A retaining wall holds soil, and water is what pushes against it

Where permits and engineering begin, what drainage goes behind the wall, how terraces are counted, and what to check on the lot before anyone digs.

By TerraElm Editorial Team Updated 9 min read

Permit threshold
Often 4 ft, varies
Height measured
Footing to top of wall
Behind the wall
Gravel, drain, outlet
Before digging
Call 811, check lines
Illustration: a lot plan with a sloped back yard, two stepped terrace walls drawn as lines, a dashed easement and pink survey flags at the corners

The short answer

A retaining wall holds back soil, so a short block wall and a tall one are very different jobs. In the three places checked here, a permit starts above 4 feet, measured from the bottom of the footing, and engineered plans are required above that. Walls that carry extra load, and terraces set close together, can trigger a permit sooner. Plan for drainage behind the wall, confirm the property line and easements, and call 811 before anyone digs.

What a retaining wall job includes

A retaining wall holds soil at a change in grade. A terrace is a series of walls that turns a slope into level steps. The crew excavates, builds a compacted base, stacks or pours the wall, places drainage behind it, backfills and finishes the top. Ask which of those steps are in the price.

  • Excavation and base. Digging the trench and compacting a crushed-stone base for the first course.
  • The wall itself. Block, stone, timber or poured concrete. Each has its own method and limits.
  • Drainage. Gravel, fabric, a pipe and an outlet. Do not accept a quote without a line for it.
  • Reinforcement. Taller block walls may use geogrid, which the engineer or manufacturer specifies.
  • Backfill and cap. Soil placed in layers, then cap stones, steps and planting.
  • Not always included. Permit fees, engineering, a survey, haul-off of spoil soil and irrigation or plants above the wall.

When a permit and an engineer are needed

There is no single national height. Cities and counties set it, and the three official pages below agree on a rough line at 4 feet, but they differ on the details. Ask your building or planning office before you design or sign.

Three official pages, three versions of the 4-foot line
PlaceWhen a permit appliesEngineering and other notes
Portland, OregonBuilding permit for a wall more than 4 feet high, measured from the bottom of the footing to the top, or one supporting a surchargeWalls over 4 feet need stamped drawings and calculations from an Oregon structural engineer. A zoning permit may apply even if a building permit does not.
Saint Paul, MinnesotaPermit where the wall is taller than 4 feet at any point, measured from the base of the footing to the topManufactured block follows the maker's instructions, with an engineer if they call for one. Plans show drainage rock and any drain tile or weep holes.
Douglas County, ColoradoPermit and engineered design for a wall over 4 feet or one that carries a surchargePlans are stamped by a Colorado engineer, who also inspects during construction. HOA approval is recommended before applying.

A surcharge is extra load near the wall, such as sloped soil above it, a driveway, a patio, a pool or a building. Douglas County says to keep a surcharge at least twice the wall's total height away. For a 4-foot wall, that is 8 feet. Portland also says that sites with slope stabilization needs may need a site development permit. If the wall holds up a drive or a structure, ask the building office even when it is short.

How terraces are counted

Two low walls close together can act as one tall wall, because the upper wall loads the lower one. Douglas County treats walls spaced less than twice the height of the lower wall as a single wall for permit and engineering purposes. Its example: two 4-foot walls 4 feet apart count as one 8-foot wall, but spaced 8 feet apart they count separately. It also says a wall without engineered design cannot have more than one terrace.

That is one county's rule, not a national one. Still, it is the right question for any terrace plan: how far apart are the walls, and does the office treat them as one? Put the answer in writing before you buy block.

Drainage behind the wall

Soil is heavy, and wet soil is heavier and pushes harder. That is why permit offices ask to see drainage. The Saint Paul checklist requires the plans to show the amount and size of drainage rock behind the wall and any drain tile or weep holes. Portland's site development review looks at slope and retaining wall drainage.

Block manufacturer Western Interlock gives rules of thumb for a typical segmental wall. They are not a code, and your design or engineer comes first.

  • Dig at least 12 inches behind the wall for compacted clean crushed gravel, about 3/4 inch, placed in 4-inch layers.
  • Set the first course on about 6 inches of compacted crushed stone.
  • Add a perforated pipe at the base for walls taller than 2 feet, sloped at least 0.5 percent.
  • Use non-woven filter fabric to keep soil out of the gravel.
  • Run the pipe to a safe outlet, and keep the outlet clear.

Where that outlet goes matters on the lot. Water should not be sent onto a neighbor's property or into a sewer connection without checking local rules. See drainage and grading basics.

Property line, easements and 811

Saint Paul says no part of a wall may sit on or over a property line unless a recorded easement agreement covers every affected property. Douglas County says no wall goes over a line, or into an easement, without an executed agreement, and that the owner must verify utility and easement locations before excavation. Pull your survey first; finding your property lines and setbacks, easements and rights of way explain the records. Excavation reaches beyond the wall face, so measure from the line to the edge of the dig.

How a wall quote is priced

Walls are usually quoted by the square foot of wall face, or by the linear foot at a stated height. Face area is length times height. A 20-foot wall that is 3 feet high is 60 square feet. The material order calculator helps with the gravel: a 1-foot-wide drainage zone behind that wall is 20 x 3 x 1 = 60 cubic feet, or about 2.2 cubic yards, before any base stone or waste.

Height and length

Wall face in square feet, and the highest point. Height, not length, drives permits and engineering.

Material and system

Block, natural stone, timber or concrete. Ask for the product name and its installation manual.

Drainage

Gravel, fabric, pipe and outlet should be a line, with the depth behind the wall stated.

Permit and engineering

Who applies, who pays the fee and the engineer, and whether inspections are included.

Access and spoil

Machine access, soil hauled away and restoration of lawn or beds around the work.

TerraElm does not publish wall prices. They depend heavily on height, material, access and engineering, and a single number would mislead. Compare bids as in compare bids side by side.

DIY or hire

A low garden wall of manufactured block, built to the manufacturer's instructions where no permit is needed, is within reach of a patient homeowner, if you wait for the 811 marks and follow the drainage steps. Hire a contractor and an engineer when the wall is tall, tiered, near a building, driveway or pool, or on a steep slope. Drainage and the base are where shortcuts hurt. Check the contractor's credentials in contractor licenses and insurance.

Timing

Walls are dug and built when the ground can be worked, so the calendar depends on your frost and rain season. Ask the bidder how weather affects the schedule and who is responsible if rain floods the trench. The order of lot projects puts walls before beds and planting, since the dig disturbs everything near it.

Questions homeowners ask

How tall can a retaining wall be without a permit?

It depends on the city. Portland, Saint Paul and Douglas County all draw the line near 4 feet, measured from the footing, but surcharge and terraces change the answer. Ask your building office.

Do I need weep holes or a drain pipe?

Drainage is required on plans in some places. One manufacturer's guide recommends perforated pipe for walls over 2 feet. Follow your design, your engineer and your building office.

Can I build a wall on the property line?

Not without a recorded agreement in the two places that say so. Confirm the line from your survey and ask your local office.

Is a terrace one wall or two?

Douglas County counts walls spaced less than twice the lower wall's height as one wall. Other places differ, so ask.

Sources

Checked on November 20, 2026. Permit and engineering rules are examples from three places, not a rule for your address. The Saint Paul page cites the 2020 Minnesota codes and shows no revision date. Drainage dimensions come from a manufacturer's guide, not a code; your engineer, wall system instructions and building office set the binding details.