Skip to content
TerraElm

Lawn removal

Removing a lawn is a measured project, and the rebate rules come first

The removal methods, what low-water design means in practice, why some utilities want to inspect the grass before it comes out, and how to compare quotes.

By TerraElm Editorial Team Updated 9 min read

Smothering time
About 6 to 8 weeks
Priced by
Square foot removed
Rebates
Vary by water utility
Before you start
Ask the utility and 811
Illustration: a lot plan with a rectangle of lawn outlined in dashes, a gravel path crossing it and a pink survey flag at the corner

The short answer

Lawn removal replaces turf with beds, paths, groundcover or a smaller lawn. Smothering with cardboard takes about 6 to 8 weeks, a rented sod cutter suits areas over 100 square feet, and a contractor prices the job by the square foot. Some water utilities pay for turf conversion, but they set their own rules, and at least two require approval or an inspection before the grass comes out. Check that first, call 811 before digging, and keep turf where you actually use it.

What lawn removal and conversion include

Removing a lawn means killing or stripping the grass, dealing with what is left, preparing the soil and planting or covering the area. Low-water landscaping is the next half: plants and layout chosen to need little watering. Quotes may cover one half or both. Ask where the price ends.

  • Grass removal. Smothering, sod cutting or an herbicide, with disposal of the sod.
  • Irrigation changes. Capping spray heads, changing zones, adding drip lines. See sprinkler systems and irrigation service.
  • Soil work. Testing, loosening, compost where the soil needs it.
  • Planting and mulch. Plants, groundcovers, edging and mulch; see garden beds, mulch and edging.
  • Hardscape. Paths, patios or borders, if the plan has them.

Why water is the reason to do it

The EPA says residential outdoor water use in the United States accounts for nearly 8 billion gallons a day, mainly for landscape irrigation, and that the average household uses more water outdoors than on showers and laundry combined. Turf is not the only outdoor use, but it is often the biggest one you control.

Removal does not have to mean no lawn. New Mexico State University's xeriscape guide says turf has a place, because it cools the area, cuts glare and erosion and gives play space, but it should be limited to areas that are actually used. EPA WaterSense gives the same advice: use turfgrass only where it serves a purpose, and choose a low-water variety suited to your climate.

Ways to remove the grass

University of Maryland Extension describes three methods. They differ in time, effort and what they do to the soil. It also advises testing the soil first, especially if the pH may need adjusting.

Three removal methods from one extension guide
MethodTime and areaNotes from the guide
No-till smotheringAbout 6 to 8 weeks, or two to three months under a tarp or woven fabricCover grass with overlapping unwaxed cardboard, then 2 to 4 inches of compost. Best in fall, workable in early spring.
Slice and loosen with a spadeAreas under 100 square feetFlip the sod to dry and kill the roots, then mix it into the soil once completely brown.
Sod cutterAreas over 100 square feetRent a cutter, flip or cover the strips and wait until brown. Tilling smothered sod can bring weed seeds up.

An herbicide is a fourth option, and some crews use it. If one is proposed, ask for the product name, and follow the label. Rules for who may apply herbicides for pay vary by state.

Check your utility's rules before the grass comes out

Some water utilities and cities pay homeowners to replace turf. TerraElm does not promise any, and amounts and funding change. What these programs have in common is a rule about order of work. Two examples, both checked on the official page:

  • Southern Nevada Water Authority. Its Water Smart Landscapes page says you must complete a pre-conversion site visit before removing any grass, and that removing grass without approval makes the conversion ineligible. It also sets a time limit to finish the work and inspects afterward.
  • Austin Water, Texas. Its rebate FAQ says work started before approval does not qualify. At least 75 percent of the conversion area must be healthy turf, plants must cover more than 50 percent of the area once mature, and artificial turf is not eligible. Gravel and stone are limited for residential projects, and plants can go in only during the spring and fall windows.

What low-water design means

New Mexico State University lists seven principles of xeriscape: planning and design, efficient irrigation, mulch, soil preparation, appropriate turf, water-efficient plants and appropriate maintenance. It splits a yard into zones by water need, with the most water near patios and entries and little or none at the edges. EPA WaterSense likewise suggests grouping plants with similar needs and choosing regionally appropriate, low water-using and native plants.

Plan first

Mark where the lawn stays, where paths go and where beds start. The plan is the base for every quote; see landscape design and plans.

Match plants to your zone

Look up your USDA hardiness zone by zip code, then choose plants rated for it that suit your sun and soil.

Water the new plants

New plantings need water while they establish; ask your extension office how long. New Mexico State University says drip and bubblers suit beds and shrubs better than overhead spray.

Mulch the bare soil

Mulch cuts evaporation and weeds. EPA WaterSense warns that rock mulch can hold heat in sunny areas.

Measure the area and the material

Measure the lawn area as rectangles. A front lawn 30 feet by 20 feet is 600 square feet. Quotes for removal are usually priced by the square foot, and the utility rules above work in square feet too, so write the number down. The lot plan tool adds up irregular shapes.

For smothering, compost depth sets the order. The formula is area times depth in feet, divided by 27 for cubic yards. At 2 inches, 600 square feet needs 600 x (2 / 12) = 100 cubic feet, about 3.7 cubic yards. At 4 inches it needs 200 cubic feet, about 7.4 cubic yards. The material order calculator runs other depths.

How a removal quote is priced

TerraElm does not give prices for lawn removal. They depend on area, method, how far sod must be hauled, access for equipment, irrigation changes and the plants chosen. Ask each bidder to list the same lines:

  • Area removed, in square feet, and the removal method.
  • Sod disposal: hauled, or reused on site.
  • Irrigation: what is capped, moved or added.
  • Soil: testing, compost depth and area.
  • Plants: species, size and count, or a stated allowance.
  • Who handles any rebate paperwork, approvals and inspections.

Then compare them as in compare bids side by side.

DIY or hire

Smothering is a good DIY method, because it needs time, not skill. Sod cutters are heavy machines that cut into the top layer of soil, so call 811 and mark your sprinkler lines first. Hire out large areas, slopes, drainage changes and anything involving a wall; see retaining walls and terraces.

Timing

University of Maryland Extension says smothering works best in fall and can also work in early spring. Austin Water limits plant installation to spring and fall windows. Your county extension office has local planting dates for your hardiness zone.

Questions homeowners ask

Can I get paid to remove my lawn?

Some water utilities run turf-conversion programs, and each sets its own rules, such as approval before removal. Check your utility's page before you start. Many places have none.

How long does it take to kill grass without chemicals?

University of Maryland Extension says smothering with cardboard and compost takes about 6 to 8 weeks, and longer under a tarp. The same guide suggests a rented sod cutter for areas over 100 square feet.

Should I remove all of my lawn?

Not necessarily. New Mexico State University says to keep turf where it is used, for play and cooling, and to replace it where it is only decoration.

Do I need to call 811 before removing sod?

Call before digging or cutting deeply, and for planting. The Common Ground Alliance says many utilities sit just inches down. See the 811 guide.

Sources

Checked on November 20, 2026. Rebate programs are named only as examples of rules; no amounts are given because they change, and most areas have no program. Water rules, herbicide rules and HOA rules vary by city, county and state.