Winter
Winter prep starts before the first hard freeze
An ordered checklist for draining water lines, closing a pool, checking trees and planning any digging once the ground freezes.
By TerraElm Editorial Team Updated 9 min read
- Climate groups
- USDA zones 3-5, 6-8, 9-11
- Frost dates
- Vary by year and place
- Max blow-out air
- 50 psi poly, 80 psi PVC
- Marks hidden by snow
- Request a re-mark
The short answer
Winter prep is about water that can freeze and limbs that can break. Drain or blow out irrigation lines before the ground freezes, close or cover the pool without giving up its barrier and supervision, check trees before storm season, and plan digging around frozen ground and 811 marks. Frost dates vary by year and place, so treat the month ranges here as scheduling windows and confirm your own dates.
Read the zones, then check your frost dates
The USDA Plant Hardiness Zone Map is based on the average annual extreme minimum winter temperature. It shows 10-degree F zones and 5-degree F half zones, and the current edition is the 2023 map. It helps you pick perennials. The map page does not list first or last frost dates.
Freeze dates come from NOAA. NCEI builds its freeze maps from the 1991 to 2020 U.S. Climate Normals. For the first fall freeze it shows a median date and an early and a late 10 percent date. A freeze is normally expected by the late date in 9 of 10 years. NCEI calls the maps generalizations, not predictions, and says elevation, latitude and nearby development shift the timing.
The spread is wide. NCEI projects a first freeze from mid-September to early October in the Midwest, and the Florida Keys have not recorded freezing temperatures. Frost dates vary by year and place. Look up the station nearest you in the NCEI first-freeze article, read the probability levels in the NC State Extension guide, and watch National Weather Service freeze watches and warnings in the season.
| Group | USDA zones | How to set your deadline |
|---|---|---|
| Cold | 3 to 5 | Finish water-line jobs before the ground freezes, working back from your station's late-10-percent first-freeze date |
| Moderate | 6 to 8 | Freezes come and go, so use the same late date and watch for NWS freeze watches |
| Hot, humid or dry | 9 to 11 | Some stations freeze only now and then, and some never do; check NCEI before buying freeze supplies |
The month ranges below are TerraElm scheduling windows. They keep jobs in order. They are not frost dates, and your own dates can fall earlier or later. Spring jobs are in spring restart for the lot.
The winter checklist at a glance
| Task | Zones 3-5 | Zones 6-8 | Zones 9-11 |
|---|---|---|---|
| Tree check, weak-limb pruning | August to October | September to November | October to December |
| Pool closing | September to October | October to November | Often stays open; ask your pool service |
| Sprinkler drain or blow-out | Late September to October | October to November | Often not needed; insulate exposed parts before a forecast freeze |
| Storm plan, hazard-tree list | October to November | November to December | Before your local storm season |
| 811 for any winter digging | Essential work only, November to March | As needed, December to February | As needed, all winter |
| Book winter work | Before the first freeze | Before the first freeze | Any time |
Cold climates: zones 3 to 5
- August to October: walk the trees. Look for broken, crossing or weakly attached limbs and dead wood. Ask a qualified arborist about anything large. Read tree trimming and pruning first.
- September to October: close the pool. Follow the cover maker's directions, then check the barrier and gate again. A closed pool still needs one.
- Late September to October: drain the sprinkler system. Shut the water off, drain, then blow out the lines before the ground freezes. See the irrigation table below.
- October to November: list your hazard trees. Note any tree near the house, a power line or a driveway, and keep an arborist's number handy. See storm damage and hazard trees.
- November to March: dig only when you must. Frozen ground and snow make locating harder. Plan projects for the thaw.
Moderate climates: zones 6 to 8
- September to November: check the trees. Prune weak attachments, and never top a tree. Hire a qualified arborist for large limbs.
- October to November: close the pool if it will sit idle. Confirm with your pool service whether your area gets freezes hard enough to need full winterizing.
- October to November: drain the irrigation system. Shut off the water, open drains, insulate exposed pipe and backflow devices, and ask a pro to blow out the lines.
- November to December: update the storm plan. Know which trees could reach a structure or line, and who you would call.
- December to February: request 811 marks as usual. Check that the marks are still visible before you dig.
Hot climates, humid or dry: zones 9 to 11
- Check your station first. NCEI shows whether a freeze is common, rare or absent where you live. Skip freeze steps that do not apply.
- October to December: check the trees and note any with weak attachments or dead limbs before your local storm season.
- Pools often stay in service. Ask your pool service what to change in a freeze. Barrier, gate and supervision rules apply all year.
- Irrigation may keep running. One Oklahoma State extension column says mild winters can still call for watering, so the choice depends on the weather. Insulate exposed pipe and backflow devices when a freeze watch is posted.
- Call 811 before every dig, in any month.
Sprinklers and irrigation lines
Water expands as it freezes, and trapped water can split pipe, valves and nozzles. The guides below do not give a calendar date. They tie the job to fall, before freezing weather. Several recommend a professional for the blow-out, because wrong air pressure can damage the system.
