Skip to content
TerraElm

Termites

A termite inspection is a look at your foundation, not a promise about it

What an inspector checks, what the paperwork is called in your state, how treatment is sold, and what a termite contract should spell out.

By TerraElm Editorial Team Updated 8 min read

Inspect
Yearly; sooner on signs
Treatment types
Liquid barrier or bait
Warranty
Often 1 year, renewable
State form
Varies by state
Illustration: a lot plan with the house outlined, a dashed treatment line around the foundation and a flag at each corner of the house

The short answer

Termites work out of sight, so the usual first step is a written inspection by a licensed pest company. Extension sources recommend a yearly inspection, and an immediate one if you see swarmers indoors or mud tubes on the foundation. Treatment is a liquid soil barrier, a bait system or, for drywood termites, work on the wood itself. The report form, the license rules and the warranty terms vary by state, so read the contract before you sign.

What a termite inspection includes

An inspector looks at the accessible parts of the structure, inside and out, for live or past activity and for the conditions that invite it. North Carolina's agriculture department describes a visual inspection of accessible interior and exterior areas, including attached decks and porches, plus sounding of accessible wood near slabs and masonry. Inaccessible areas should be named in the report.

  • Swarmers. Winged termites. Indoors they usually mean an infestation somewhere in the house; outdoors near a stump they do not prove the house is affected. NC State Extension says swarming runs from late winter into September or October.
  • Mud tubes. Tubes of soil and wood bits on foundation walls or joists. A broken tube with live termites inside means activity; a dry, crumbling one may be old.
  • Damaged wood. Hollow-sounding or soft wood, sometimes with a thin gritty film.
  • Conducive conditions. Leaks, wet wood, and wood, cardboard or paper stored in a crawl space.

An inspection is a snapshot. NC State Extension notes that it does not guarantee termites or damage are absent, especially inside walls, and it advises keeping every inspection record, since damage cannot be dated without a known reference point.

Wood-destroying insect reports differ by state

When a house is sold, the buyer or lender often asks for a wood-destroying insect report. The National Pest Management Association publishes a common form, the NPMA-33, but states decide which form is legal. Three examples show how far the rules drift apart.

Three states, three answers to "which report form?"
StateWhat its agency saysSource
North CarolinaThe state Wood-Destroying Insect Information Report, WDIR 100, is the only legal form. A licensee or an employee of a licensed company issues it. It is not a warranty and does not assess the extent of damageNC Dept. of Agriculture and Consumer Services
GeorgiaThe Official Georgia Wood Infestation Inspection Report is the only form allowed for a transfer of real property. Other forms, including the NPMA form, are not permittedGeorgia Dept. of Agriculture
CaliforniaThe WDO Report, form 43M-41, supersedes the NPMA-33. A licensee may attach an NPMA-33 only after completing the state reportCalifornia Structural Pest Control Board

Texas goes a different way again: its agriculture department calls its form, SPCS/T-5, prescribed, with no revisions or omissions allowed. Ask the inspector which form your state requires, and ask your real estate agent or attorney whether a sale needs one. That is a legal question for them, not for this article.

How treatment works

Extension guides group termite treatment by the kind of termite. For subterranean termites, a Texas A&M extension guide lists soil barriers, bait systems and physical barriers. For drywood termites it lists removing or treating infested wood, heat or cold, and fumigation for large infestations. Which one fits depends on the species and the structure, and the inspector should name it in writing.

Liquid soil barrier

A treated zone in the soil around and under the foundation. Mississippi State Extension says liquid treatments can last 12 years or longer but can fail sooner when conducive conditions remain.

Bait system

Stations placed around the house and checked on a schedule. Mississippi State says bait can give control indefinitely if the service contract stays in force and the stations are maintained.

Wood treatment or fumigation

Used for drywood termites and some localized problems, and done by a licensed company.

Repairs

Treatment stops the insects. It does not replace damaged wood. Ask whether repair is in the bid, in the warranty or neither.

Mississippi State Extension states plainly that termite control is not a do-it-yourself project and should be done by a licensed company. Products and methods are set by the label and by state rules, so this article names no products and no rates.

