 inches in diameter and larger, and Austin, Texas, regulates protected and heritage trees. Ask your planning or urban forestry office before anyone cuts.

Is stump grinding included in a tree removal quote?

Often not. NC State Extension says a contract should say whether stump and surface-root grinding, fill and seeding are included. Ask for them as separate lines.

How deep does a stump grinder go?

Iowa State Extension says professional grinding typically goes down 8 to 12 inches. Ask the bidder what depth they will grind to, and whether the shavings are removed.

Can I burn or chemically kill a stump?

Iowa State advises against burning, and many local governments prohibit it. Chemical products can include herbicide and do not speed decay. Follow the label, and read your local rules.

Sources

Checked on November 20, 2026. Permit thresholds, protected-tree lists and replacement rules vary by city and county; Portland and Austin are examples, not a rule for your address. Whether 811 covers stump grinding at your depth is a question for your state 811 center. Stump-grinding depth comes from one university page, and crews and machines vary.