Pools
The pool you buy is the smaller bill; the pool you own is the longer one
The yearly cost drivers, what the Department of Energy says a cover changes, and a worked budget you can redo with your own numbers.
By TerraElm Editorial Team Updated 8 min read
- Cover vs heating cost
- Cut 50% to 70% (DOE)
- Cover vs chemicals
- Cut 35% to 60% (DOE)
- Cover vs make-up water
- Cut 30% to 50% (DOE)
- Prices in this guide
- Example only
The short answer
Yearly pool cost is the sum of energy, chemicals, water, opening and closing, insurance and repairs, and each moves with climate, pool size and what you do yourself. The Department of Energy says a cover can cut heating costs by 50% to 70%, chemical use by 35% to 60% and make-up water by 30% to 50%. Build your own budget from your utility bills and written quotes, and use the example below only to see how the arithmetic works.
The yearly cost drivers
Prices differ by region, pool size and how you run the pool, so this guide names the drivers and shows the arithmetic instead of quoting typical prices. Replace each line with a utility bill, a written quote or a receipt.
Energy
The pump and filter run on a schedule, and a heater adds more. Heater type, local electric or gas rates and the water temperature you want set the bill.
Chemicals
Sanitizer, pH adjusters, stabilizer and test supplies. Pool volume, sun, swimmers and rain change how fast they are used. See pool water chemistry basics.
Water
Evaporation, splash-out and filter cleaning lower the level, and refilling uses water. Your utility's rates and drought rules apply.
Opening and closing
A service price per visit, or your own time and supplies. See opening, closing and seasonal care.
Insurance
A pool can change your homeowners policy. Call your agent before you build and ask what they require, such as a fence, and what liability coverage they advise.
Repairs and replacement
Pumps, filters, heaters, covers, liners and surfaces wear out. Set aside money for them each year.
What a cover changes
The Department of Energy's Energy Saver pages say evaporation is the largest source of pool energy loss. They say covering the pool when it is not in use is a leading way to cut pool heating costs. They put the savings at 50% to 70% of heating costs, 35% to 60% of chemical use and 30% to 50% of make-up water. A cover helps most where you heat the pool or lose a lot of water to the sun and wind.
A safety cover also helps with drowning prevention, which is a cost you should not skip. Energy Saver says track-mounted safety covers keep people and objects out and can support the weight of several people. The Consumer Product Safety Commission lists covers with fences, gates and alarms as layers of protection, and advises keeping them in working order. Put the fence, the gate hardware, door alarms and a cover in the budget, as covered in pool barriers and safety rules.
Heater type and size
Energy Saver says heat pumps cost more up front than gas heaters but have lower annual operating costs and usually last longer. It also says heat pumps work best when outdoor air is above 50 degrees F and lose efficiency below that, and that a pool professional should do the heater sizing. Ask each bidder for the heater's size, fuel and the pool temperature it assumes, so quotes are comparable. The volume of water matters, so find it with the pool volume calculator.
A worked example with made-up numbers
The figures below are invented to show the arithmetic. They are not typical prices, and your costs may be far higher or lower. Swap in your own.
| Line | Example math | Example per year |
|---|---|---|
| Pump and filter electricity | $70 a month x 6 months | $420 |
| Chemicals and test supplies | $40 a month x 5 months | $200 |
| Make-up water | $15 a month x 6 months | $90 |
| Opening and closing visits | $300 + $300 | $600 |
| Added insurance cost | One yearly amount | $150 |
| Repairs reserve | One yearly amount | $400 |
| Total | 420 + 200 + 90 + 600 + 150 + 400 | $1,860 |
In the example, $1,860 spread over 12 months is $155 a month. A heater, a longer season or a service plan would add lines, and a cover or doing the opening yourself would remove or shrink some. The point is the structure: list each line, state the months it applies and add. Enter your own numbers in the job budget calculator alongside the build and fence costs.
What to ask before you build or buy
- Which equipment will the pool have, and what are its size, fuel and running hours?
- What do your utility bills look like for a pump and heater like this, and is there a drought or water-use rule?
- What will the insurance agent require, such as a fence, gate hardware or an alarm, and what does it add?
- Which parts wear out first, and what does each cost to replace, in a written quote?
- What does the builder cover in writing, and for how long?
For the way pool quotes and contracts are laid out, see what drives the price on your lot and pool types and installation. A manufacturer of fiberglass and vinyl pools says a vinyl liner is replaced about every ten years and a concrete pool needs resurfacing about every 10 years, so ask the builder for the expected life of the surface you choose.
When the costs land in the year
Pool costs arrive in a pattern. The opening visit and a round of equipment checks come in spring. Chemicals, power and make-up water run through the swim season. The closing visit lands in fall, and repairs can land anytime. Plan a monthly set-aside instead of a surprise bill. The lot-wide calendar in spring restart for the lot and fall closeout for the lot shows where the pool fits among the other jobs, and booking service outside the busy weeks is covered in off-season booking and asking for better terms.
DIY or hire
Skimming, brushing and testing are normal owner chores. Chemical handling needs care, since a CDC report found that at least 56.3 percent of the pool chemical injuries it studied happened at a residence, and it advises reading the label and safety data sheet and never mixing pool chemicals. Heater, plumbing and wiring work belong to licensed trades in most places, so check your state board. A service contract is a cost like any other: ask what it includes and how often the water is tested.
Questions homeowners ask
How much does a pool cost to own each year?
It depends on pool size, climate, heater, local rates, insurance and what you do yourself, so this guide gives no price. Use the worked example for the arithmetic and your own bills and quotes for the numbers in the job budget.
Does a pool cover really save money?
The Department of Energy says a cover can cut heating costs by 50% to 70%, chemical use by 35% to 60% and make-up water by 30% to 50%. Savings depend on how often you use the cover and whether you heat the pool.
Will a pool change my homeowners insurance?
It can. Call your insurance agent before you build and ask what they require and what liability coverage they advise. Your state insurance department can answer general questions.
Is a fence part of the cost of owning a pool?
Yes, and it is a safety cost rather than an option. The CPSC advises a fence of at least four feet around the pool, a self-closing, self-latching gate and, for doors to the pool, an alarm. Your local code may add to that.
Sources
- U.S. Department of Energy, Energy Saver: Swimming pool covers
- U.S. Department of Energy, Energy Saver: Heat pump swimming pool heaters
- Pool Safely (CPSC): Safety tips for parents
- U.S. Consumer Product Safety Commission: Safety Barrier Guidelines for Residential Pools (Pub. 362)
- Centers for Disease Control and Prevention: Pool Chemical Injuries in Public and Residential Settings, 2008-2017 (MMWR, May 17, 2019)
- Latham Pool: Fiberglass vs. concrete vs. vinyl liner pools (manufacturer comparison)
Checked on November 20, 2026. The savings percentages are the Department of Energy's, and savings differ by pool, climate and habits. The worked example uses made-up numbers and is not a price list. Electric, gas and water rates, insurance rules and licensing vary by utility, state and insurer, so check your own bills and ask your agent.
Next on the lot
-
Job
Pool types and installation
Pool types, permits, setbacks, 811 and the barrier, plus how to read a pool quote line by line.
-
Job
Pool water chemistry basics
pH 7.0 to 7.8, at least 1 ppm chlorine and the chemical safety rules, as CDC states them.
-
Quote guide
What drives the price on your lot
A 9,600 sq ft lot may hold only 6,700 sq ft of lawn. Area, access, slope and rules move a bid.