Pool volume and fill time
Pick the shape, enter the dimensions and the average depth. You get gallons, surface area and the hours to fill.
For a sloped floor, (shallow end + deep end) / 2 is a fair rough value.
Time a bucket under the hose to find yours.
- Volume
- —
- Cubic feet
- —
- Liters
- —
- Water surface
- —
- Fill time
- —
How it works
Volume is the surface area of the water times the average depth. A rectangle uses length times width; a round pool uses pi times the radius squared; an oval uses pi times half the length times half the width. One cubic foot holds 7.48052 US gallons. Fill time is gallons divided by your flow rate in gallons per minute, then by 60.
Worked example
A 32 by 16 foot rectangle at 5 feet average depth has 512 square feet of surface and 2,560 cubic feet, which is 19,150 gallons. At a hose flow of 10 gallons a minute, filling takes about 32 hours.
Free-form and kidney shapes do not fit these formulas. Split them into rectangles and circles, add the volumes, or use the builder's figure. Safety comes before arithmetic: read pool barriers and safety rules, and see pool ownership costs for what a pool adds to the yearly budget.