| Step | What it says | Source |
|---|---|---|
| Shut off the water | Close the valve between the supply and the backflow device, and do not force a stuck valve | Colorado State Extension |
| Backflow device | Never blow out a pressure vacuum breaker or reduced pressure device with compressed air; drain it and leave its valves partly open | Colorado State Extension |
| Air limits | Use 40 to 80 psi, with a cap of 80 psi for rigid PVC and 50 psi for flexible polyethylene; run two short cycles per zone, not one long one | Colorado State Extension |
| Drain valves | Inline drains do not remove the need for a blow-out, because settled lines form low spots | Colorado State Plant Talk |
| Who does it | Hire a certified irrigation professional; consumer compressors may not deliver enough air volume | University of Minnesota Extension |
| Exposed parts and timer | Insulate above-ground pipe and backflow devices; one guide says set the controller to off, another says keep it powered and cycle it weekly, so ask your installer | Oklahoma State, Minnesota and Colorado State extension |
Pools, covers and drowning prevention
Closing a pool is a sequence: balance the water, lower it to the cover's level, drain and protect the equipment, then cover it. An undated APSP industry bulletin gives water levels by pool type. Follow the cover maker's literature where it differs.
| Pool and cover | Water level |
|---|---|
| Vinyl-lined | About 1 inch below the skimmer mouth, lower where heavy rain or snow is common |
| Plaster, solid cover | 1 to 6 inches below the skimmer mouth or tile line, whichever is lower |
| Mesh cover or no cover | 18 to 24 inches below the skimmer mouth |
| Automatic cover | Do not drop below the bottom of the skimmer mouth |
| Concrete pool | If in doubt, leave it almost full; a drained pool can fail from hydrostatic pressure |
Water safety does not stop in winter. The Consumer Product Safety Commission says a cover adds a layer of protection but is not a substitute for a barrier. It also says non-rigid covers, such as solar covers, do not prevent drowning. Keep the fence, a self-closing and self-latching gate and the door alarm working. CPSC's guidelines put the fence at 48 inches or more. An outdoor bucket that fills with rain is a hazard too. Local code can add rules, so ask your building office. The details are in pool barriers and safety rules.
Trees, storms and power lines
Before the storm
Prune weak attachments and co-dominant trunks, and do not top trees. Topped trees regrow limbs that break more easily. NC State Extension Forestry suggests an arborist with TCIA accreditation.
During the storm
Stay indoors. Do not knock ice off branches, spray water on them or prop up sagging limbs.
Near power lines
Treat every utility line as live. If wires are involved, do not attempt tree work. Call the utility, and call a qualified arborist for the tree.
After the storm
Wait for ice to melt, clean up only minor debris from the ground and never run a chain saw alone. Consider an arborist with a tree risk assessment qualification.
Frozen ground and 811
The Common Ground Alliance says to call 811 a few business days before any digging, wait for every utility to respond and dig carefully beside the marks, not on them. Call again for each new job. Frost depth for posts and footings is set by local code, so ask your building office before you set one in a freeze.
| Condition | What the center says |
|---|---|
| Frozen ground | Locators struggle to drive a ground rod into frozen soil and may use a fence post or a rod near the foundation |
| New or melting snow | It can affect the visibility of locate marks; blown snow can cover fresh paint |
| Deep snow | Marks become less accurate, so clear a path to the marked area |
| Marks lost | Stop digging and ask the center for a re-mark rather than guessing |
| Ticket life | Minnesota requires digging within 14 days of the legal start, or a new ticket |
These details come from Gopher State One Call in Minnesota. Ticket rules and wait times differ by state, so read your state's 811 center. More in utility locates and the 811 color code.
Questions homeowners ask
When should I blow out my sprinklers?
Before the ground freezes. The extension guides tie it to fall and give no single date. Use the late-10-percent first-freeze date for your NCEI station as your deadline, and book the work early. See sprinkler systems and irrigation service.
Is my USDA hardiness zone my frost date?
No. The zone map is based on average annual extreme minimum winter temperature and lists no frost dates. Frost dates come from NOAA station data, vary by year and place, and the nearest station may differ from your lot.
Do I have to close the pool in a mild climate?
It depends on whether your area gets hard freezes. Ask your pool service. The barrier, gate and supervision rules apply either way. See pool opening, closing and seasonal care.
Can I call 811 when the ground is frozen?
Yes, and you should before any dig. Frozen ground and snow can slow locating or hide marks, so confirm the marks are visible and ask for a re-mark if they are not. Check your state's 811 center for its wait time.
Sources
- USDA Agricultural Research Service: 2023 USDA Plant Hardiness Zone Map
- NOAA NCEI: When to expect the first fall freeze
- NC State Extension: Interpreting freeze and frost probabilities from NCEI
- Colorado State Extension: Home sprinkler systems, preparing for winter
- Colorado State Extension, Plant Talk: Winterizing sprinkler systems
- University of Minnesota Extension: Properly preparing irrigation systems for winter
- Oklahoma State Extension: Tips for winterizing an irrigation system
- APSP bulletin: Winterizing tips for pools, spas and hot tubs (undated, hosted by Deschutes County, Oregon)
- CPSC: Safety barrier guidelines for residential pools
- CPSC: Drowning dangers do not end with pool season (2006)
- NC State Extension Forestry: Winter safety recommendations
- Common Ground Alliance: Before you dig (811)
- Gopher State One Call (Minnesota): Utility markings in snow
- Gopher State One Call (Minnesota): Winter locating 101
Checked on November 20, 2026. Frost dates, freeze risk, 811 wait times and pool rules vary by place; confirm them with NOAA or the National Weather Service, your county extension office, your state 811 center and your building office. The month ranges are TerraElm scheduling windows, not frost dates, and the extension guides above give no calendar dates for sprinkler or pool work. Method is on the methodology page.
Next on the lot
-
Job
Sprinkler systems and irrigation service
Zones, backflow testing, local watering days and how installation and service are priced.
-
Job
Pool opening, closing and seasonal care
Closing steps by climate, the cover, chemical safety, and how to read an opening or closing quote.
-
Job
Storm damage and hazard trees
Power-line safety, the save-or-remove test, insurance basics and how to hire after a storm.