Skip to content
TerraElm

HOA rules

An HOA adds a second rulebook to your lot

Where the rules are recorded, which outdoor jobs they usually reach, and how to get an approval you can show a contractor.

By TerraElm Editorial Team Updated 7 min read

Rules are recorded in
The declaration
HOA approval vs. permit
Two separate checks
Get every decision
In writing
Texas denial hearing
Ask within 30 days
Illustration: a lot plan with a dashed fence line, an approval stamp on a design form and a pink flag at one corner

The short answer

If your lot sits in a homeowners association, its declaration (often called the CC&Rs) can limit what you build, plant or paint, on top of city and county rules. Read the declaration and the design guidelines before you ask for bids. Then get the association's approval in writing. That approval does not replace a city permit, and a permit does not replace the approval.

Where an HOA gets its power

An association has authority because of recorded documents, not because the city says so. The Texas State Law Library calls the main one the declaration, short for the declaration of covenants, conditions and restrictions, or CC&Rs. In Texas a declaration is an instrument filed in the real property records of a county. Other states use other names, such as deed restrictions or restrictive covenants.

The practical result is two rulebooks for one lot. A fence can meet the city's height limit and still break the association's rule on color or material. The reverse also happens. You have to pass both.

Find the documents before you plan

You need more than the declaration. Collect the whole set, because the Texas State Law Library notes that amendments follow the steps in the declaration and can change what an older copy says.

  • The declaration and every amendment. Ask the association or its manager, check your closing papers, or search the county clerk's or recorder's real property records.
  • The design or architectural guidelines. These often hold the detail: allowed materials, colors, heights and where on the lot something may go.
  • The approval form and the review process. Ask who reviews requests, how long a decision takes and how to appeal.
  • Your plat and survey. The association may set its own distances from the line. See how to read your plat and survey.

What two states say about design review

State law sets some limits on how a review committee works. The two examples below show the kind of limit to look for. Yours may differ, so check your own state's statute and your documents.

Two examples of design review rules in state law
PlaceWhat the page saysSource
TexasThe committee's powers are usually set in the declaration. For associations with 40 or more lots, a denial must be in writing and explain the reasons. The owner may ask for a board hearing within 30 days of the notice, and the board must hold it within 30 days of the requestTexas State Law Library, CC&Rs guide
FloridaReview power exists only to the extent the documents state or reasonably imply it, and standards apply evenly to all owners. A denial must name the rule and the part of the request that does not conform. An association may not require a government building permit before it will review a requestFlorida Statutes, section 720.3035

Texas also lists items an association cannot prohibit but may regulate, including rain barrels, solar energy devices and flags. It names others it can neither prohibit nor regulate, such as installing grass during a watering restriction. Each category has exceptions, so read the statute or ask an attorney before you rely on one.

Outdoor jobs to check against the documents

Fences and walls

Height, material, color, style and distance from the line are common subjects. Check before you pick a style. See fence installation.

Trees and planting

Some documents cover removing or planting trees, front-yard plans and lawn type. See tree trimming and pruning.

Patios, decks and sheds

Look for rules on size, placement, visibility from the street and screening.

Water and energy items

Rain barrels and solar devices are covered by state law in some places, as the Texas example shows. Ask what yours says.

Steps to a clean approval

  1. Read the documents. Start with the declaration, then the guidelines. Note every rule that touches your job.
  2. Describe the job precisely. Size, materials, colors, locations and a sketch on your survey. Vague requests get vague answers.
  3. Submit on the association's form and keep a dated copy of everything you send.
  4. Wait for a written decision. A verbal okay from a neighbor on the board is not an approval.
  5. If denied, ask for the reason in writing and the appeal steps. Then change the plan or use the appeal process.
  6. Give the approval to your contractor. Make the signed scope match what the association approved. See compare bids side by side.

Common ways HOA projects go wrong

  • Reading only the old copy. Amendments can change a rule. Ask the association for the current set and the date of the last change.
  • Starting before the decision. A contractor who digs before you hold a written approval can leave you rebuilding or removing the work.
  • Approving a style, not a quote. If the approved fence is 6 feet of cedar boards, the contract should say the same, not something close.
  • Forgetting the neighbors' side. Ask the association whether it wants neighbors told about the request.
  • Assuming a rule is fixed. Boards change guidelines. Keep the version that was in force on the day you applied.

None of these cost much to avoid. They take a phone call, a dated copy and a clear scope. A bidder who has worked in your community may know the usual submission, but the association's own staff are the only ones who can tell you what the board requires.

Approval is not a permit

The University of Maryland Extension tells homeowners to get any permits or reviews required by the local government, a homeowners association or another regulating authority. Those are separate bodies with separate forms. Plan for both, and ask each office whether it wants the other's decision first. The Florida statute above, for one, says the association cannot make a building permit a condition of its own review.

Read permits for outdoor projects for how the city side works. Setbacks also stack: an association can set its own distances, and the city's still apply. See setbacks, easements and rights of way.

Whether a rule is valid, or whether an association can fine you, is a legal question. Ask an attorney licensed in your state, or your state's agency that oversees associations if it has one. TerraElm cannot give legal advice.

Questions homeowners ask

Where do I find my HOA's rules?

Start with the declaration and its amendments, recorded in the county's real property records. The association or its manager should also give you the design guidelines and the approval form.

Can an HOA stop a project the city already permitted?

It can if the project breaks the association's recorded rules. City permits and HOA approvals are separate reviews, so get both before work starts.

What if my request is denied?

Ask for the reason in writing and the appeal steps. In Texas, for associations with 40 or more lots, you may ask for a board hearing within 30 days of the denial notice. Other states and documents differ.

Do I need HOA approval for work that cannot be seen from the street?

It depends on the documents and your state. Florida, for example, bars rules on the interior of a structure that cannot be seen from the street, a neighboring parcel or common areas. That is one state's rule, not a national one. Ask in writing.

Sources

Checked on November 20, 2026. Association law varies by state, and each association's documents differ. The Texas and Florida rules above are two examples, not the rule for your address. Ask your association, your county clerk or recorder, and an attorney licensed in your state.