What the lot has to do with termites

Termite control is a lot problem as much as a house problem. Moisture is the first item. Leaks, poor drainage and wet crawl spaces keep wood damp, and NC State Extension links leaks to aboveground infestations. See drainage and grading basics for how water should leave the lot.

Soil work matters too. NC State Extension warns that renovation or landscaping can break the treated soil barrier, and that skipping fixes an inspector reports can void a termite contract. Before you regrade, add beds or build against the house, tell the pest company and read garden beds, mulch and edging. A deck or patio that touches the foundation changes what the inspector can reach.

Priced and sold as a bid plus a contract

Treatment is quoted per structure, and the bid should come from a written inspection. A Texas A&M extension guide says that inspection report should identify active and inactive infestations, show a diagram of the structure, note conducive conditions, and give the number and location of planned treatments with an estimated cost. It also advises asking whether the price is firm. Prices differ with the size and shape of the foundation, the method, the number of visits and the repairs included, so no single figure fits. Put your own numbers in the job budget calculator.

Compare at least two bids on the same scope, using compare bids side by side. Then read the warranty line by line. The Texas A&M guide says a warranty should state excluded areas, the warranty period, renewal options and cost, whether the company must retreat or repair damage, and what owner actions void it. It also notes that a warranty covers the company's service, not the barrier itself.

  • Length. EPA says termite guarantees typically run one to five years. Tennessee's agriculture department says termite contracts there should carry a warranty of at least one year, renewable by mutual agreement.
  • Yearly fee. Ask whether an annual renewal fee applies. Mississippi State says an active contract usually includes a yearly inspection at no added charge.
  • What voids it. Virginia Tech Extension says a termite guarantee can be voided by structural changes made without telling the company.
  • What it pays for. Retreatment only, or retreatment plus repair of damage?

More on contract terms, renewal and safety is in pest control contracts and pesticide safety.

Who may do the work

Licensing is state law and varies. In Texas, the agriculture department lists business licenses, certified applicator licenses, technician licenses and apprentice registrations. Georgia says only a company licensed in the wood-destroying organism category can issue its report. Ask for the license, check it with your state agriculture or pesticide agency, and see contractor licenses and insurance for how to read what you are shown.

Timing through the year

Termites are active all year inside the soil and wood, so there is no off-season for an inspection. Book the yearly check when the crawl space and foundation are easy to reach, and move up the date if swarmers appear. NC State describes swarming from late winter into September or October in North Carolina, and your local extension office can give the dates for your area. A termite problem found while you plan other outdoor work is a reason to rethink the order of jobs: see plan the order of lot projects.

Steps to a termite plan

  1. Look first. Walk the foundation for mud tubes, soft wood and moisture. Note dates and photos.
  2. Book a written inspection from a company licensed in your state, and ask which report form it uses.
  3. Get two bids with the method, the diagram, the number of visits and what is excluded.
  4. Read the warranty for length, renewal, retreatment, repair and what voids it.
  5. Fix the lot. Moisture, stored wood and soil contact are the owner's part of the job.
  6. Keep every record and schedule the next yearly inspection.

Questions homeowners ask

How often should a house be inspected for termites?

NC State Extension recommends periodic inspections, since activity can go unnoticed for years, and an inspection right away if you see swarmers indoors, mud tubes or feeding damage. Many termite contracts include a yearly inspection.

What is an NPMA-33?

It is the National Pest Management Association's wood-destroying insect inspection form. States decide whether it is accepted. Georgia does not allow it for property transfers, and California's own report form supersedes it.

Can I treat for termites myself?

Mississippi State Extension says termite control is not a do-it-yourself project. Methods and products are set by the label and state rules, so ask a company licensed in your state.

Does a clear report mean the house is termite free?

No. North Carolina says its report is not a warranty and covers only what was accessible and visible at the time. Infestations can start after the inspection.

Sources

Checked on November 20, 2026. Report forms, license categories and warranty rules are state law and vary; the four states named are examples, not a rule for your address. The Texas A&M guide describes Texas practice and may predate current Texas rules, so use it for the questions to ask, not for the law.