Pools
Closing a pool is plumbing, chemistry and a cover, in that order
What an opening and a closing visit include, how climate changes the list, and why the safety barrier never closes for the season.
By TerraElm Editorial Team Updated 8 min read
- Close when water is
- Under 65 F (retailer)
- Freeze steps needed
- Only where it freezes
- Test chlorine and pH
- At least twice a day
- Barrier and cover
- Keep in working order
The short answer
Closing a pool means balancing the water, lowering the level where the maker says to, protecting the pipes from freezing and fitting a cover. Opening reverses it. One pool retailer says to close only once the water stays below 65 degrees F, and freeze steps matter only where the ground freezes. Follow your pool maker's instructions, never drain a vinyl or fiberglass pool on your own, and keep the fence, gate and cover working all year.
What closing and opening include
A closing starts after the swimming season and protects the pool until the next one. An opening wakes it up again. Both are mostly checklists, and the list changes with the pool type and the local winter. These are the parts a service visit usually names.
Water
Clean the pool, balance the water and set the level for the cover or the winter. The next article covers the numbers in pool water chemistry basics.
Equipment
Pump, filter, heater and chlorinator are drained, cleaned or disconnected for the cold, then reconnected and primed in spring.
Lines and fittings
In freezing climates, plugs go in the skimmer and return lines and the plumbing is cleared or protected.
Cover
A winter or safety cover goes on and is anchored. Rain and melted snow on it must be pumped off.
What is not on that list is the plan for the pool itself. If the pool is empty, partly filled or covered, ask the maker or builder what the walls and liner can take. A retailer's closing guide says never to drain a vinyl or fiberglass pool and to follow the manufacturer's instructions.
When to close, and what changes with climate
One retail closing guide says to close only after the pool water is consistently below 65 degrees F. It treats the freeze steps as a separate group, "freezing climates only", and says the plumbing steps depend on whether the lines can be blown out. It also lists a freeze protector as an option in moderate freezing climates. Ask a local pool company or your pool's installer what your area needs.
| Climate | Typical closing approach | Opening approach |
|---|---|---|
| Hard freeze | Lower the water, clear and plug the lines, add a cover | Remove the cover, reconnect equipment, balance the water |
| Moderate freeze | A freeze protector is an option; ask the pool maker | Check equipment and chemistry before the first warm weeks |
| Rarely or never freezes | The freeze steps are skipped; ask your pool company what else a quiet season needs | Check equipment and the safety barrier before peak swim season |
The USDA hardiness zone map is a loose guide to winter lows. It is not a pool rule, so check your pool's manual. For the lot-wide calendar, see fall closeout for the lot and spring restart for the lot.
Closing steps, in order
- Clean and balance. Brush, skim and vacuum, then adjust the water. The CDC says to test disinfectant and pH at least twice a day while the pool is in use. The retailer guide lists closing ranges, but your pool maker's manual governs.
- Set the water level. It depends on the pool and the climate. The retailer guide says to lower it below the skimmer line if the plumbing can be blown out, and further down if it cannot.
- Protect the plumbing. Where it freezes, turn off power, drain the equipment, plug the lines and use only pool antifreeze. The guide warns against automotive antifreeze.
- Fit the cover. Size it for the pool, center it and anchor it as the manufacturer says. Avoid hanging weights from the grommets.
- Store chemicals safely. Keep them in the original containers, each in its own spot, cool, dry and out of reach.
- Check the cover monthly. Pump off rain and melted snow, and look at the water.
Opening steps and the chemical safety rules
Opening mostly reverses the closing. Clear debris and standing water from the cover before you lift it, take the plugs out, reconnect the equipment, fill to the working level and start the pump. Check the fence, gate latch, door alarms and drain covers before anyone swims, because the Pool Safely site says never to enter a pool or spa with a loose, broken or missing drain cover.
Opening is also when many people handle a lot of chemicals at once. A CDC report on pool chemical injuries found that at least 56.3 percent of the injuries it studied happened at a residence. Its advice is to read the label or safety data sheet, wear goggles, gloves and a mask, open one container at a time in a ventilated space, add chemical to water and never water to chemical, and never mix chlorine products with acid or any pool chemicals with each other. CDC storage guidance says to keep each chemical in its own spot, in its original container, dry and below 95 degrees F.
How a service quote is built
Opening and closing are sold in different ways. Many companies quote a package for each visit, and others bill by time plus chemicals and parts. Name the scope in writing, so two quotes mean the same job.
- Is the price per visit, per season or by the hour, and what does it exclude?
- Are chemicals, winter plugs, antifreeze and a cover pump included or billed separately?
- Does the visit include cleaning the cover, and who handles the cover storage?
- What happens if the pipes freeze after a closing, and what does the company cover?
- Who tests and balances the water at opening, and when do you get the readings?
The Energy Department says a pool cover is a top way to cut pool heating costs, and that covers also reduce chemical use and make-up water. Put the visit prices, a cover and the repairs reserve into pool ownership costs and your job budget.
DIY or hire
A small above-ground pool in a mild climate is a reasonable DIY job if you follow the maker's manual and the chemical safety rules above. An in-ground pool with a heater, a salt system or plumbing that freezes raises the cost of a mistake, since a freeze-damaged pipe can be costly to repair. Hire a pool company for the freeze steps, and a licensed electrician for anything that involves the pool's wiring. Look up the business with your state licensing board first.
Questions homeowners ask
When should I close my pool for the winter?
One retailer's guide says close when the water stays below 65 degrees F. Where winters are mild, many owners keep the pool running instead. Ask a local pool company about your area.
Can I drain my pool for winter?
Do not drain a vinyl or fiberglass pool on your own. A retailer's closing guide says to follow the manufacturer's instructions, and the maker can tell you what the walls and liner can take.
Does a closed pool still need a fence?
Yes. The barrier, the self-latching gate and the cover stay in working order all year. A cover with standing water is a hazard for children and pets.
Can I use car antifreeze in the pipes?
No. The retailer guide says to use non-toxic pool antifreeze only and not automotive antifreeze. Follow your pool maker's instructions for amounts.
Sources
- Pool Safely (CPSC): Safety tips for parents
- U.S. Consumer Product Safety Commission: Safety Barrier Guidelines for Residential Pools (Pub. 362)
- Centers for Disease Control and Prevention: Guidelines for Keeping Your Pool Safe and Healthy
- Centers for Disease Control and Prevention: Pool Chemical Injuries in Public and Residential Settings, 2008-2017 (MMWR, May 17, 2019)
- Centers for Disease Control and Prevention: Pool Chemical Safety (June 24, 2025)
- U.S. Department of Energy, Energy Saver: Swimming pool covers
- Leslie's: Pool closing guide (retailer guide)
Checked on November 20, 2026. Closing steps and the 65 degrees F rule come from a retailer guide and are rules of thumb, not a code; your pool maker's manual and a local pool company govern. What a freeze does to a pool varies by place, and so do licensing and barrier rules. The CDC chemical safety page is aimed at public pools, and the same cautions apply at home.
Next on the lot
-
Job
Pool water chemistry basics
pH 7.0 to 7.8, at least 1 ppm chlorine and the chemical safety rules, as CDC states them.
-
Job
Pool ownership costs
Yearly pool cost drivers, what a cover saves per the DOE, and a made-up budget you can redo with your numbers.
-
Season
Fall closeout for the lot
Fall checklist by climate: lawn seeding and feeding windows, leaves, tree checks and the handoff to winter.