A pool is a permit, a hole and a fence before it is water

The main pool types, what each one asks of your lot, and the checks that come before an excavator arrives.

By TerraElm Editorial Team Updated 8 min read

Priced as
Package plus extras
Permits to expect
Building and electrical
Underground check
Call 811 first
Barrier
Required before use
Illustration: a lot plan with a rectangular in-ground pool outline, a dashed setback line from each boundary, a fence line around the pool and a pink flag at each corner

The short answer

A pool is a shell, a circulation system, an electrical hookup, a deck and a safety barrier, and each can be a separate line on a quote. Expect building and electrical permits, a survey that shows the pool's distance to your lot lines, and a barrier that is inspected before the pool is used. Call 811 before any digging, and ask who pulls each permit.

The main pool types

In-ground pools are usually built one of three ways. A concrete pool is sprayed or poured over rebar, a fiberglass pool arrives as a molded shell, and a vinyl-liner pool has a wall system with a liner inside. Above-ground and on-ground pools sit on or near the surface, so they need much less digging. A pool that needs a barrier, a permit and a place for the water to drain is a project, not an appliance.

How the three in-ground types differ, from one fiberglass maker's comparison
TypeTime and upkeep it reportsWatch for
FiberglassUsable as soon as three days after the shell is deliveredShell size is limited by what can be hauled to your lot
Vinyl linerReady to use in a matter of weeks; liner replaced about every ten yearsLiner replacement is a recurring cost
Concrete (gunite)Roughly three to six months from permit to finish; resurfacing about every 10 yearsThe longest build and the most groundwork

That comparison comes from a manufacturer that sells fiberglass and vinyl pools, so treat the times as a seller's view and ask each bidder for a written schedule. An industry standard for new residential in-ground pools, ANSI/APSP/ICC-5, applies to permanent home pools deeper than 24 inches. It covers design, equipment, operation and installation. Ask a bidder whether the pool will be built to it.

What the lot has to supply

Start with the lot, not the catalog. Measure the space, find the lot lines and read the local rules, as in your plat and survey. Then check four things.

Setbacks

Maricopa County, Arizona, says a pool may not sit in the required front yard and must be at least 3 feet from all property lines. Your city or county sets its own distances.

Access

Ask how excavation equipment, a fiberglass shell or concrete trucks reach the site, and who repairs the gate, lawn or fence they damage.

Water out

Norfolk, Virginia, requires a pool to be fully drainable, with discharge to an approved place that does not become a nuisance to neighbors.

Overhead and buried lines

Note service wires above the site and call 811 for buried lines. See utility locates and the 811 color code.

The Common Ground Alliance says any digging calls for a request to your 811 center a few business days ahead, that state laws vary, and that you should confirm your contractor will make the call. Setbacks and easements explains the line you are measuring from.

Permits and inspections

Norfolk's pool guidelines are a useful picture of what a city may ask. A building permit is required for all new pools, hot tubs and spas, and electrical and gas or mechanical permits are required for pool bonding, heaters and other equipment. The application needs a survey showing the pool's dimensions, walks, fence enclosures and distances to the lot lines. Other places differ, so ask your own building office.

  • Who applies for each permit, and who pays the fee?
  • Is a plat or survey needed, and does the bidder's price include one?
  • Which inspections come before the pool is filled and before it is used?
  • Does the HOA need to approve the plan? See HOA rules and your lot.

Safety barrier during and after the build

Norfolk's guidelines say the owner must keep the pool protected by a compliant fence or barrier during construction and afterward, and that fence inspections must pass before the pool is used. The Consumer Product Safety Commission says a fence of at least four feet should surround the pool on all sides and that the water should be reached only through a self-closing, self-latching gate. A fence does not replace supervision. Read pool barriers and safety rules before you price the fence as an extra.

How a pool quote is built

Pool quotes are often written as a package price plus extras. Because the package can leave out decking, fencing and electrical work, compare the lines below instead of the total.

  • Pool and shell. Type, size, depth, steps and finish.
  • Excavation and haul-off. Digging, soil removal, backfill and any rock or water in the hole.
  • Equipment. Pump, filter, heater, cleaner and automation, with brand and model named.
  • Electrical and gas. Bonding, circuits, panel work and the permits.
  • Decking and fence. Often separate, and the fence is not optional.
  • Start-up. Filling, first chemical balance and a walkthrough on how to run the system.

Size the water first with the pool volume calculator. The formula is length times width times average depth, then times 7.48 gallons per cubic foot. In this example, a 16 by 32 foot pool with a 5 foot average depth holds 16 x 32 x 5 = 2,560 cubic feet, or about 19,149 gallons. Then put the pool into the job budget with the fence, deck and yearly costs.

Check the contractor and the contract

Licensing is set by the state, and it varies a lot. California's contractors board says pool contractors must hold a swimming pool license, classification C-53, and its pool guide says payments must match completed work and any change belongs in a signed written change order. Florida's licensing department lists swimming pool and spa work among the contractor categories that require certification or registration. Look up your state's board, check the license on its site, and read contractor licenses and insurance.

Steps from idea to permit

  1. Measure the lot and find the lines from your survey.
  2. Ask the building office about permits, setbacks, the barrier and the inspections.
  3. Request 811 marks and note overhead wires.
  4. Choose a type and ask each bidder for a written schedule.
  5. Get at least two quotes with the same scope, then compare them side by side.
  6. Sign a contract that names the permits, the barrier, the inspections and the payment schedule.

Questions homeowners ask

Do I need a permit for a pool?

Usually yes for a permanent in-ground pool. Norfolk, Virginia, requires building permits for new pools and electrical permits for pool bonding and equipment. Ask your local building office what applies.

How far from the property line does a pool have to be?

It depends on the local code. Maricopa County, Arizona, says at least 3 feet from all property lines and not in the required front yard. Your city or county may differ.

Which pool type costs the least to install?

There is no fixed answer, because price depends on size, soil, access and what the quote includes. Compare written quotes with the same scope using compare bids side by side.

Can I fill the pool before the inspection?

Ask first. Norfolk's guidelines say the fence inspection must be approved before the pool is used, and other places list their own steps. Your permit sets the order.

Sources

Checked on November 20, 2026. Permits, setbacks, barrier rules and contractor licensing vary by city, county and state; Norfolk and Maricopa County are examples, not rules for your address. Install times come from one manufacturer and are not a promise. Ask your building office, your state 811 center and your state licensing board.