Pick the fence material by what fails first, not by the picture

What wood, vinyl and chain link ask of the ground, the posts and the owner, so you can compare quotes that name the same material and the same parts.

By TerraElm Editorial Team Updated 8 min read

Wood posts
Ground-contact rated
Vinyl hole, one maker
30 in or frost line
Chain link line posts
10 ft apart at most
Priced by
Linear foot
Illustration: a lot outline with three fence runs drawn along the boundary, each labeled with a material and a pink flag at the corner posts

The short answer

Every fence material fails at a different place. Wood posts fail at the ground line, vinyl needs room to expand and care in freezing soil, and chain link depends on its metal coating and wire gauge. Ask each bidder to write down the material, the post type and size, the hole depth and the hardware, then compare the quotes on the same footage. Local height and permit rules sit on top of any material choice.

Four materials, four different weak points

A fence is posts, rails, a skin (boards, panels, vinyl or wire) and hardware. The skin gets the attention, but the posts and the hardware decide how long the line stays straight. The table below sticks to what the standards bodies, makers and extension publications say, and it names the date or kind of each source.

What each material asks for, from the sources listed at the end
MaterialWhat the source saysAsk the bidder
Pressure-treated woodAn industry guide says posts need ground-contact treatment and that rails and pickets can be above-ground grade. A 1979 extension bulletin says decay at the ground line is the main reason posts fail.Which treatment rating is on the post tag?
Vinyl (rigid PVC)One maker's manual spaces posts about 96 inches apart for common panels and says to dig 30 inches deep or to the frost line. ASTM F1999 is the standard practice for installing it.Which maker's system, and which post size?
Chain linkA 1997 manufacturers' institute manual caps line-post spacing at 10 feet and lists zinc coating classes and wire gauges. ASTM F668 covers polymer-coated fabric.Which coating, which gauge, which mesh?
Ornamental steel or aluminumThis page did not open a standard or maker's manual for these, so it gives no numbers.Ask for the maker's finish spec and warranty in writing.

Wood fences: the post is the part to inspect

The Treated Wood Council guide says posts should be treated for ground contact. It treats rails and pickets as above-ground parts that should stay above the soil line. A University of Wisconsin-Extension bulletin from 1979, now hosted by the USDA Forest Products Laboratory, says posts in the ground "definitely should be pressure-treated." It adds that color does not tell you how well wood was treated, so read the stamp or label instead. If you want naturally durable wood, that bulletin says to choose posts that are mostly heartwood.

Both sources point at the same details. Cut ends and drilled holes expose untreated wood, and the industry guide says to brush a preservative on them in some cases. Water that pools on a post top invites decay, so trim the top to shed water or add a cap. Fasteners matter too: the guide calls for hot-dipped galvanized or stainless steel. The finish is a separate choice. The bulletin favors penetrating, pigmented stain over paint and says to let cut wood dry before you paint or stain it.

Vinyl fences: room to move and care with frost

Vinyl panels expand and contract with temperature, so a maker's manual leaves gaps. One system cuts panels a half inch shorter than the stiffeners in some styles and a quarter inch in others. Post spacing, hole width and depth follow that maker's tables, which change with wind exposure, so do not borrow numbers from a different brand. ASTM F1999, the installation practice, says it applies where frost penetration does not exceed 30 inches.

The same manual says to check local codes for frost depth. It also warns that concrete and rebar around posts in freeze-thaw climates can crack the posts over time, and that the warranty does not cover that cracking. In practice, ask where the bidder is setting posts relative to your frost line, and ask whether concrete is called for in your climate. Cleaning is simple: the manual names mild detergent and a plastic scouring pad.

Two chain link fences can look alike and differ in wire. The 1997 manufacturers' institute manual lists zinc coating classes by weight per square foot, along with wire gauges, and the manual sets light residential fabric at 11.5 gauge with a 2-1/8 inch mesh, up to 72 inches tall. It also limits line-post spacing to 10 feet, center to center, and sets concrete holes at least 24 inches deep, plus 3 inches for each foot of height over 4 feet. That manual is old, so ask the installer which current edition or maker's spec the job follows.

Vinyl-coated chain link is a separate product. ASTM F668 covers steel fabric coated with PVC or another polymer over a metal coating, in three classes by how the polymer is applied. Ask which class the quote means, because a thinner coat and a thicker coat can both be called "coated."

Compare the same fence on the same footage

Measure the run first, then divide by the post spacing the maker or manual allows and add one. For 100 feet of chain link at the 10-foot maximum, that is 10 spaces and 11 posts. For 100 feet of vinyl at about 8 feet (96 inches), the run needs 12.5 spaces, so round up to 13 spaces and 14 posts. Gates, corners and ends add posts. The fence and deck takeoff does this sum, and the material order tool turns it into a shopping list.

Posts

Material, size, hole depth and diameter, and whether each is set in concrete, gravel or both.

The skin

Board, panel or fabric type, height, and the coating or treatment rating written on the quote.

Hardware

Fastener metal, hinges, latches and gate posts. Gates are usually separate lines.

Upkeep

What you will stain, wash, tighten or replace, and how often the maker says to do it.

Then follow the steps in compare bids side by side. A bid that leaves out the post type or the hole depth is not a lower price. It is a different fence.

Timing, rules and DIY

Dig timing depends on frost and soil moisture, so ask the installer when the ground allows full-depth holes in your area. Permits, height limits and setbacks come from your city or county, and an HOA may limit materials or colors on top of that. Start with fence installation for the permit and layout steps, and read HOA rules and your lot before you choose a color.

A short run on a confirmed line can be a DIY job if you will wait for the marks and keep posts plumb. A long run is heavy work to keep straight. Vinyl systems come with a maker's manual, and the one cited here says its warranty excludes some damage, so read it. Whichever you choose, request the underground marks before any hole: see utility locates and the 811 color code.

Questions homeowners ask

Which fence material lasts longest?

The sources here do not rank materials. Each fails in a different place: wood at the ground line, vinyl at frost-cracked or over-tightened posts, chain link where the coating wears through. Compare coatings, ratings and maker's warranty terms in writing.

Can any wood go in the ground?

No. The industry guide and the 1979 extension bulletin both say posts that touch soil need ground-contact treatment, and lumber marked for above-ground use only should stay out of the soil.

Do vinyl fence posts always need concrete?

Not in every case. One maker's manual says concrete and rebar in freeze-thaw climates can crack posts, and the warranty does not cover it. Follow your maker's instructions and ask your building office about frost depth.

Do I need a permit for a vinyl or chain link fence?

Permit rules depend on the city, the fence height and sometimes the lot line, not only the material. Start with fence installation, then ask your building or planning office.

Sources

Checked on November 20, 2026. Post depth, spacing and coating figures come from one maker's manual, a 1997 trade manual and an industry guide, not from a building code. Frost depth, height limits and material rules vary by city, county and HOA, so your building office and your HOA hold the binding answer. This page lists no prices because they depend on material, height, ground and region.